Garraunbaun , Moyard , Co. Galway
to construct a dwelling house, sewage treatment system, domestic garage and all associated site works
The five-week window has passed. Late observations are returned unread. If the council has decided, the next door is the appeal window — but under s.37 only the applicant and those who made a valid observation may appeal.
The application
- Reference
- 26229 · full record
- Authority
- Galway County Council
- Type
- PERMISSION
- Status
- NEW APPLICATION
- Applicant
- not published by the national dataset — see the council register
- Units
- 1
- Floor area
- 154 m²
- Site area
- 3,603 m²
- Received
- 11 Sept 2026
- We first saw it
- 22 Sept 2026, 16:10
- Decision due
- 5 Nov 2026
- Decision
- N/a
The national dataset truncates descriptions (80 characters for DLR, 70 for Fingal) and omits the applicant. The full description and the drawings are on the council register linked in step 1.
How to submit an observation
- Read the file on the council register.Drawings, planning statement and site notices are at http://www.eplanning.ie/GalwayCC/AppFileRefDetails/26229/0.
- Write your observation.Quote
26229at the top, give your name and the address the authority should reply to, and confine it to planning matters — zoning objective, height, overlooking, traffic, drainage, heritage. What you say here is what you can later appeal on. - Pay the €20 fee.Every submission needs it; without it the observation is invalid and is returned. Galway County Council takes it online with the submission or at the counter.
- Submit before 16 Oct 2026.Online through the register above, or in writing to the Planning Department, Galway County Council. The test is the date the authority receives it, not the date you post it.
- Keep the acknowledgement.The council's receipt is your proof of a valid observation — see below.
Statutory basis. Section 34(1) of the Planning and Development Act 2000 (as amended) requires a planning authority to consider any submission or observation made to it in accordance with the Regulations. Article 29 of the Planning and Development Regulations 2001 (as amended) sets the window: a submission or observation must be received by the authority within five weeks beginning on the date of receipt of the application, and must be accompanied by the prescribed fee of €20. A submission received after the window, or without the fee, is invalid and the authority must return it.
What the site is zoned
No current zoning polygon covers this site in the store.
Designations on or near the site
- Recorded monument × 1R149942
Nearby precedents within 500 m, last 5 years
Decisions
| Reference | Decision | Decided | Units | Distance | Description |
|---|---|---|---|---|---|
| 2660588 | Conditional | 21 Sept 2026 | 1 | 307 m | of existing dwelling house with revised site boundaries (house previously approved under Pl Ref: 95/618 and 08/3456); removal of Lifetime Enurement Clause attached to Planning File Ref: 95/618 c. all ancillary site works and site services |
| 2560875 | Conditional | 21 Oct 2025 | 0 | 319 m | of existing dwelling on revised site boundaries, new effluent treatment system and polishing filter as well as all ancillary site works |
| 25170 | Conditional | 2 Sept 2025 | 1 | 188 m | of their dwelling house , as built, and to retain a small domestic shed at rear of their house, as built, and to replace their existing septic tank with a new Wastewater Treatment System, complete with all ancillary services. Gross floor space of works to be retained: 33.64 sqm(extension), 13.47 sqm(G) |
| 2360510 | Conditional | 5 Jun 2024 | 1 | 110 m | For development consisting of refurbishment and upgrading works [including (where necessary) replacement of existing poles along the existing overhead electricity line, minor ground works e.g. replacement or installation of stays, and maintenance or improvement works]; and all associated ancillary works including the provision of temporary accessways. Replacement poles will be constructed at, or immediately adjacent to, the existing structures that they will replace. Replacement poles will have a maximum height of 12m above ground; and be similar in appearance to existing poles. Planning permission is sought for a 10 year period. A Natura Impact Statement (NIS) will be submitted to the Planning Authority with the application |
| 2260569 | Conditional | 1 Mar 2023 | 1 | 126 m | to construct a new dwelling house, effluent treatment system and polishing filter as well as all ancillary site works. Gross floor space of proposed works 173.80sqm. |
| 2260548 | Conditional | 10 Feb 2023 | 1 | 5 m | to construct a new dwelling house, effluent treatment system and polishing filter as well as all ancillary site works. Gross floor area of proposed works: 217.71 sqm (dwelling house) |
| 2260542 | Conditional | 13 Dec 2022 | 1 | 0 m | to construct a new dwelling house, effluent treatment system and polishing filter as well as all ancillary site works. Gross floor area of proposed works: 156.6 sqm |
| 212446 | Conditional | 4 Apr 2022 | 1 | 76 m | to construct a new dwelling house, garage, effluent treatment system and polishing filter as well as all ancillary site works and site services. Gross floor space of proposed works: 240.49 sqm + 40 sqm = 280.49 sqm |
Appeals
No appeals within 500 m in the last 5 years.
What has happened on this file
- 11 Sept 2026 New application · observations close 16 Oct 2026
- 11 Sept 2026 Decision
Generated from the Planning Register store; nothing was fetched live for this page. Source: national planning dataset, fetched 22 Sept 2026, 16:10. Not legal advice — confirm the deadline with Galway County Council before relying on it.