NO. 59 CILL GREINE , LISMONAGHAN , LETTERKENNY

(1) DEMOLITION OF EXISTING MICA DEFECTIVE BLOCK TWO STOREY DWELLING GRANTED UNDER PLANNING REF. NO. 05/80059 AND (2) CONSTRUCTION OF A REPLACEMENT TWO STOREY DWELLING WITH STORM AND FOUL DRAINAGE TO BE CONNECTED TO EXISTING STORM AND FOUL SYSTEM PREVIOUSLY GRANTED UNDER PLANNING REF. NO. 05/80059 AND ALL ASSOCIATED WORKS AND SITE WORKS

Observations close 17 Dec 2026 23 days left
5 weeks from receipt (received 12 Nov 2026) · s.34 Planning and Development Act 2000 · art. 29 Regulations 2001 · fee €20 · council decision due 15 Jan 2027

The application

Reference
2662093 · full record
Authority
Donegal County Council
Type
PERMISSION
Status
PRE_VALIDATION
Units
1
Floor area
187 m²
Site area
304 m²
Received
12 Nov 2026
Decision due
15 Jan 2027

How to submit an observation

  1. Read the file on the council register.Drawings, planning statement and site notices are at http://www.eplanning.ie/DonegalCC/AppFileRefDetails/2662093/0.
  2. Write your observation.Quote 2662093 at the top, give your name and the address the authority should reply to, and confine it to planning matters — zoning objective, height, overlooking, traffic, drainage, heritage. What you say here is what you can later appeal on.
  3. Pay the €20 fee.Every submission needs it; without it the observation is invalid and is returned. Donegal County Council takes it online with the submission or at the counter.
  4. Submit before 17 Dec 2026.Online through the register above, or in writing to the Planning Department, Donegal County Council. The test is the date the authority receives it, not the date you post it.
  5. Keep the acknowledgement.The council's receipt is your proof of a valid observation — see below.

Statutory basis. Section 34(1) of the Planning and Development Act 2000 (as amended) requires a planning authority to consider any submission or observation made to it in accordance with the Regulations. Article 29 of the Planning and Development Regulations 2001 (as amended) sets the window: a submission or observation must be received by the authority within five weeks beginning on the date of receipt of the application, and must be accompanied by the prescribed fee of €20. A submission received after the window, or without the fee, is invalid and the authority must return it.

After you submit: keep the acknowledgement. Under the 2024 Act it secures your right to appeal — only the applicant and a person who made a valid observation may bring the council's decision to An Coimisiún Pleanála, within four weeks of the decision. Making a valid observation is also what buys a right of appeal: under s.37(1) of the 2000 Act, only the applicant and a person who made a valid submission or observation to the planning authority may appeal the decision to An Coimisiún Pleanála (within four weeks of the decision). Missing the five-week window closes both doors.

Nearby precedents within 500 m, last 5 years

Decisions

ReferenceDecisionDecidedUnitsDistanceDescription
2661728Conditional5 Nov 2026241 m(1) SUNROOM EXTENSION AND MINOR ALTERATIONS TO THE FRONT OF EXISTING DWELLING HOUSE AND (2) FLAT ROOF STRUCTURE TO DETACHED GARAGE IN LIEU OF A PITCHED ROOF DESIGN AS ORIGINALLY PERMITTED UNDER PLANNING REF. NO. T.81/78 AND ASSOCIATED SITE DEVELOPMENT WORKS
2661121Conditional27 Aug 2026463 mRETENTION AND COMPLETION OF EXISTING APARTMENT BLOCK UNDER CONSTRUCTION WITH ALL ASSOCIATED SITE DEVELOPMENT WORKS
2560998Conditional6 Aug 2026479 mCONSTRUCTION OF 3 STOREY APARTMENT BLOCK ‘A’ CONTAINING 6 NO. APARTMENTS, AND A 4 STOREY APARTMENT BLOCK ‘B’ CONTAINING 14 NO. APARTMENTS INCLUDING SHARED ROOF TERRACES (20 NO. APARTMENTS IN TOTAL) WITH ALL ANCILLARY SITE WORKS TO INCLUDE CONNECTION TO EXISTING PUBLIC SERVICES, PROPOSED NEW ENTRANCE AND SPEED TABLE, ASSOCIATED CAR PARKING, AMENITY SPACE, BICYCLE PARKING, BIN COMPOUNDS AND STORM WATER DISCHARGE TO EXISTING STREAM
2660908Conditional9 Jul 2026400 mERECTION OF (1) NEW MODULAR BUILDING TO CONSIST OF 2 NO. TEAM CHANGING ROOMS, SHOWER ROOMS AND TOILET FACILITIES AND (2) NEW MODULAR BUILDING TO CONSIST OF 2 NO. OFFICIALS CHANGING ROOMS, SHOWER ROOMS AND TOILET FACILITIES, CONNECTION TO ALL EXISTING MAIN PUBLIC SERVICES AND ALL ASSOCIATED SITE WORKS TO INCREASE FOOTBALL PITCHES AND CLUB FACILITIES
2660725Conditional18 Jun 2026349 mALTERATIONS AND CONSTRUCTION OF EXTENSION TO EXISTING DWELLING AND ALL ASSOCIATED SITEWORKS
2660320Conditional24 Apr 20261187 mDEMOLITION OF EXISTING DWELLING DUE TO DEFECTIVE MICA BLOCKWORK AND CONSTRUCTION OF A REPLACEMENT DWELLING INCLUDING AN AMENDED DESIGN AND EXTENSION TO THE SIDES, FRONT AND REAR OF THE PREVIOUSLY APPROVED DWELLING, CONNECTION TO ALL EXISTING SERVICES AND ALL ANCILLARY SITE DEVELOPMENT WORKS
2562244Conditional12 Feb 2026353 m(1) FLAT ROOF EXTENSION TO THE REAR (WESTERN) AND SIDE (SOUTHERN) ELEVATIONS AND (2) NEW WINDOW ON THE SOUTHERN ELEVATION WITH ALL ASSOCIATED WORKS TO EXISTING DWELLING
2561502Conditional17 Oct 20251208 mDEMOLITION OF EXISTING (DEFECTIVE/MICA) DWELLING HOUSE AND CONSTRUCTION OF A NEW REPLACEMENT DWELLING HOUSE WITH CONNECTION TO EXISTING MAIN PUBLIC SERVICES, MAIN PUBLIC SEWER AND ALL ASSOCIATED SITE WORKS

Appeals

ACP caseTypeOutcomeDecidedDistance
316727Granted30 Aug 202330 m
316857Granted28 Aug 2023457 m
316861Other28 Aug 2023457 m

If neighbours here have appealed before and lost, the inspector's report on that case is the single most useful thing to read.

What has happened on this file

  • 12 Nov 2026 New application · observations close 17 Dec 2026
  • 12 Nov 2026 Decision

Generated from the Planning Register store; nothing was fetched live for this page. Source: national planning dataset, fetched 17 Nov 2026, 23:00. Not legal advice — confirm the deadline with Donegal County Council before relying on it.