Observation pack · Donegal County Council

ARDESKIN AND BROOKFIELD , DONEGAL TOWN , CO. DONEGAL

CONSTRUCTION OF HOUSING DEVELOPMENT CONSISTING OF 98 NO. RESIDENTIAL UNITS AND COMPRISING (1) 28 NO. THREE-BEDROOM, SEMI-DETACHED, TWO-STOREY HOUSES, (2) 2 NO. THREE-BEDROOM, DETACHED, TWO-STOREY HOUSES, (3) 6 NO. THREE-BEDROOM, TWO-STOREY TERRACED HOUSES, ARRANGED IN BLOCKS OF 3 NO. UNITS, (4) 8 NO. THREE-BEDROOM, TWO-STOREY TERRACED HOUSES, ARRANGED IN BLOCKS OF 4 NO. UNITS, (5) 30 NO. TWO-BEDROOM TERRACED HOUSES, ARRANGED IN TERRACES OF 3 NO. UNITS, (6) 18 NO. TWO-BEDROOM APARTMENTS AND 6NO. FOUR-BEDROOM DUPLEX APARTMENTS, CONTAINED WITHIN 2 NO. THREE-STOREY BLOCKS WITH ASSOCIATED BIN STORAGE AND BICYCLE STORAGE AREAS, (7) A VEHICULAR ACCESS POINT FROM THE SOUTHERN SIDE OF HIGHFIELD ESTATE, UTILIZING THE EXISTING ACCESS ONTO THE OLD LAGHEY ROAD (L-2065-1), (8) A NEW VEHICULAR ACCESS ROAD ONTO THE OLD LAGHEY ROAD (L-2065-1), TOGETHER WITH INTERNAL ROADS, ASSOCIATED FOOTPATHS AND LIGHTING, CAR PARK PROVISION AND A NEW LANDSCAPED PEDESTRIAN WALKWAY CONNECTING THE OLD LAGHEY ROAD (L-2065-1) TO THE LANDSCAPED OPEN SPACE WITHIN THE PROPOSED SCHEME AND (10) ALL ASSOCIATED SITE WORKS, INCLUDING A STORMWATER ATTENUATION SYSTEM AND CONNECTIONS TO ALL PUBLIC…

Observations close 25 Nov 2026 7 days left
5 weeks from receipt (received 21 Oct 2026) · s.34 Planning and Development Act 2000 · art. 29 Regulations 2001 · fee €20 · council decision due 15 Dec 2026

The application

Reference
2661959 · full record
Authority
Donegal County Council
Type
PERMISSION
Status
NEW APPLICATION
Units
74
Floor area
8,268 m²
Site area
3.44 ha
Received
21 Oct 2026
Decision due
15 Dec 2026

The council’s feed cuts this description short. The full text and the drawings are on the council register linked in step 1.

How to submit an observation

  1. Read the file on the council register.Drawings, planning statement and site notices are at http://www.eplanning.ie/DonegalCC/AppFileRefDetails/2661959/0.
  2. Write your observation.Quote 2661959 at the top, give your name and the address the authority should reply to, and confine it to planning matters — zoning objective, height, overlooking, traffic, drainage, heritage. What you say here is what you can later appeal on.
  3. Pay the €20 fee.Every submission needs it; without it the observation is invalid and is returned. Donegal County Council takes it online with the submission or at the counter.
  4. Submit before 25 Nov 2026.Online through the register above, or in writing to the Planning Department, Donegal County Council. The test is the date the authority receives it, not the date you post it.
  5. Keep the acknowledgement.The council's receipt is your proof of a valid observation — see below.

Statutory basis. Section 34(1) of the Planning and Development Act 2000 (as amended) requires a planning authority to consider any submission or observation made to it in accordance with the Regulations. Article 29 of the Planning and Development Regulations 2001 (as amended) sets the window: a submission or observation must be received by the authority within five weeks beginning on the date of receipt of the application, and must be accompanied by the prescribed fee of €20. A submission received after the window, or without the fee, is invalid and the authority must return it.

After you submit: keep the acknowledgement. Under the 2024 Act it secures your right to appeal — only the applicant and a person who made a valid observation may bring the council's decision to An Coimisiún Pleanála, within four weeks of the decision. Making a valid observation is also what buys a right of appeal: under s.37(1) of the 2000 Act, only the applicant and a person who made a valid submission or observation to the planning authority may appeal the decision to An Coimisiún Pleanála (within four weeks of the decision). Missing the five-week window closes both doors.

Designations on or near the site within 100 m

  • Recorded monument × 2
    Ringfort - rath · R176075

Nearby precedents within 500 m, last 5 years

Decisions

ReferenceDecisionDecidedUnitsDistanceDescription
2660625Conditional17 Sept 202615 mCONSTRUCTION OF A DWELLING HOUSE, CONNECTION TO MAINS SERVICES AND ASSOCIATED SITE DEVELOPMENT WORKS
2660952Conditional9 Jul 2026409 mCONSTRUCTION OF A SUNROOM EXTENSION TO DWELLING HOUSE AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
2650066Unconditional18 Jun 20261322 mCONSTRUCTION OF 45 MIXED TYPE HOUSING UNITS TO INCLUDE (1) 9 NO. TWO STOREY, 4 BEDROOM DETACHED HOUSES WITH ATTIC UTILISATION (2) 16 NO. TWO STOREY, 5 BEDROOM SEMI-DETACHED HOUSES WITH ATTIC UTILISATION (3) 10 NO. 2 BEDROOM, GROUND AND FIRST DUPLEX APARTMENT UNITS IN TWO STOREY BUILDINGS (4) 10 NO. 2 BEDROOM GROUND FLOOR DUPLEX APARTMENT UNITS IN TWO AND A HALF STOREY BUILDINGS (5) 10 NO. 3 BEDROOM TWO STOREY DUPLEX APARTMENT UNITS IN TWO AND A HALF STOREY BLOCKS (6) DEVELOPMENT OF ESTATE ROADS, FOOTPATHS AND OPEN GRASSED AND PLAY AREAS, ALL WITH VEHICULAR AND PEDESTRIAN ACCESS VIA THE FARMLEIGH PARK ROAD ONTO THE OLD LAGHEY ROAD (L-2065-1) AND ALL ASSOCIATED SITE DEVELOPMENT WORKS, INCLUDING CONSTRUCTION OF BOUNDARIES, RETAINING STRUCTURES, STORM WATER DRAINAGE AND ATTENUATION WITH DISCHARGE INTO THE EXISTING PIPE NETWORK, FOUL WATER DRAINAGE AND CONNECTION INTO THE EXISTING MAINS PIPE NETWORK, MAINS WATER SUPPLY PIPES AND ALL ASSOCIATED PUBLIC LIGHTING, PUBLIC UTILITY NETWORKS SERVICES AND CONNECTIONS AND ALL ASSOCIATED SITE AND INFRASTRUCTURAL WORKS. A NATURA IMPACT STATEMENT (NIS) ACCOMPANIES THIS APPLICATION
2561230Conditional28 Aug 20250 mCHANGE OF USE FROM A DWELLING HOUSE TO A DOCTORS SURGERY AND PERMISSION FOR (1) CHANGE OF USE FROM A DOCTORS SURGERY TO A FAMILY RESOURCE CENTRE BUILDING WHICH WILL HAVE A RECEPTION AREA, OFFICE ACCOMMODATION, MEETING ROOMS, COUNSELLING ROOMS & ANCILLARY STAFF FACILITIES (2) GENERAL AMENDMENTS AND RENOVATION WORKS INTERNALLY TO FACILITATE THESE WORKS AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
2462167Conditional13 Feb 2025317 m(1) SEIDEANNA TÍ LÁITHREACHA A LEAGAINT AR AN TAOBH THEAS DEN TEACH, (2) SÍNEADH STÓR GO LEITH A THÓGÁIL AR AN TAOBH THEAS DEN TEACH ATÁ ANN FAOI LÁTHAIR, (3) ATHRAITHE INMHEÁNACH AR LEAGAN AMACH AN TÍ REATHA, ATHRUITHE INGEARCHLÓ INA MEASC, AGUS (4) CEANGAL LEIS AN SÉARACH POIBLÍ ATÁ ANN FAOI LÁTHAIR AGUS NA HOIBREACHA LÁITHREÁIN GO LÉIR A BHAINEANN LEIS
2351918Conditional18 Jun 20242355 m(1) CONSTRUCTION OF 2 NO. DETACHED 2 STOREY DWELLING HOUSES WITH ENTRANCES ONTO BEECH GROVE, (2) CONNECTION TO THE EXISTING PUBLIC FOUL AND SURFACE WATER DRAINAGE ALONG BEECH GROVE ROAD, AND (3) ALL ASSOCIATED SITE WORKS RELATING TO THE ITEMS ABOVE INCLUDING DEFINED BOUNDARY TREATMENT
2351397Conditional25 Jan 2024244 m(A) RETENTION AND COMPLETION OF SPORTS FIELD AND FOR THE CONSTRUCTION OF PEDESTRIAN WALKWAY AND PERIMETER FENCING, (B) CONSTRUCTION OF 6 NO. FLOODLIGHTS TO EXISTING SPORTS FIELD, AND (C) ALL ANCILLARY SITE DEVELOPMENT WORKS
2251812Conditional21 Dec 2022288 mCONSTRUCTION OF A STOREY AND A HALF DOMESTIC GARAGE TO REAR OF THE EXISTING HOUSE COMPRISING OF GARAGE AT GROUND FLOOR AND HOME OFFICE AT FIRST FLOOR WITH POLYCARBONATE CANOPY BETWEEN THE REAR OF THE HOUSE AND THE PROPOSED GARAGE AND ALL ASSOCIATED SITE WORKS

Appeals

ACP caseTypeOutcomeDecidedDistance
312223Refused17 Jan 2022356 m

If neighbours here have appealed before and lost, the inspector's report on that case is the single most useful thing to read.

What has happened on this file

  • 21 Oct 2026 New application · observations close 25 Nov 2026
  • 21 Oct 2026 Decision

Generated from the Planning Register store; nothing was fetched live for this page. Source: national planning dataset, fetched 3 Nov 2026, 23:01. Not legal advice — confirm the deadline with Donegal County Council before relying on it.