PlanningRegister.ie
Observation pack · Galway County Council

Corrofin , Anbally Road , Tuam

to construct a dwelling house, domestic garage/fuel store, septic tank, treatment system and percolation area

Observations close 7 Oct 2026 14 days left
5 weeks from receipt (received 2 Sept 2026) · s.34 Planning and Development Act 2000 · art. 29 Regulations 2001 · fee 20 · council decision due 27 Oct 2026

The application

Reference
2661491 · full record
Authority
Galway County Council
Type
PERMISSION
Status
NEW APPLICATION
Applicant
not published by the national dataset — see the council register
Units
1
Floor area
174 m²
Site area
2,271 m²
Received
2 Sept 2026
We first saw it
18 Sept 2026, 15:44
Decision due
27 Oct 2026
Decision
N/a

The national dataset truncates descriptions (80 characters for DLR, 70 for Fingal) and omits the applicant. The full description and the drawings are on the council register linked in step 1.

How to submit an observation

  1. Read the file on the council register.Drawings, planning statement and site notices are at http://www.eplanning.ie/GalwayCC/AppFileRefDetails/2661491/0.
  2. Write your observation.Quote 2661491 at the top, give your name and the address the authority should reply to, and confine it to planning matters — zoning objective, height, overlooking, traffic, drainage, heritage. What you say here is what you can later appeal on.
  3. Pay the €20 fee.Every submission needs it; without it the observation is invalid and is returned. Galway County Council takes it online with the submission or at the counter.
  4. Submit before 7 Oct 2026.Online through the register above, or in writing to the Planning Department, Galway County Council. The test is the date the authority receives it, not the date you post it.
  5. Keep the acknowledgement.The council's receipt is your proof of a valid observation — see below.

Statutory basis. Section 34(1) of the Planning and Development Act 2000 (as amended) requires a planning authority to consider any submission or observation made to it in accordance with the Regulations. Article 29 of the Planning and Development Regulations 2001 (as amended) sets the window: a submission or observation must be received by the authority within five weeks beginning on the date of receipt of the application, and must be accompanied by the prescribed fee of €20. A submission received after the window, or without the fee, is invalid and the authority must return it.

After you submit: keep the acknowledgement. Under the 2024 Act it secures your right to appeal — only the applicant and a person who made a valid observation may bring the council's decision to An Coimisiún Pleanála, within four weeks of the decision. Making a valid observation is also what buys a right of appeal: under s.37(1) of the 2000 Act, only the applicant and a person who made a valid submission or observation to the planning authority may appeal the decision to An Coimisiún Pleanála (within four weeks of the decision). Missing the five-week window closes both doors.

What the site is zoned

No current zoning polygon covers this site in the store.

Designations on or near the site

Nothing designated within 100 m of the site.

Nearby precedents within 500 m, last 5 years

Decisions

ReferenceDecisionDecidedUnitsDistanceDescription
2661230Conditional10 Sept 20260412 mof the existing horse stables, dungsted and effluent storage tank (from previously granted planning reference number 09/1465) and all ancillary site works
2561433Conditional26 Nov 20251284 mfor proposed rear and side single storey extensions to the existing detached house
2560802Conditional13 Aug 20251146 mto construct a new dwelling house, and wastewater treatment system, domestic garage, and all associated site works. Gross floor space of proposed works: 257 sqm(H), 37.00 sqm(G)
24150Conditional25 Jul 20241435 mof a shower room extension to an existing bedroom and revised site boundary to existing dwelling. Gross floor space of work to be retained: 6.9 sqm
2360180Conditional9 Jun 20231133 mfor extensions to existing dwelling along with the construction of a new garage and all associated site works. Gross floor space of proposed works 86.00sqm
2260756Conditional20 Oct 20221172 msought to retain dwelling house and associated services on revised site boundaries. Gross floor space of work to be retained 118.00sqm.
2235Conditional22 Aug 2022156 mfor alterations and re-furbishment of existing dwelling and permission to construct rear and side extension to existing dwelling and all associated services. Gross floor space of proposed works: 185 sqm.
212113Refused26 May 20221461 mto construct a dwelling house, garage, effluent treatment system, percolation area and all associated works. Gross floor space of proposed works: House: 245.6 sqm, Garage: 60 sqm.

Appeals

ACP caseTypeOutcomeDecidedDistance
313864Refused28 Aug 2023462 m

If neighbours here have appealed before and lost, the inspector's report on that case is the single most useful thing to read.

What has happened on this file

  • 2 Sept 2026 New application · observations close 7 Oct 2026
  • 2 Sept 2026 Decision

Generated from the Planning Register store; nothing was fetched live for this page. Source: national planning dataset, fetched 18 Sept 2026, 15:44. Not legal advice — confirm the deadline with Galway County Council before relying on it.