Cappanasruhaun , Attimon , Athenry
Of garage in revised location for use of granny flat and to retain revised location of treatment plant and percolation area and to retain rear outdoor garden room attached to dwelling and all associated services previous pl ref 25/53
The application
- Reference
- 26289 · full record
- Authority
- Galway County Council
- Type
- RETENTION
- Status
- NEW APPLICATION
- Units
- 1
- Floor area
- 67 m²
- Site area
- 2,281 m²
- Received
- 12 Nov 2026
- Decision due
- 15 Jan 2027
How to submit an observation
- Read the file on the council register.Drawings, planning statement and site notices are at http://www.eplanning.ie/GalwayCC/AppFileRefDetails/26289/0.
- Write your observation.Quote
26289at the top, give your name and the address the authority should reply to, and confine it to planning matters — zoning objective, height, overlooking, traffic, drainage, heritage. What you say here is what you can later appeal on. - Pay the €20 fee.Every submission needs it; without it the observation is invalid and is returned. Galway County Council takes it online with the submission or at the counter.
- Submit before 17 Dec 2026.Online through the register above, or in writing to the Planning Department, Galway County Council. The test is the date the authority receives it, not the date you post it.
- Keep the acknowledgement.The council's receipt is your proof of a valid observation — see below.
Statutory basis. Section 34(1) of the Planning and Development Act 2000 (as amended) requires a planning authority to consider any submission or observation made to it in accordance with the Regulations. Article 29 of the Planning and Development Regulations 2001 (as amended) sets the window: a submission or observation must be received by the authority within five weeks beginning on the date of receipt of the application, and must be accompanied by the prescribed fee of €20. A submission received after the window, or without the fee, is invalid and the authority must return it.
Nearby precedents within 500 m, last 5 years
Decisions
| Reference | Decision | Decided | Units | Distance | Description |
|---|---|---|---|---|---|
| 2561412 | Refused | 21 Nov 2025 | 373 m | for a period of 10 years for a development consisting of the provision of the following: i. 8 no. wind turbines with an overall turbine total tip height range of 178m - 185m, a rotor diameter range of 149m - 163m, and turbine hub height range of 101m - 104m, and associated foundations and hard standing areas; ii. A permanent 38kV substation compound (including a control building (157.6 sqm) with welfare facilities, all associated electrical plant and apparatus, security fencing, underground cabling, storage containers, wastewater holding tank, site drainage and all ancillary works); iii. Permanent underground electrical (38kV) and communications cabling to the existing Cashla Substation in the townland of Barrettspark (including joint bays, communication and earth sheath link chambers and all ancillary works along the route). This cabling route is primarily located within the public road corridor which includes protected structures (RPS No. 3747, RPS No. 146). iv. Underground electrical (20/33kV) and communications cabling connecting the wind turbines and meteorological mast to the proposed on-site substation; v. 2 no. temporary construction compounds (including site offices and welfare facilities (with a combined floor area of 202.5 sqm); vi. A meteorological mast with a height of 30 meters, security fencing and associated foundation and hard-standing area; vii. Upgrade of existing site tracks/ roads and provision of new site access roads, junctions and hardstand areas, including a new site entrance off the L3115; viii. Peat and Spoil Management Areas; ix. Tree felling and vegetation removal; x. Biodiversity enhancement measures (including peatland habitat enhancement, Marsh Fritillary habitat enhancement and management, establishment of hedgerows and native woodland planting); xi. Site drainage; xii. Operational stage site signage; and xiii. All ancillary works and apparatus. A thirty five-year operational life from the date of full commissioning of the wind turbines and subsequent decommissioning is being sought. An Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS) have been prepared in respect of the proposed development and accompany this application. An Opinion on Unconfirmed Details issued by Galway County Council (Opinion Ref. No. 25/MP/2) on 29th May 2025 accompanies this application. The details unconfirmed in this application are the turbine total tip height, rotor diameter and hub height. The range of parameters un | |
| 2553 | Conditional | 8 May 2025 | 1 | 0 m | to construct dwellinghouse, garage, treatment plant and percolation area and associated services. Gross floor space of proposed works: (H) 147 sqm & (G) 60 sqm |
Appeals
| ACP case | Type | Outcome | Decided | Distance |
|---|---|---|---|---|
| 500493 | pending | 18 Dec 2025 | 373 m |
If neighbours here have appealed before and lost, the inspector's report on that case is the single most useful thing to read.
What has happened on this file
- 12 Nov 2026 New application · observations close 17 Dec 2026
- 12 Nov 2026 Decision
Generated from the Planning Register store; nothing was fetched live for this page. Source: national planning dataset, fetched 17 Nov 2026, 23:00. Not legal advice — confirm the deadline with Galway County Council before relying on it.