PlanningRegister.ie
Observation pack · Donegal County Council

8 ARD AOIBHEANN , TAWNALARY , DONEGAL TOWN

CONSTRUCTION OF A NEW TWO STOREY EXTENSION TO THE SIDE OF EXISTING HOUSE AND ALL ASSOCIATED SITE DEVELOPMENT WORKS

Observations close 7 Dec 2026 8 days left
5 weeks from receipt (received 2 Nov 2026) · s.34 Planning and Development Act 2000 · art. 29 Regulations 2001 · fee €20

The application

Reference
2662013 · full record
Authority
Donegal County Council
Type
PERMISSION
Status
INCOMPLETED APPLICATION
Site area
577 m²
Received
2 Nov 2026

How to submit an observation

  1. Read the file on the council register.Drawings, planning statement and site notices are at http://www.eplanning.ie/DonegalCC/AppFileRefDetails/2662013/0.
  2. Write your observation.Quote 2662013 at the top, give your name and the address the authority should reply to, and confine it to planning matters — zoning objective, height, overlooking, traffic, drainage, heritage. What you say here is what you can later appeal on.
  3. Pay the €20 fee.Every submission needs it; without it the observation is invalid and is returned. Donegal County Council takes it online with the submission or at the counter.
  4. Submit before 7 Dec 2026.Online through the register above, or in writing to the Planning Department, Donegal County Council. The test is the date the authority receives it, not the date you post it.
  5. Keep the acknowledgement.The council's receipt is your proof of a valid observation — see below.

Statutory basis. Section 34(1) of the Planning and Development Act 2000 (as amended) requires a planning authority to consider any submission or observation made to it in accordance with the Regulations. Article 29 of the Planning and Development Regulations 2001 (as amended) sets the window: a submission or observation must be received by the authority within five weeks beginning on the date of receipt of the application, and must be accompanied by the prescribed fee of €20. A submission received after the window, or without the fee, is invalid and the authority must return it.

After you submit: keep the acknowledgement. Under the 2024 Act it secures your right to appeal — only the applicant and a person who made a valid observation may bring the council's decision to An Coimisiún Pleanála, within four weeks of the decision. Making a valid observation is also what buys a right of appeal: under s.37(1) of the 2000 Act, only the applicant and a person who made a valid submission or observation to the planning authority may appeal the decision to An Coimisiún Pleanála (within four weeks of the decision). Missing the five-week window closes both doors.

Nearby precedents within 500 m, last 5 years

Decisions

ReferenceDecisionDecidedDistanceDescription
2661606Conditional16 Oct 2026427 m(1) LEAN TO EXTENSION TO THE EAST ELEVATION OF THE MAIN BUILDING, (2) RELOCATED POWER WASHER STORAGE SHED FROM THAT PREVIOUSLY GRANTED UNDER PLANNING REF. NO. 23/50116 AND (3) EXCAVATED AREA TO THE NORTH OF THE MAIN BUILDING, TOGETHER WITH ALL ASSOCIATED SITE DEVELOPMENT WORKS
2661448Conditional17 Sept 2026333 m(1) DEMOLITION OF EXISTING SHED ATTACHED TO DWELLING HOUSE, (2) CONSTRUCTION OF AN EXTENSION TO EXISTING DWELLING, (3) ELEVATIONAL CHANGES INCLUDING PROVISION OF NEW WINDOWS AND ALL ASSOCIATED SITE WORKS
2661343Conditional3 Sept 20260 mCONSTRUCTION OF A TWO STOREY EXTENSION TO THE SIDE OF EXISTING HOUSE AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
2661211Conditional13 Aug 2026300 mCHANGE OF USE FROM A DWELLING HOUSE TO SHORT TERM HOLIDAY LET
2561985Conditional15 Jan 2026329 mCONVERSION OF ATTIC SPACE TO LIVING ACCOMMODATION TO INCLUDE 2 NO. BEDROOMS AND ALL ANCILLARY SITE DEVELOPMENT WORKS
2561589Conditional30 Oct 2025428 m(1) CONSTRUCTION OF A 614M2 TWO-STOREY OFFICE EXTENSION TO THE WESTERN SIDE OF THE EXISTING MANUFACTURING FACILITY, (2) CONSTRUCTION OF A 343M2 TWO STOREY LABORATORY EXTENSION TO THE EAST OF THE EXISTING BUILDING WITH ASSOCIATED SECOND FLOOR PLANT ROOM AND EXTERNAL STEEL ACCESS STAIRCASE AND (3) ALL OTHER ASSOCIATED SITE WORKS REQUIRED TO FACILITATE THE PROPOSED DEVELOPMENT INCLUDING MINOR MODIFICATIONS TO HARD AND SOFT LANDSCAPING ALL ON EXISTING 10.5HA MANUFACTURING SITE
2461933Conditional16 Jan 2025259 m(1) 4SQM STORE / PLANT ROOM, (2) RELOCATION AND MINOR ALTERATIONS TO CAR PARKING FACILITIES TO THE SOUTH OF THE DEVELOPMENT, (3) MINOR ALTERATIONS TO THE EXTERNAL ELEVATIONS OF THE PREVIOUSLY APPROVED EARLY LEARNING BUILDINGS AND (4) ALL ASSOCIATED SITE DEVELOPMENT WORKS AND PERMISSION FOR CHANGE TO CONDITION NO. 4 OF THE APPROVED PLANNING PERMISSION REF. NO. 23/50487 TO PERMIT WORKING HOURS FROM 08:00AM TO 18:00PM AS OPPOSED TO THAT GRANTED OF 09:00AM TO 17:30PM
2460264Refused18 Apr 2024242 m(1) CONSTRUCTION OF A COMMERCIAL BUILDING CONSISTING OF OFFICES AND REPAIR/ MAINTENANCE WORKSHOP FOR VEHICLES IN CONNECTION WITH LOGISTICS/ HAULAGE BUSINESS, (2) REDUCTION OF LAND LEVEL BY REDUCING SOILS LEVEL AND CONSTRUCTION OF A RETAINING WALL, (3) CONNECTION TO WATERMAINS, PUBLIC SEWER AND STORMWATER SYSTEMS ADJACENT TO THE PROPOSED SITE, (4) UPGRADING OF EXISTING ENTRANCE ONTO THE EXISTING INDUSTRIAL ESTATE ROAD ADJACENT TO THE SITE TO ALLOW FOR HAULAGE VEHICLES, INCLUSIVE OF 2.4M HIGH ELECTRIC GATES, (5) LAYING OF HARDCORE STONE AREA FOR TRUCK PARKING AND ALL ASSOCIATED SITE WORKS

Appeals

ACP caseTypeOutcomeDecidedDistance
319705Refused18 Feb 2025240 m

If neighbours here have appealed before and lost, the inspector's report on that case is the single most useful thing to read.

What has happened on this file

  • 2 Nov 2026 New application · observations close 7 Dec 2026
  • 2 Nov 2026 Decision

Generated from the Planning Register store; nothing was fetched live for this page. Source: national planning dataset, fetched 11 Nov 2026, 23:00. Not legal advice — confirm the deadline with Donegal County Council before relying on it.