PlanningRegister.ie
Observation pack · Donegal County Council

TOWNPARKS & CONEYBURROW , LIFFORD , CO. DONEGAL

CONSTRUCTION OF A DWELLING AND ALL ASSOCIATED SITE WORKS INCLUDING CONNECTION TO EXISTING PUBLIC SEWER

Observations close 4 Jan 2027 41 days left
5 weeks from receipt (received 19 Nov 2026) · s.34 Planning and Development Act 2000 · art. 29 Regulations 2001 · fee €20 · council decision due 22 Jan 2027

The application

Reference
2662151 · full record
Authority
Donegal County Council
Type
PERMISSION
Status
PRE_VALIDATION
Units
1
Floor area
229 m²
Site area
903 m²
Received
19 Nov 2026
Decision due
22 Jan 2027

How to submit an observation

  1. Read the file on the council register.Drawings, planning statement and site notices are at http://www.eplanning.ie/DonegalCC/AppFileRefDetails/2662151/0.
  2. Write your observation.Quote 2662151 at the top, give your name and the address the authority should reply to, and confine it to planning matters — zoning objective, height, overlooking, traffic, drainage, heritage. What you say here is what you can later appeal on.
  3. Pay the €20 fee.Every submission needs it; without it the observation is invalid and is returned. Donegal County Council takes it online with the submission or at the counter.
  4. Submit before 4 Jan 2027.Online through the register above, or in writing to the Planning Department, Donegal County Council. The test is the date the authority receives it, not the date you post it.
  5. Keep the acknowledgement.The council's receipt is your proof of a valid observation — see below.

Statutory basis. Section 34(1) of the Planning and Development Act 2000 (as amended) requires a planning authority to consider any submission or observation made to it in accordance with the Regulations. Article 29 of the Planning and Development Regulations 2001 (as amended) sets the window: a submission or observation must be received by the authority within five weeks beginning on the date of receipt of the application, and must be accompanied by the prescribed fee of €20. A submission received after the window, or without the fee, is invalid and the authority must return it.

After you submit: keep the acknowledgement. Under the 2024 Act it secures your right to appeal — only the applicant and a person who made a valid observation may bring the council's decision to An Coimisiún Pleanála, within four weeks of the decision. Making a valid observation is also what buys a right of appeal: under s.37(1) of the 2000 Act, only the applicant and a person who made a valid submission or observation to the planning authority may appeal the decision to An Coimisiún Pleanála (within four weeks of the decision). Missing the five-week window closes both doors.

Designations on or near the site within 100 m

  • NIAH-recorded building × 1
    Russborough House

Nearby precedents within 500 m, last 5 years

Decisions

ReferenceDecisionDecidedDistanceDescription
2661143Conditional6 Aug 202682 mWORKS TO EXISTING RESIDENTIAL DWELLING HOUSE TO PROVIDE 2 NO. TWO BEDROOM APARTMENTS, INCLUDING REMOVAL OF EXISTING SINGLE STOREY EXTENSION TO THE REAR AND PROVISION OF A NEW TWO STOREY EXTENSION TO THE REAR AND ALL INTERNAL RENOVATION AND ANCILLARY SITE DEVELOPMENT WORKS
2660030Conditional6 Mar 20260 m(1) ERECTION OF AN ACOUSTIC FENCE ON TOP OF EXISTING 2-METER-HIGH CONCRETE BLOCK WALL, MAXIMUM HEIGHT OF 3.6 METERS ON WESTERN BOUNDARY OF EXISTING PETROL FILLING STATION IN ACCORDANCE WITH SERIES NG 300 – FENCING AND ENVIRONMENTAL NOISE BARRIERS (TII PUBLICATIONS) AND (2) EXTENSION OF OPENING TIME TO 24 HOURS FOR THE DELIVERY OF FUEL
2561185Conditional21 Aug 202533 m(1) CONSTRUCTION OF AN EXTENSION TO NORTH EAST SIDE OF THE BUILDING TO PROVIDE A CLASSROOM WITH TOILET AND STORAGE FACILITIES ALONG WITH AN EXTERNAL STORAGE AREA, (2) STORM AND FOUL DRAINAGE TO CONNECT TO EXISTING SYSTEM PRESENT ON SITE AND (3) ALL ASSOCIATED SITE WORKS
2560828Refused10 Jul 20250 m(1) ERECTION OF AN ACOUSTIC FENCE ON TOP OF EXISTING 2-METER-HIGH CONCRETE BLOCK WALL, MAXIMUM HEIGHT OF 3.6 METERS ON WESTERN BOUNDARY OF EXISTING PETROL FILLING STATION IN ACCORDANCE WITH SERIES NG 300 - FENCING AND ENVIRONMENTAL NOISE BARRIERS (TII PUBLICATIONS) AND (2) EXTENSION OF OPENING TIME TO 24 HOURS FOR THE DELIVERY OF FUEL
2550061Conditional20 Jun 2025222 mCONSTRUCTION OF A TWO-STOREY EXTENSION TO THE REAR OF EXISTING DWELLING INCLUDING CONNECTION TO EXISTING SERVICES AND ALL ASSOCIATED SITE WORKS
2461936Conditional16 Jan 202516 mCONSTRUCTION OF A SIDE EXTENSION TO AN EXISTING DWELLING
2460888Conditional1 Aug 202433 mCONSTRUCTION OF AN ALL WEATHER FOOTBALL PITCH COMPLETE WITH FENCING, LIGHT STANDARDS AND ALL ASSOCIATED SITEWORKS
2351787Conditional18 Jan 2024163 mCONSTRUCTION OF AN EXTENSION TO THE REAR OF EXISTING DWELLING HOUSE AND ASSOCIATED SITE DEVELOPMENT WORKS

Appeals

ACP caseTypeOutcomeDecidedDistance
501071Granted with conditions30 Jul 20260 m
324272pending7 May 2026426 m
318929Granted with conditions3 Jan 20250 m

If neighbours here have appealed before and lost, the inspector's report on that case is the single most useful thing to read.

What has happened on this file

  • 19 Nov 2026 New application · observations close 4 Jan 2027
  • 19 Nov 2026 Decision

Generated from the Planning Register store; nothing was fetched live for this page. Source: national planning dataset, fetched 24 Nov 2026, 23:00. Not legal advice — confirm the deadline with Donegal County Council before relying on it.