The rear of No. 7 Roscam Park , Roscam , Galway
Permission for development which consists of: the construction of a dwellinghouse and associated services
The application
- Reference
- 2660332 · full record
- Authority
- Galway City Council
- Type
- PERMISSION
- Status
- NEW APPLICATION
- Applicant
- not published by the national dataset — see the council register
- Units
- 1
- Floor area
- 182 m²
- Site area
- 1,150 m²
- Received
- 10 Sept 2026
- We first saw it
- 18 Sept 2026, 15:44
- Decision due
- 4 Nov 2026
- Decision
- N/a
The national dataset truncates descriptions (80 characters for DLR, 70 for Fingal) and omits the applicant. The full description and the drawings are on the council register linked in step 1.
How to submit an observation
- Read the file on the council register.Drawings, planning statement and site notices are at http://www.eplanning.ie/GalwayCity/AppFileRefDetails/2660332/0.
- Write your observation.Quote
2660332at the top, give your name and the address the authority should reply to, and confine it to planning matters — zoning objective, height, overlooking, traffic, drainage, heritage. What you say here is what you can later appeal on. - Pay the €20 fee.Every submission needs it; without it the observation is invalid and is returned. Galway City Council takes it online with the submission or at the counter.
- Submit before 15 Oct 2026.Online through the register above, or in writing to the Planning Department, Galway City Council. The test is the date the authority receives it, not the date you post it.
- Keep the acknowledgement.The council's receipt is your proof of a valid observation — see below.
Statutory basis. Section 34(1) of the Planning and Development Act 2000 (as amended) requires a planning authority to consider any submission or observation made to it in accordance with the Regulations. Article 29 of the Planning and Development Regulations 2001 (as amended) sets the window: a submission or observation must be received by the authority within five weeks beginning on the date of receipt of the application, and must be accompanied by the prescribed fee of €20. A submission received after the window, or without the fee, is invalid and the authority must return it.
What the site is zoned
| Code | Objective | Plan | In force |
|---|---|---|---|
| R3 Rural cluster | Residential: To provide residential development and for associated support development, which will ensure the protection of existing residential amenity and will contribute to sustainable residential neighbourhoods | GI-001:DP:galway-city-development-plan-2023-2029 | 4 Jan 2023 → 4 Jan 2029 |
| R3 Rural cluster | Residential: To provide residential development and for associated support development, which will ensure the protection of existing residential amenity and will contribute to sustainable residential neighbourhoods | GI-002:DP:galway-city-development-plan-2023-2029-variations-1-2-3 | 4 Jan 2023 → 4 Jan 2029 |
An application that accords with the zoning objective is hard to resist on principle; one that does not may be a material contravention, which the council can only grant by the s.34(6) procedure with its own notice and window.
Sources: GALWAYCITY GI-001:DP:galway-city-development-plan-2023-2029, GALWAYCITY GI-002:DP:galway-city-development-plan-2023-2029-variations-1-2-3 · fetched 27 Sept 2026, 19:37
| Source | Licence | Fetched | Link |
|---|---|---|---|
| GALWAYCITY GI-001:DP:galway-city-development-plan-2023-2029 | — | 27 Sept 2026, 19:37 | open |
| GALWAYCITY GI-002:DP:galway-city-development-plan-2023-2029-variations-1-2-3 | — | 4 Oct 2026, 23:04 | open |
Designations on or near the site
Nothing designated within 100 m of the site.
Nearby precedents within 500 m, last 5 years
Decisions
| Reference | Decision | Decided | Units | Distance | Description |
|---|---|---|---|---|---|
| 2560339 | Conditional | 25 Jun 2026 | 0 | 461 m | Permission for development which consists of: we, HeatGrid Ireland Limited, intend to apply for a 10-year planning application for development of a district heating energy centre at this site, located at Galway Crystal, Murrough Drive, Dublin Road, and a district heating network pipeline in the townlands of Doughiska, Merlin Park, Murrough, Ballybaan More, Renmore, Ballybaan Beg in Galway City, Co. Galway. The proposed development will consist of the following: 1. The demolition of an existing building at the Galway Crystal premises (GFA of demolition 1,290sqm). 2. The construction of buildings to accommodate a District Heating Energy Centre (GFA 1439.1sqm), with a total generated capacity of up to 45MW, comprising of thermal water tanks, a 22-metre flue, roof mounted dry air coolers, gas boiler units, heat pumps, staff welfare facilities, an electrical backup generator, a gas meter room, and associated drainage, water and utility service infrastructure. 3. The construction of a district heating network pipeline (c. 7,877m in length) from the proposed District Heating Energy Centre building within the following roads - Bothar na dTreabh, Dublin Road (R446, R921 and R338), Wellpark Road, Lurgan Park, Gleann Rua, Monivea Road, Ballyloughane Road, Loughnane Road, Glenina Heights, Tara Grove, Renmore Road, Renmore Avenue, Rowan Avenue, Michael Collins Road, Connolly Avenue, Lios An Uisce, Murrough Drive, Rosshill Road, O’Sullivan Park, Walter Macken Place, Quinn Terrace, Loughnane Terrace and Cardinal Cushing Road and the provision of pipes to connect the district heating network pipeline to sites/premises. 4. The proposed development includes all associated site development and site enabling works and ancillary infrastructure. |
| 2660036 | Conditional | 9 Apr 2026 | 0 | 455 m | Permission for development which consists of: to place a coffee/food shipping container on the ground |
| 2560319 | Conditional | 10 Dec 2025 | 0 | 446 m | RED III Permission for development which consists of: the construction and operation of a development consisting of an energy centre building, heat network pipeline, landscaping works, roof mounted solar PV and all other associated ancillary infrastructure at the Merlin Park Industrial Estate and Doughiska Road, within the townland of Doughiska, Galway, Co. Galway. The Galway City East Energy Centre building will integrate multiple low carbon energy technologies. The development will include the installation of 2no. Air Source Heat Pumps (ASHPs) each with a 1.5MW capacity, 2 no. electric boilers, each with a 1.5MW capacity to handle peak loads and temperatures, and 2 no. gas boilers, each with a 1.5MW capacity for emergency back up support. The proposed energy centre building will have a building height of 6.2m, with solar PV panels mounted on the building rooftop. The adjacent building to the east (Smurfit Westrock), will have solar PV panels mounted on the building rooftop. The building to the north (Value Centre), will also have roof mounted solar panels. The proposed development will also include a heat pipeline network consisting of 2no. pipes, with a maximum diameter of 450mm each, spanning a distance of circa. 2390m in an underground trench, from the proposed energy centre building to Doughiska Road, along the length of Doughiska Road, crossing Monivea Road to the north, terminating outside the Clayton Hotel, and crossing Old Dublin Road to the south, terminating outside the Castlegar GAA Club, linking the proposed Galway City East Energy Centre building to future heat customer buildings in the area. Ancillary development will consist of security fencing, access and parking, drainage infrastructure, and landscaping works at the proposed energy centre building. Site preparation will involve foundation works, and construction of essential access facilities to support overall functionality for the purpose of generating renewable heat energy and transmitting it to future heat customer buildings within the townland of Doughiska, Galway Co. Galway (the Proposed Development). Permission is sought for a ten year construction period. |
| 2560213 | Conditional | 9 Sept 2025 | 1 | 450 m | Permission for development which consists of: (i). Permission for the construction of a Single Storey Extension to the side of the existing dwelling. (ii). Retention of a storage shed in the rear garden area, |
| 2560055 | Conditional | 30 Apr 2025 | 0 | 328 m | Retention Permission for development which consists of; fencing and gates which enclose a creche outdoor play area and access routes thereto. Previous planning reference 22/74, 15/194 |
| 2560001 | Conditional | 25 Feb 2025 | 1 | 355 m | Permission for development which consists of; retention for the widening of the site entrance roadway at Doughiska & Merlin Park TD, Doughiska Road, Galway. |
| 2448 | Conditional | 21 Nov 2024 | 1 | 80 m | Permission for development which consists of; to construct 1 no. 4 bedroom detached dwelling with all associated site works and services on infillsite between unit 25 to 26 with access off Doughiska road R338 previously granted Pl. Ref. 18/115 at Garrai Sheain Roscam Galway |
| 2460268 | Refused | 9 Oct 2024 | 0 | 288 m | Permission for development which consists of; the retention of an existing storage container located in the services yard to the rear of the existing shop unit (area for retention 7.5 sq.m). |
Appeals
| ACP case | Type | Outcome | Decided | Distance |
|---|---|---|---|---|
| 321776 | — | Granted with conditions | 30 Sept 2025 | 436 m |
| 318312 | — | Refused | 21 Jun 2024 | 145 m |
| 310810 | — | Granted with conditions | 20 Dec 2021 | 115 m |
If neighbours here have appealed before and lost, the inspector's report on that case is the single most useful thing to read.
What has happened on this file
- 10 Sept 2026 New application · observations close 15 Oct 2026
- 10 Sept 2026 Decision
Generated from the Planning Register store; nothing was fetched live for this page. Source: national planning dataset, fetched 18 Sept 2026, 15:44. Not legal advice — confirm the deadline with Galway City Council before relying on it.