Woodfield , Westown, Naul, Co Dublin, K32 YY13
Front and rear extension including internal alterations to existing dwelling , alterations to all existing elevations and all associated site…
The application
- Reference
- F26A/0994E · full record
- Authority
- Fingal County Council
- Type
- Permission
- Status
- Referral
- Site area
- 5,560 m²
- Received
- 12 Nov 2026
- Decision due
- 15 Jan 2027
The council’s feed cuts this description short. The full text and the drawings are on the council register linked in step 1.
How to submit an observation
- Read the file on the council register.Drawings, planning statement and site notices are at https://planning.agileapplications.ie/fingal/application-details/?ref=F26A/0994E.
- Write your observation.Quote
F26A/0994Eat the top, give your name and the address the authority should reply to, and confine it to planning matters — zoning objective, height, overlooking, traffic, drainage, heritage. What you say here is what you can later appeal on. - Pay the €20 fee.Every submission needs it; without it the observation is invalid and is returned. Fingal County Council takes it online with the submission or at the counter.
- Submit before 17 Dec 2026.Online through the register above, or in writing to the Planning Department, Fingal County Council. The test is the date the authority receives it, not the date you post it.
- Keep the acknowledgement.The council's receipt is your proof of a valid observation — see below.
Statutory basis. Section 34(1) of the Planning and Development Act 2000 (as amended) requires a planning authority to consider any submission or observation made to it in accordance with the Regulations. Article 29 of the Planning and Development Regulations 2001 (as amended) sets the window: a submission or observation must be received by the authority within five weeks beginning on the date of receipt of the application, and must be accompanied by the prescribed fee of €20. A submission received after the window, or without the fee, is invalid and the authority must return it.
What the site is zoned
| Code | Objective | Plan | In force |
|---|---|---|---|
| RV - Rural Village: Protect and promote established villages within the rural landscape where people can settle and have access to community services. The villages are areas within the rural landscape where housing needs can be satisfied with minimal harm to the countryside and surrounding environment. The villages will serve their rural catchment, provide local services and smaller scale rural enterprises. Levels of growth will be managed through local area plans to ensure that a critical mass for local services is encouraged without providing for growth beyond local need and unsustainable commuting patterns. | Fingal County Council development plan | ||
| RU - Rural: Protect and promote the value of the rural area of the County. This rural value is based on: *Agricultural and rural economic resources *Visual remoteness from significant and distinctive urban influences *A high level of natural features Agriculture and rural related resources will be employed for the benefit of the local and wider population. Building upon the rural value will require a balanced approach involving the protection and promotion of rural biodiversity, promotion of the integrity of the landscape, and enhancement of the built and cultural heritage. | Fingal County Council development plan | ||
| OS - Open Space: Provide recreational and amenity resources for urban and rural populations subject to strict development controls. Only community facilities and other recreational uses will be considered and encouraged by the Planning Authority. | Fingal County Council development plan | ||
| G4 Open space | OS - Open Space: Preserve and provide for open space and recreational amenities | the fingal development plan 2023 2029 | 5 Apr 2023 → 5 Apr 2029 |
| M2 Major town centre | RV - Rural Village: Protect and promote the character of the Rural Village and promote a vibrant community in accordance with an approved land use plan, and the availability of physical and community infrastructure | the fingal development plan 2023 2029 | 5 Apr 2023 → 5 Apr 2029 |
| P1 Rural | RU - Rural: Protect and promote in a balanced way, the development of agriculture and rural related enterprise, biodiversity, the rural landscape, and the built and cultural heritage | the fingal development plan 2023 2029 | 5 Apr 2023 → 5 Apr 2029 |
An application that accords with the zoning objective is hard to resist on principle; one that does not may be a material contravention, which the council can only grant by the s.34(6) procedure with its own notice and window.
Source: Fingal County Council development plan zoning · fetched 11 Sept 2026, 15:18
| Source | Licence | Fetched | Link |
|---|---|---|---|
| Fingal County Council development plan zoning | — | 11 Sept 2026, 15:18 | open |
Designations on or near the site within 100 m
- Architectural Conservation Area × 1Naul ACA
- Radon risk area × 4About 1 in 10 homes in this area is likely to have high radon levels · About 1 in 20 homes in this area is likely to have high radon levels · About 1 in 20 homes in this area is likely to have high radon levels
Nearby precedents within 500 m, last 5 years
Decisions
| Reference | Decision | Decided | Distance | Description |
|---|---|---|---|---|
| F26A/0961E | Invalid application | 4 Nov 2026 | 241 m | Permission for the construction of an acoustic enclosure, comprising [acoustic roof and/or acoustic screening], around the existing external plant equipment serving Castle Manor Care Home, including associated supporting structure, acoustic materials and all ancillary works at lands with Castle Manor, to the west of 1–3 Weston Wood and north of No. 3 Weston Close, Naul, Fingal, Co. Dublin. |
| 2660863 | Conditional | 3 Sept 2026 | 471 m | the development will consist of a lean-to roof extension off existing agricultural shed to cover existing bunded tanks, chemical storage with handling facilities and all associated site works |
| F25A/0845E | Grant permission | 6 Jul 2026 | 3 m | The proposed development will consist of (i) the construction of 32 no. houses comprising 2 no. detached 4 bed single-storey houses, 6 no. semi-detached 2 bed single-storey houses, 4 no. detached 3 bed two-storey houses, 12 no. semi-detached 3 bed two-storey houses and 8 no. detached 4 bed two-storey houses, (ii) provision of a temporary wastewater treatment plant to be connected to existing foul sewer pumping station, (iii) provision of public open spaces and landscaping, (iv) site services and (v) all associated site works. A Natura Impact Statement (NIS) has been prepared for the proposed development. Additional Information Received 12/05/2026 |
| F25A/0739E | Grant permission | 16 Jan 2026 | 33 m | The development will consist of widening of the existing driveway entrance, a new shed, and associated site works. Additional Information received 12/12/2025 |
| F25A/0578E | Grant permission | 15 Jan 2026 | 427 m | NIS We, Uisce Éireann, intend to apply for permission for development at this site address: Naul Wastewater Treatment Plant, Naul, Fingal, Co. Dublin. The development will consist of upgrades to the existing Naul Wastewater Treatment Plant: - Installation of new Preliminary Treatment, Stormwater Storage Tank, Aeration Tank, Two Secondary Settlement Tanks, Sludge Pumping Station, Sludge Thickener, Flood Protection Berm, Security Fence, PV panels, Attenuation Tank and Oil Interceptor. -Realignment of inlet sewer; -New access road and entrance gate; -Landscaping; - Mechanical, electrical and associated site works; - Demolition of existing Screening, Settlement Tank, Sludge Pumping Station, Sludge Holding Tank; -A Natura Impact Statement has been prepared in respect of this planning application. Additional Information Received 12/11/2025 |
| F25A/0711E | Grant permission | 29 Sept 2025 | 268 m | The development will consist of the extension of operational hours for childcare facility from that granted under F10A/0530, F18A/0570 & F24A/0615E (from 9:00 to 12:30 & 13:30 to 18:00) to 08:00 - 18:00 inclusive. |
| F25A/0815E | Invalid application | 11 Sept 2025 | 3 m | The proposed development will consist of (i) the construction of 32 no. houses comprising 2 no. detached 4 bed single-storey houses, 6 no. semi-detached 2 bed single-storey houses, 4 no. detached 3 bed two-storey houses, 12 no. semi-detached 3 bed two-storey houses and 8 no. detached 4 bed two-storey houses, (ii) provision of a temporary wastewater treatment plant to be connected to existing foul sewer pumping station, (iii) provision of public open spaces and landscaping, (iv) site services and (v) all associated site works. A Natura Impact Statement (NIS) has been prepared for the proposed development. |
| F25A/0551E | Invalid application | 25 Jun 2025 | 427 m | We, Uisce Éireann, intend to apply for permission for development at this site address: Naul Wastewater Treatment Plant, Naul, Fingal, Co. Dublin. The development will consist of upgrades to the existing Naul Wastewater Treatment Plant: Installation of new Preliminary Treatment, Stormwater Storage Tank, Aeration Tank, Two Secondary Settlement Tanks, Sludge Pumping Station, Sludge Thickener, Flood Protection Berm, Security Fence, PV panels, Attenuation Tank and Oil Interceptor. Realignment of inlet sewer, New access road and entrance gate, Landscaping, Mechanical, electrical and associated site works. Demolition of existing Screening, Settlement Tank, Sludge Pumping Station and Sludge Holding Tank. A Natura Impact Statement (NIS) has been prepared in respect of this planning application. |
Appeals
| ACP case | Type | Outcome | Decided | Distance |
|---|---|---|---|---|
| 500783 | Planning Appeal | Invalid | 12 Feb 2026 | 427 m |
| 319068 | Planning Appeal | Granted with conditions | 8 Aug 2024 | 361 m |
| 314881 | Granted with conditions | 14 Feb 2024 | 488 m |
If neighbours here have appealed before and lost, the inspector's report on that case is the single most useful thing to read.
What has happened on this file
- 12 Nov 2026 New application · observations close 17 Dec 2026
Generated from the Planning Register store; nothing was fetched live for this page. Source: national planning dataset, fetched 24 Nov 2026, 23:00. Not legal advice — confirm the deadline with Fingal County Council before relying on it.