SHORE ROAD , KILLYBEGS , DONEGAL PO
CONSTRUCTION OF A NEW BOAT HOIST DOCK (APPROX. 25X9M) AND ASSOCIATED EQUIPMENT ON THE EASTERN SHORE OF THE EXISTING BOAT YARD
The five-week window has passed. Late observations are returned unread. If the council has decided, the next door is the appeal window — but under s.37 only the applicant and those who made a valid observation may appeal.
The application
- Reference
- 2661524 · full record
- Authority
- Donegal County Council
- Type
- PERMISSION
- Status
- NEW APPLICATION
- Applicant
- not published by the national dataset — see the council register
- Units
- 0
- Floor area
- —
- Site area
- 692 m²
- Received
- 17 Aug 2026
- We first saw it
- 18 Sept 2026, 15:44
- Decision due
- 11 Oct 2026
- Decision
- N/a
The national dataset truncates descriptions (80 characters for DLR, 70 for Fingal) and omits the applicant. The full description and the drawings are on the council register linked in step 1.
How to submit an observation
- Read the file on the council register.Drawings, planning statement and site notices are at http://www.eplanning.ie/DonegalCC/AppFileRefDetails/2661524/0.
- Write your observation.Quote
2661524at the top, give your name and the address the authority should reply to, and confine it to planning matters — zoning objective, height, overlooking, traffic, drainage, heritage. What you say here is what you can later appeal on. - Pay the €20 fee.Every submission needs it; without it the observation is invalid and is returned. Donegal County Council takes it online with the submission or at the counter.
- Submit before 21 Sept 2026.Online through the register above, or in writing to the Planning Department, Donegal County Council. The test is the date the authority receives it, not the date you post it.
- Keep the acknowledgement.The council's receipt is your proof of a valid observation — see below.
Statutory basis. Section 34(1) of the Planning and Development Act 2000 (as amended) requires a planning authority to consider any submission or observation made to it in accordance with the Regulations. Article 29 of the Planning and Development Regulations 2001 (as amended) sets the window: a submission or observation must be received by the authority within five weeks beginning on the date of receipt of the application, and must be accompanied by the prescribed fee of €20. A submission received after the window, or without the fee, is invalid and the authority must return it.
What the site is zoned
No current zoning polygon covers this site in the store.
Designations on or near the site
Nothing designated within 100 m of the site.
Nearby precedents within 500 m, last 5 years
Decisions
| Reference | Decision | Decided | Units | Distance | Description |
|---|---|---|---|---|---|
| 2661436 | Conditional | 17 Sept 2026 | 0 | 488 m | CONSTRUCTION OF EXTENSIONS TO EXISTING FISH PROCESSING FACILITY TO ACCOMMODATE FISH PROTEIN PRODUCTION INCLUDING ASSOCIATED EXTERNAL TANKS AND EQUIPMENT AND ALL ASSOCIATED SITE WORKS |
| 2660932 | Refused | 9 Jul 2026 | 0 | 292 m | CHANGE OF USE OF PART OF EXISTING PREMISES TO PROVIDE STUDENT ACCOMMODATION CONTAINING 5 NO. BEDROOMS, ASSOCIATED COMMUNAL AREAS AND ANCILLARY DEVELOPMENT WORKS |
| 2660805 | Conditional | 25 Jun 2026 | 0 | 489 m | (1) RETENTION OF FORMER WINDOW PREVIOUSLY BUILT UP AND NOW RE-OPENED TO THE SIDE OF THE SINGLE STOREY PART OF THE EXISTING BUILDING AND (2) CHANGE OF USE OF THE SINGLE STOREY PART TO A COFFEE TAKE AWAY AND ASSOCIATED SITE WORKS |
| 2660305 | Conditional | 16 Apr 2026 | 0 | 373 m | REVISION OF THE DESIGN OF THE TRAINING STRUCTURE PREVIOUSLY PERMITTED UNDER PLANNING REF. NO. 24/60848 AND ASSOCIATED SITE DEVELOPMENT WORKS |
| 2562090 | Conditional | 22 Jan 2026 | 9 | 432 m | FILL MATERIAL ON SITE AND PERMISSION FOR CONSTRUCTION OF 9 NO. DWELLINGS, CONSISTING OF 7 NO. 2 STOREY DWELLINGS AND 2 NO. BUNGALOWS AND ALL ASSOCIATED SITE WORKS, INCLUDING RETAINING WALL STRUCTURES AND CONNECTION TO PUBLIC SERVICES |
| 2561229 | Conditional | 28 Aug 2025 | 0 | 263 m | (1) CONSTRUCTION OF A DOUBLE HEIGHT STORAGE BUILDING AS AN ADDITIONAL BAY ATTACHED TO THE EXISTING DOUBLE HEIGHT WAREHOUSE BUILDING (2) CONNECTION TO THE PUBLIC UTILITY NETWORKS AND PUBLIC DRAINAGE NETWORK, ACCESS ONTO THE ADJOINING ROADWAY AND ALL ASSOCIATED SITE DEVELOPMENT WORKS. |
| 2560632 | Conditional | 8 Aug 2025 | 0 | 489 m | FOOD TRUCK ON SITE & PERMISSION FOR (1) CHANGE OF USE FROM A FORMER STORAGE BUILDING TO A CAFE, COMMERCIAL KITCHEN, FRESH FISH SHOP AND TOILET ON GROUND FLOOR (2) SEATING AREA TO THE FIRST FLOOR INCLUDING TOILET AND STORAGE AREA & (3) ERECTION OF A TWO STOREY EXTENSION FOR STAIRWAY AND ALL ASSOCIATED SITE WORKS |
| 2461619 | Conditional | 30 Jan 2025 | 0 | 148 m | (1) CONSTRUCTION OF A NEW 2-STOREY OFFICE BUILDING WITH ANCILLARY FACILITIES, ASSOCIATED SITE WORKS AND NEW PHOTOVOLTAIC PANEL INSTALLATION ON THE ROOF AND (2) ERECTION OF A NEW SCULPTURAL ART PIECE ON SITE |
Appeals
No appeals within 500 m in the last 5 years.
What has happened on this file
- 17 Aug 2026 New application · observations close 21 Sept 2026
- 17 Aug 2026 Decision
Generated from the Planning Register store; nothing was fetched live for this page. Source: national planning dataset, fetched 18 Sept 2026, 15:44. Not legal advice — confirm the deadline with Donegal County Council before relying on it.