BALLINTRA , ARANMORE ISLAND , CO. DONEGAL
ERECTION OF DWELLING HOUSE WITH SEPTIC TANK SYSTEM AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
The application
- Reference
- 2662038 · full record
- Authority
- Donegal County Council
- Type
- PERMISSION
- Status
- NEW APPLICATION
- Units
- 1
- Floor area
- 202 m²
- Site area
- 1,770 m²
- Received
- 4 Nov 2026
- Decision due
- 7 Jan 2027
How to submit an observation
- Read the file on the council register.Drawings, planning statement and site notices are at http://www.eplanning.ie/DonegalCC/AppFileRefDetails/2662038/0.
- Write your observation.Quote
2662038at the top, give your name and the address the authority should reply to, and confine it to planning matters — zoning objective, height, overlooking, traffic, drainage, heritage. What you say here is what you can later appeal on. - Pay the €20 fee.Every submission needs it; without it the observation is invalid and is returned. Donegal County Council takes it online with the submission or at the counter.
- Submit before 9 Dec 2026.Online through the register above, or in writing to the Planning Department, Donegal County Council. The test is the date the authority receives it, not the date you post it.
- Keep the acknowledgement.The council's receipt is your proof of a valid observation — see below.
Statutory basis. Section 34(1) of the Planning and Development Act 2000 (as amended) requires a planning authority to consider any submission or observation made to it in accordance with the Regulations. Article 29 of the Planning and Development Regulations 2001 (as amended) sets the window: a submission or observation must be received by the authority within five weeks beginning on the date of receipt of the application, and must be accompanied by the prescribed fee of €20. A submission received after the window, or without the fee, is invalid and the authority must return it.
Nearby precedents within 500 m, last 5 years
Decisions
| Reference | Decision | Decided | Units | Distance | Description |
|---|---|---|---|---|---|
| 2661659 | Conditional | 30 Oct 2026 | 1 | 190 m | REVISED HOUSE TYPE IN LIEU OF THAT PREVIOUSLY PERMITTED UNDER PLANNING REF. NO. 23/51212, EXTERNAL STORAGE STRUCTURE, SEPTIC TANK TREATMENT FACILITY AND ALL ASSOCIATED SITE WORKS |
| 2661660 | Conditional | 30 Oct 2026 | 1 | 176 m | REVISED HOUSE TYPE IN LIEU OF THAT PREVIOUSLY PERMITTED UNDER PLANNING REF. NO. 23/51211, EXTERNAL STORAGE STRUCTURE, SEPTIC TANK TREATMENT FACILITY AND ALL ASSOCIATED SITE WORKS |
| 2660174 | Refused | 2 Apr 2026 | 1 | 175 m | REVISED HOUSE TYPE IN LIEU OF THAT PREVIOUSLY PERMITTED UNDER PLANNING REF. NO. 23/51211, TOGETHER WITH ALL ASSOCIATED SITE WORKS AND SERVICES |
| 2550018 | Conditional | 22 May 2025 | 1 | 84 m | (1) MOBILE HOME UNTIL BUILDING WORKS ARE COMPLETED AND (2) WORKS TO EXISTING SHED INCLUDING NEW ROOF, RAISING HEIGHT OF ROOF AND INSULATION OF WINDOWS AND PERMISSION FOR (1) RETENTION AND COMPLETION OF EXTENSION TO DWELLING HOUSE AND INCREASE IN HEIGHT OF DWELLING HOUSE AND (2) UPGRADE OF ON-SITE SEWERAGE TREATMENT SYSTEM WITH ALL ASSOCIATED SITE WORKS |
| 2550010 | Conditional | 3 Apr 2025 | 499 m | INSTALLATION OF NEW CORNER WINDOW TO THE SOUTH-EAST GABLE OF PROPERTY AND REINSTATEMENT OF GABLE WALL | |
| 2461719 | Conditional | 13 Dec 2024 | 400 m | REPLACEMENT OF AN EXISTING 30M-HIGH RADIO MAST AND CABLE STAY SUPPORTS WITH A PROPOSED 30M-HIGH LATTICE TOWER TO SUPPORT 4NO. RADIO-LINK DISHES, TOGETHER WITH EQUIPMENT CABINET AND ALL ASSOCIATED ANCILLARY DEVELOPMENT WORKS INCLUDING UPGRADING OF ACCESS TRACK AT EXISTING RADIO MAST SITE. THE DEVELOPMENT IS REQUIRED TO CARRY THE BROADBAND DATA FROM THE NEW HIGH SPEED FIBRE BROADBAND NETWORK ON THE ISLAND, TO THE MAINLAND BY RADIO LINK, TO CONNECT TO THE NBI NATIONAL FIBRE NETWORK, AS PART OF THE GOVERNMENT’S NATIONAL BROADBAND PLAN TO PROVIDE HIGH SPEED BROADBAND TO ALL PARTS OF THE COUNTRY THAT ARE NOT AVAILABLE COMMERCIALLY, INCLUDING THE ISLANDS, AT THE SAME DATA SPEED | |
| 2351680 | Conditional | 29 Feb 2024 | 1 | 345 m | ERECTION OF A DWELLING HOUSE WITH SEPTIC TANK SYSTEM AND ALL OTHER SITE DEVELOPMENT WORKS |
| 2352026 | Conditional | 22 Feb 2024 | 499 m | INSTALLATION OF A NEW WASTEWATER TREATMENT SYSTEM, A SAND POLISHING FILTER AND ALL ASSOCIATED SITE DEVELOPMENT WORKS |
What has happened on this file
- 4 Nov 2026 New application · observations close 9 Dec 2026
- 4 Nov 2026 Decision
Generated from the Planning Register store; nothing was fetched live for this page. Source: national planning dataset, fetched 11 Nov 2026, 23:00. Not legal advice — confirm the deadline with Donegal County Council before relying on it.