PlanningRegister.ie
Observation pack · Dún Laoghaire-Rathdown County Council

Sylvan Haven, Stepaside Lane, Stepaside Village, Dublin 18, D18N927

Construction of a 4.5m above ground level, two-arch, stone clad, single storey…

Observations close 15 Dec 2026 18 days left
5 weeks from receipt (received 10 Nov 2026) · s.34 Planning and Development Act 2000 · art. 29 Regulations 2001 · fee €20 · council decision due 13 Jan 2027

The application

Reference
D26B/0576/WEB · full record
Authority
Dún Laoghaire-Rathdown County Council
Type
Permission
Status
Assessment Period
Site area
6,270 m²
Received
10 Nov 2026
Decision due
13 Jan 2027

The council’s feed cuts this description short. The full text and the drawings are on the council register linked in step 1.

How to submit an observation

  1. Read the file on the council register.Drawings, planning statement and site notices are at https://planning.agileapplications.ie/dunlaoghaire/application-details/?ref=D26B/0576/WEB.
  2. Write your observation.Quote D26B/0576/WEB at the top, give your name and the address the authority should reply to, and confine it to planning matters — zoning objective, height, overlooking, traffic, drainage, heritage. What you say here is what you can later appeal on.
  3. Pay the €20 fee.Every submission needs it; without it the observation is invalid and is returned. Dún Laoghaire-Rathdown County Council takes it online with the submission or at the counter.
  4. Submit before 15 Dec 2026.Online through the register above, or in writing to the Planning Department, Dún Laoghaire-Rathdown County Council. The test is the date the authority receives it, not the date you post it.
  5. Keep the acknowledgement.The council's receipt is your proof of a valid observation — see below.

Statutory basis. Section 34(1) of the Planning and Development Act 2000 (as amended) requires a planning authority to consider any submission or observation made to it in accordance with the Regulations. Article 29 of the Planning and Development Regulations 2001 (as amended) sets the window: a submission or observation must be received by the authority within five weeks beginning on the date of receipt of the application, and must be accompanied by the prescribed fee of €20. A submission received after the window, or without the fee, is invalid and the authority must return it.

After you submit: keep the acknowledgement. Under the 2024 Act it secures your right to appeal — only the applicant and a person who made a valid observation may bring the council's decision to An Coimisiún Pleanála, within four weeks of the decision. Making a valid observation is also what buys a right of appeal: under s.37(1) of the 2000 Act, only the applicant and a person who made a valid submission or observation to the planning authority may appeal the decision to An Coimisiún Pleanála (within four weeks of the decision). Missing the five-week window closes both doors.

What the site is zoned

CodeObjectivePlanIn force
P1
Rural
Objective B: B To protect and improve rural amenity and to provide for the development of agriculture.county development plan 2022 20281 Apr 2022 → 1 Apr 2028
P1
Rural
Objective B: B To protect and improve rural amenity and to provide for the development of agriculture.d n laoghaire rathdown county development plan 2022 2028 variation no 121 Apr 2022 → 20 Apr 2028

An application that accords with the zoning objective is hard to resist on principle; one that does not may be a material contravention, which the council can only grant by the s.34(6) procedure with its own notice and window.

Source: Dún Laoghaire-Rathdown County Council development plan zoning · fetched 11 Oct 2026, 23:12
SourceLicenceFetchedLink
Dún Laoghaire-Rathdown County Council development plan zoning—11 Oct 2026, 23:12open

Designations on or near the site within 100 m

  • Radon risk area × 2
    About 1 in 5 homes in this area is likely to have high radon levels · About 1 in 5 homes in this area is likely to have high radon levels

Nearby precedents within 500 m, last 5 years

Decisions

ReferenceDecisionDecidedDistanceDescription
C3A/0007/26Withdraw the application29 Sept 20260 mConstruction,erection or placing a detached in the rear of the garden of a princ
D26B/0413/WEBGrant permission9 Sept 2026439 mfor the construction of double storey side extension to the northwest of detach
REF0926S5 dec not exempt18 Feb 2026460 mProposed change from an existing human medical clinic to a veterinary clinic. N
D25B/0399Grant permission5 Sept 2025443 mThe proposed development will consist of a) removal of existing chimney, and b)
D25B/0104/WEBGrant permission22 Aug 2025362 mRefurbishing an existing derelict house and to extend the roofline over the exis
D25B/0382/WEBGrant permission20 Aug 20250 mthe installation of a stone sculpture (footprint: approx. 7.2 sq.m., total heig
D25B/0209/WEBGrant permission for retention9 Jun 20250 mThe retention of an unenclosed gazebo structure (footprint: approx. 9 sq.m., tot
REF8325S5 req ai22 May 20250 mLarge scale groun d works and wall building/stone cutting, removal of lorry

Appeals

ACP caseTypeOutcomeDecidedDistance
323623Planning AppealGranted with conditions2 Dec 20250 m
313430Planning AppealGranted with conditions22 Sept 2023399 m
313601Planning AppealRefused30 Jun 202384 m

If neighbours here have appealed before and lost, the inspector's report on that case is the single most useful thing to read.

What has happened on this file

  • 10 Nov 2026 New application · observations close 15 Dec 2026

Generated from the Planning Register store; nothing was fetched live for this page. Source: national planning dataset, fetched 24 Nov 2026, 23:00. Not legal advice — confirm the deadline with Dún Laoghaire-Rathdown County Council before relying on it.