PlanningRegister.ie
Observation pack · Galway County Council

Kilcreevanty , Kilbannon , Co. Galway

to construct a dwelling house, domestic garage/fuel store, septic tank, treatment system and percolation area

Observations close 9 Oct 2026 17 days left
5 weeks from receipt (received 4 Sept 2026) · s.34 Planning and Development Act 2000 · art. 29 Regulations 2001 · fee 20 · council decision due 29 Oct 2026

The application

Reference
2661509 · full record
Authority
Galway County Council
Type
PERMISSION
Status
NEW APPLICATION
Applicant
not published by the national dataset — see the council register
Units
1
Floor area
227 m²
Site area
1,979 m²
Received
4 Sept 2026
We first saw it
18 Sept 2026, 15:44
Decision due
29 Oct 2026
Decision
N/a

The national dataset truncates descriptions (80 characters for DLR, 70 for Fingal) and omits the applicant. The full description and the drawings are on the council register linked in step 1.

How to submit an observation

  1. Read the file on the council register.Drawings, planning statement and site notices are at http://www.eplanning.ie/GalwayCC/AppFileRefDetails/2661509/0.
  2. Write your observation.Quote 2661509 at the top, give your name and the address the authority should reply to, and confine it to planning matters — zoning objective, height, overlooking, traffic, drainage, heritage. What you say here is what you can later appeal on.
  3. Pay the €20 fee.Every submission needs it; without it the observation is invalid and is returned. Galway County Council takes it online with the submission or at the counter.
  4. Submit before 9 Oct 2026.Online through the register above, or in writing to the Planning Department, Galway County Council. The test is the date the authority receives it, not the date you post it.
  5. Keep the acknowledgement.The council's receipt is your proof of a valid observation — see below.

Statutory basis. Section 34(1) of the Planning and Development Act 2000 (as amended) requires a planning authority to consider any submission or observation made to it in accordance with the Regulations. Article 29 of the Planning and Development Regulations 2001 (as amended) sets the window: a submission or observation must be received by the authority within five weeks beginning on the date of receipt of the application, and must be accompanied by the prescribed fee of €20. A submission received after the window, or without the fee, is invalid and the authority must return it.

After you submit: keep the acknowledgement. Under the 2024 Act it secures your right to appeal — only the applicant and a person who made a valid observation may bring the council's decision to An Coimisiún Pleanála, within four weeks of the decision. Making a valid observation is also what buys a right of appeal: under s.37(1) of the 2000 Act, only the applicant and a person who made a valid submission or observation to the planning authority may appeal the decision to An Coimisiún Pleanála (within four weeks of the decision). Missing the five-week window closes both doors.

What the site is zoned

No current zoning polygon covers this site in the store.

Designations on or near the site

Nothing designated within 100 m of the site.

Nearby precedents within 500 m, last 5 years

Decisions

ReferenceDecisionDecidedUnitsDistanceDescription
24234Conditional1 Oct 20241354 mfor change of house plans and elevations from those previously granted under planning Ref No 21/1889 to include all ancillary site development works. Gross floor space of proposed works: 186.5 sqm
2460798Conditional7 Aug 20241407 mto refurbish existing house to include alterations to elevations and to construct new extension to rear and side, to install upgraded treatment system and percolation area, and to carry out all ancillary site development works. Gross floor space of proposed works: 106.00 sqm
2360888Conditional16 Apr 20241138 m(1) to retain the existing natural stone wall including the two number vehicular entrances to the southern boundary of the property; (2) the construction of a new flat roof replacing the substandard concrete roof on the existing front porch; (3) the construction of a new single storey extension to the rear & side elevation of the existing dwelling house; & (4) the construction of a new septic tank effluent treatment system & percolation area including all associated site development
22780Conditional17 Apr 20230349 mWORKS TO REFURBISH THE EXISTING CASTLEBAR-CLOON 110kV OVERHEAD LINE WHICH IS APPROXIMATELY 57KM LONG, AND COMPRISES 252 NO. WOODEN POLESETS AND 40 NO. STEEL ANGLE MASTS BETWEEN THE EXISTING CASTLEBAR 110kV SUBSTATION IN THE TOWNLAND OF AGHALUSKY, AND THE EXISTING CLOON 110kV SUBSTATION IN THE TOWNLAND OF CLOONASCRAGH, CO. GALWAY. APPROXIMATELY 20KM OF THE EXISTING CIRCUIT IS LOCATED WITHIN THE FUNCTIONAL AREA OF GALWAY COUNTY COUNCIL AND APPROXIMATELY 37KM IN THE FUNCTIONAL AREA OF MAYO COUNTY COUNCIL
221030Conditional1 Nov 20221223 mto refurbish the existing Castlebar-Cloon 110kV overhead line, which is approximately 57km long, and comprises 252no. wooden polesets and 40no. steel angle masts between the existing Castlebar 110kV substation in County Mayo, and the existing Cloon 110kV substation in County Galway. Approximately 20km of the existing circuit is located within the functional area of Galway County Council and approximately 37km in the functional area of Mayo County Council.The proposed uprate development is located in the townlands of Belmont, Carrownageeha, Carrownurlaur, Cloonascragh (Kilbennan), Cloonascragh (Tuam), Cloondarone, Cloonfush, Cloontooa, Kilcreevanty, Killeelaun, Kilmore, Lehid, Liskeevy, Mullagh, Pollacorragune, and Woodquay in County Galway.The works will include:• the replacement (“restringing”) of the existing overhead line circuit conductor and wires with a new higher capacity conductor including installation of a new fibre communication connection; • the replacement of the existing earthwire, including bonding leads, earth leads and vibration dampers; • the replacement of 53no. wooden polesets and 39no. steel masts; • the replacement of hardware, fittings and insulators; • the replacement of crossarms at 50no. wooden polesets and the realignment of crossarms at a further 5no. wooden polesets; • all associated site development works, including foundation upgrade works; • all associated works within the Castlebar 110kV substation and Cloon 110kV substation to accommodate the uprated 110kV overhead line including uprating of the Castlebar bay in Cloon 110kV substation and the Cloon bay in Castlebar 110kV substation; • the replacement of approximately 175m of underground cable at the Castlebar 110kV substation; • all associated temporary site development works to gain access to the existing Structures; and • other temporary associated and ancillary development works required for the purpose of the uprate of the existing circuit. A Natura Impact Statement (NIS) has been prepared in respect of the proposed development.
211889Conditional24 May 20221354 mfor construction of a new dwelling house, domestic garage/fuel store, treatment system/septic tank, percolation area and all ancillary site development works. Gross floor space of proposed works: House: 244 sqm, Garage: 60 sqm.

Appeals

No appeals within 500 m in the last 5 years.

What has happened on this file

  • 4 Sept 2026 New application · observations close 9 Oct 2026
  • 4 Sept 2026 Decision

Generated from the Planning Register store; nothing was fetched live for this page. Source: national planning dataset, fetched 18 Sept 2026, 15:44. Not legal advice — confirm the deadline with Galway County Council before relying on it.