UNIT 4 & 8, DONABATE SHOPPING CENTRE, MAIN STREET, DONABATE, CO.DUBLIN, K36 H902
The development will consist of the amalgamation of existing ground floor Cafe unit and commercial retail unit, and Change of Use to a singular consolidated Cafe unit, and replacement signage…
The application
- Reference
- F26A/1021E · full record
- Authority
- Fingal County Council
- Status
- Registration
- Applicant
- DONABATE SUPERMARKETS LTD
- Site area
- 208 m²
- Received
- 18 Nov 2026
The council’s feed cuts this description short. The full text and the drawings are on the council register linked in step 1.
How to submit an observation
- Read the file on the council register.Drawings, planning statement and site notices are at https://planning.agileapplications.ie/fingal/application-details/?ref=F26A/1021E.
- Write your observation.Quote
F26A/1021Eat the top, give your name and the address the authority should reply to, and confine it to planning matters — zoning objective, height, overlooking, traffic, drainage, heritage. What you say here is what you can later appeal on. - Pay the €20 fee.Every submission needs it; without it the observation is invalid and is returned. Fingal County Council takes it online with the submission or at the counter.
- Submit before 23 Dec 2026.Online through the register above, or in writing to the Planning Department, Fingal County Council. The test is the date the authority receives it, not the date you post it.
- Keep the acknowledgement.The council's receipt is your proof of a valid observation — see below.
Statutory basis. Section 34(1) of the Planning and Development Act 2000 (as amended) requires a planning authority to consider any submission or observation made to it in accordance with the Regulations. Article 29 of the Planning and Development Regulations 2001 (as amended) sets the window: a submission or observation must be received by the authority within five weeks beginning on the date of receipt of the application, and must be accompanied by the prescribed fee of €20. A submission received after the window, or without the fee, is invalid and the authority must return it.
What the site is zoned
| Code | Objective | Plan | In force |
|---|---|---|---|
| RD - Road: N/A | Fingal County Council development plan | ||
| TC - Town and District Centre: Maintain and build on the accessibility, vitality and viability of the existing Urban Centres in the County. Develop and consolidate these Centres with an appropriate mix of commercial, recreational, cultural, leisure and residential uses, and to enhance and develop the urban fabric of these Centres in accordance with the principles of urban design, conservation and sustainable development. Retail provision will be in accordance with the County Retail Strategy, enhance and develop the existing urban fabric, emphasise urban conservation, and ensure priority for public transport, pedestrians and cyclists while minimising the impact of private car based traffic. In order to deliver this vision and to provide a framework for sustainable development, Urban Centre Strategies will be prepared for centres in accordance with the Urban Fingal Chapter objectives. | Fingal County Council development plan | ||
| M2 Major town centre | TC - Town and District Centre: Protect and enhance the special physical and social character of town and district centres and provide and/ or improve urban facilities | the fingal development plan 2023 2029 | 5 Apr 2023 → 5 Apr 2029 |
An application that accords with the zoning objective is hard to resist on principle; one that does not may be a material contravention, which the council can only grant by the s.34(6) procedure with its own notice and window.
Source: Fingal County Council development plan zoning · fetched 11 Sept 2026, 15:18
| Source | Licence | Fetched | Link |
|---|---|---|---|
| Fingal County Council development plan zoning | — | 11 Sept 2026, 15:18 | open |
Designations on or near the site within 100 m
- NIAH-recorded building × 4Saint Patrick's Catholic Church · An Dún · water pump
- Radon risk area × 2About 1 in 10 homes in this area is likely to have high radon levels · About 1 in 20 homes in this area is likely to have high radon levels
- Record of Protected Structures × 2St. Patrick's Church (RC) · An Dun (Formerly Warington's House)
Nearby precedents within 500 m, last 5 years
Decisions
| Reference | Decision | Decided | Distance | Description |
|---|---|---|---|---|
| F26A/1009E | Invalid application | 18 Nov 2026 | 0 m | The development will consist of the amalgamation of existing ground floor Cafe unit and commercial retail unit, and change of use to a singular consolidated Cafe unit, and replacement signage to the front elevation, and all associated site and ancillary works. |
| F25A/0950E | Grant permission | 4 Aug 2026 | 41 m | We, Keelco Limited, intend to apply for permission for development on lands at St. Mary's, Main Street, Ballalease West, Donabate, Co. Dublin and including the existing car park at Ballisk Court, Ballalease West, Donabate, Co. Dublin. The proposed development consists of demolition of the existing detached single-storey St. Mary's building and the construction of a mixed-use development, in 2 no. blocks, comprising residential, retail, office, and community use. The development will provide for: Block A will be a 3-storey (1-storey rising to 3-storeys) commercial block comprising of: - 1 no. retail unit and 1 no. retail/office unit at ground floor level; 2 no. Offices and associated bathroom, kitchen, and staff areas at 1st floor level; and 1 no. Office and associated bathroom, kitchen, and staff areas at 2nd floor level; with a roof terrace also located at 1st floor level. Block B will be a 3-storey (1-storey rising to 3-storeys) mixed-use block comprising of: - 1 no. café & coffee shop, 2 no. retail units, and 1 no. community centre unit, along with bin store, and bike store at ground floor level; - 1 no. 2-bed/3-person apartment unit and associated balcony; 2 no. office units with associated private outdoor area; and 1 no. enterprise centre on the 1st floor and 2nd floor levels with a roof terrace at 1st floor level; and - 1 no. 1-bed apartment, 1 no. 2-bed/3-person apartment, and 1 no. 2-bed/4-person apartment all with balconies at 2nd floor level. The proposal includes the use of 6 existing designated parking spaces within the existing Ballisk Court car park; the provision of 47 cycle parking spaces; landscaping; boundary treatment and all associated site and infrastructural works necessary to facilitate the proposed development. Pedestrian and vehicle access to the development will be via Main Street and via a new step and ramp access to Ballisk Court. Emergency vehicular access will be via Main Street. Additional Information Received 09/07/2026 |
| F26A/0267 | Grant permission | 15 Jul 2026 | 85 m | The development consists of the following: Alteration of Condition 2 of Planning Grant, F18A/0480 (F18A/0480 previously granted Permission for continuation of use as Montessori School of part of Donabate Parish Hall - a protected structure - and retention of existing timber screen fencing to children's play area to the rear of the same building together with associated works). The proposed alteration of Condition 2 propose changing the current operating time of 09.15 hours - 12.15 hours & 12.45 hours - 15.45 hours to new proposed operating time of 9.15 hours - 15.45 hours. All ancillary works. Additional information received 18/06/26 |
| F26A/0368E | Grant permission | 1 Jul 2026 | 167 m | The development will consist of the construction of a dormer extension to the rear of the existing dwelling and the relocation of an existing rear roof skylight to accommodate the proposed development, together with all associated site works. |
| F26A/0347E | Grant permission for retention | 22 Jun 2026 | 196 m | Retention Application for alterations to previously granted Planning Permission to House Type B only, under Reg. Ref. F23A/0742 - Being 1) Removal of two windows on the western gable. 2) Addition of two roof lights. 3) Relocation of the kitchen window from the east to south elevation. 4) Change dining room window to patio doors. 5) Addition of a patio door to Bedroom 4. 6) Additional window to the porch. 7) Adjustment to dormer and window widths. |
| F26A/0352E | Invalid application | 6 May 2026 | 167 m | The development will consist of the construction of a dormer extension to the rear of the existing dwelling and relocation of an existing rear roof skylight to accommodate the proposed development, together with all associated site works. |
| F26A/0177E | Grant permission | 5 May 2026 | 283 m | Planning Permission for in fill of car port to create bedroom and bathroom to ground floor. |
| F26A/0138E | Grant permission | 21 Apr 2026 | 145 m | 1/ Construction of new single storey living room extension to side. 2/ Construction of new single storey porch extension to front. 3/ Removal of single storey pitched roof structure, and chimney to existing dwelling. 4/ Construction of new storey and a half roof structure to accommodate new bedroom and bathroom provision, to include 3 no. dormer windows to front, 2 no. Velux rooflights to front, 2 no. Velux dormer rooflights to rear, 1 no. flat rooflight to rear, and associated site works. |
Appeals
| ACP case | Type | Outcome | Decided | Distance |
|---|---|---|---|---|
| 324629 | Referral | pending | 8 Sept 2026 | 220 m |
| 501998 | Planning Appeal | pending | 31 Aug 2026 | 41 m |
| 322720 | Planning Appeal | Granted with conditions | 25 Sept 2025 | 403 m |
| 320164 | Railway Order Application | Other | 19 Aug 2025 | 67 m |
| 319994 | Building Control - Fire Safety Certificate | Granted with conditions | 29 Jul 2025 | 228 m |
| 320885 | Appeal - LRD | Granted with conditions | 13 Jan 2025 | 494 m |
| 320030 | Planning Appeal | Granted with conditions | 26 Nov 2024 | 438 m |
| 320334 | Final Map Appeal | Other | 15 Oct 2024 | 251 m |
If neighbours here have appealed before and lost, the inspector's report on that case is the single most useful thing to read.
What has happened on this file
- 18 Nov 2026 New application · observations close 23 Dec 2026
Generated from the Planning Register store; nothing was fetched live for this page. Source: national planning dataset, fetched 26 Nov 2026, 00:08. Not legal advice — confirm the deadline with Fingal County Council before relying on it.