PlanningRegister.ie
Observation pack · Galway County Council

Leitir , Moycullen , Co. Galway

for; (1) Amendments to the permitted Ardderroo Synchronous Condenser (Galway County Council Reference No. 23/60641, 24/61485, 25/60575 and 25/61825) comprising repositioning of cooling equipment and provision of 1 no. container within the synchronous condenser compound, a revised footprint of the 110kV electrical compound, revision of the 110kV underground cabling route to Knockranny substation and provision of a new access road and widening of the existing road to accommodate the revised underground electrical cabling. (2) Amendment to the Knockranny Wind Farm grid connection (permitted under An Coimisiún Pleanála Reference No. PL07.318723), comprising revised underground electrical (33kV) and communications cabling route to connect to the 110kV electrical compound. A Natura Impact Statement (NIS) has been prepared in respect of the proposed development. Beidh an fhorbairt bheartaithe comhdhéanta de: (1) Leasuithe ar an gComhdhlúthadóir Sioncronach Ardderroo ceadaithe (Uimhreacha Tagartha Chomhairle Chontae na Gaillimhe 23/60641, 24/61485, 25/60575 agus 25/61825) lena n-áirítear athshuíomh trealaimh fhuaraithe agus soláthar de 1 uimh. coimeádáin laistigh de chomhdhúil an chomhdhlúthadóra shioncronach, lorg athbhreithnithe do chomhdhúil leictreach 110kV, athbhreithniú ar an mbealach cáblaithe 110kV faoi thalamh go dtí fostáisiún Knockranny agus soláthar bóthair rochtana nua agus leathnú an bhóthair reatha chun freastal ar an gcábla leictreach faoi thalamh athbhreithnithe. (2) Leasú ar nasc eangach Feirm Gaoithe Knockranny (ceadaithe faoi Uimhir Thagartha An Coimisiún Pleanála PL07.318723), lena n-áirítear bealach athbhreithnithe do chábla leictreach (33kV) agus cumarsáide faoi thalamh chun nascadh leis an gcomhdhúil leictreach 110kV. Ullmhaíodh Ráiteas Tionchair Natura (NIS) i ndáil leis an bhforbairt bheartaithe

Observations close 23 Oct 2026 2 days left
5 weeks from receipt (received 18 Sept 2026) · s.34 Planning and Development Act 2000 · art. 29 Regulations 2001 · fee €20 · council decision due 12 Nov 2026

The application

Reference
2661584 · full record
Authority
Galway County Council
Type
PERMISSION
Status
NEW APPLICATION
Applicant
not published by the national dataset — see the council register
Units
0
Floor area
—
Site area
12.56 ha
Received
18 Sept 2026
We first saw it
29 Sept 2026, 23:03
Decision due
12 Nov 2026
Decision
N/a

The national dataset truncates descriptions (80 characters for DLR, 70 for Fingal) and omits the applicant. The full description and the drawings are on the council register linked in step 1.

How to submit an observation

  1. Read the file on the council register.Drawings, planning statement and site notices are at http://www.eplanning.ie/GalwayCC/AppFileRefDetails/2661584/0.
  2. Write your observation.Quote 2661584 at the top, give your name and the address the authority should reply to, and confine it to planning matters — zoning objective, height, overlooking, traffic, drainage, heritage. What you say here is what you can later appeal on.
  3. Pay the €20 fee.Every submission needs it; without it the observation is invalid and is returned. Galway County Council takes it online with the submission or at the counter.
  4. Submit before 23 Oct 2026.Online through the register above, or in writing to the Planning Department, Galway County Council. The test is the date the authority receives it, not the date you post it.
  5. Keep the acknowledgement.The council's receipt is your proof of a valid observation — see below.

Statutory basis. Section 34(1) of the Planning and Development Act 2000 (as amended) requires a planning authority to consider any submission or observation made to it in accordance with the Regulations. Article 29 of the Planning and Development Regulations 2001 (as amended) sets the window: a submission or observation must be received by the authority within five weeks beginning on the date of receipt of the application, and must be accompanied by the prescribed fee of €20. A submission received after the window, or without the fee, is invalid and the authority must return it.

After you submit: keep the acknowledgement. Under the 2024 Act it secures your right to appeal — only the applicant and a person who made a valid observation may bring the council's decision to An Coimisiún Pleanála, within four weeks of the decision. Making a valid observation is also what buys a right of appeal: under s.37(1) of the 2000 Act, only the applicant and a person who made a valid submission or observation to the planning authority may appeal the decision to An Coimisiún Pleanála (within four weeks of the decision). Missing the five-week window closes both doors.

What the site is zoned

No current zoning polygon covers this site in the store.

Designations on or near the site

Nothing designated within 100 m of the site.

Nearby precedents within 500 m, last 5 years

Decisions

ReferenceDecisionDecidedUnitsDistanceDescription
2561825Conditional10 Feb 202600 m(10 mbliana) chun leasuithe ar Chomhdhlúthadán Sioncrónach na nArd-doiriú atá ceadaithe (Uimhir Thagartha Chomhairle Contae na Gaillimhe 23/60641, 24/61485 agus 25/60575) lena n-áirítear lorg coise méadaithe ar an gcampún tógála sealadach, áiseanna foirne le dabhach coinneála fuíolluisce faoi thalamh, nasc cáblaí faoi thalamh athbhreithnithe go dtí an gcampún leictreach 110kV, lorg coise athbhreithnithe ar an gcampún leictreach 110kV, fálú imlíne athbhreithnithe, foirgneamh rialaithe amháin breise le háiseanna leasa agus dabhach coinneála fuíolluisce faoi thalamh, gléasra agus fearas leictreach gaolmhar agus nasc cáblaí faoi thalamh 110kV athbhreithnithe leis an bhfostáisiún Chnoc Raithní atá ann cheana féin. Leasuithe ar nasc eangaí Feirm Ghaoithe Chnoc Raithní atá ann cheana féin (ceadaithe faoi Uimhir Thagartha an Choimisiúin Phleanála PL07.318723), lena n-áirítear bealach cáblaí faoi thalamh (33kV) agus cumarsáide athbhreithnithe chun ceangal leis an gcampún leictreach 110kV nua (lena n-áirítear an rian seirbhíse cábla gaolmhar), agus an síneadh ar Fhostáisiún na nArd-doiriú a fhágáil ar lár. Ullmhaíodh Ráiteas Tionchair Natura (NIS) i ndáil leis an bhforbairt atá beartaithe (10 year) for amendments to the permitted Ardderroo Synchronous Condenser (Galway County Council Reference No. 23/60641, 24/61485 and 25/60575) comprising an increased temporary construction compound footprint, staff facilities with underground wastewater holding tank, revised underground cabling connection to the 110kV electrical compound, a revised footprint of the 110kV electrical compound, revised perimeter fencing, 1 no. additional control building with welfare facilities and an underground wastewater holding tank, associated electrical plant and apparatus and a revised 110kV underground cabling connection to the existing Knockranny substation. Amendments to the Knockranny Wind Farm grid connection (permitted under An Coimisiún Pleanála Reference No. PL07.318723), comprising revised underground electrical (33kV) and communications cabling route to connect to the new 110kV electrical compound (including associated cable service track), and the omission of the extension to the Ardderroo Substation. A Natura Impact Statement (NIS) has been prepared in respect of the proposed development
2560575Conditional18 Jun 202500 mfor the proposed development will consist of amendments to the permitted Ardderroo Synchronous Condenser (Galway County Council Reference No. 23/60641 and 24/61485). The amendments comprise revised underground cabling connection to a new 110kV electrical compound, with perimeter fencing, 1 no. control building, associated electrical plant and apparatus and 110kV underground cabling connection to the existing Knockranny substation and all associated works. A Natura Impact Statement (NIS) has been prepared in respect of the proposed development. Is éard a bheidh san fhorbairt bheartaithe ná leasuithe ar Chomhdhlúthadán Sioncronach na nArd-doiriú ceadaithe (Uimhir Thagartha 23/60641 agus 24/61485 ó Chomhairle Contae na Gaillimhe). Is éard atá sna leasuithe ná nasc cáblaithe faoi thalamh athbhreithnithe go dtí cumaisc leictreach 110kV nua, le fál imlíneach, 1 uimh. foirgneamh rialaithe, fearas agus gaireas leictreach gaolmhar agus nasc cáblaithe 110kV faoi thalamh go dtí fostáisiún reatha Chnoc Raithní agus na hoibreacha gaolmhara go léir. Ullmhaíodh Ráiteas Tionchair Natura (NIS) i ndáil leis an bhforbairt atá beartaithe. Gross floor space of proposed works: 179.31 sqm
2461485Conditional7 Jan 202510 mchun is éard a bheidh san fhorbairt bheartaithe 1) leasuithe ar Chomhdhlúthadán Sioncronach na nArd-doiriú ceadaithe (Uimhir Thagartha 23/60641 ó Chomhairle Contae na Gaillimhe). Is éard atá sna leasuithe airde fhoirgneamh an Chomhdhlúthadáin Shioncronaigh a ardú ó 12.5m go 15.3m, athruithe ar chompún an Chomhdhlúthadáin Shioncronaigh agus ar ghléasra agus gaireas gaolmhar, fálú slándála na himlíne, na rianta rochtana, an compún tógála sealadach, agus cáblú athbhreithnithe faoi thalamh lena n-áirítear nasc 110kV le fostáisiún Buffy in aice láimhe (laistigh d’Fheirm Ghaoithe na nArd-doiriú). Bonneagar leictreach breise, fálú slándála ar an imlíne agus crua-limistéar chuig fostáisiún Buffy 110kV chun an nasc athbhreithnithe a éascú. Gross floor space of proposed works: 798 sqm
23225Conditional22 Nov 202300 mfor the following: (1) alterations to the Cnoc Raithní (Knockranny) Wind Farm (Galway County Council pl. ref. no. 13/829 & ABP ref: 07.243094 comprising 11no. wind turbines with an overall ground to blade tip height of 150m (an increase of 19.5m & 9.5m from 130.5m & 140.5m, as previously permitted), a rotor blade length of 68m or 69m & a hub height of 81m or 82m; associated increase in turbine foundations; & omission of permitted on-site 110kV substation & underground cabling; (2) provision of underground electrical (33kV) & communications cabling connecting the 11no. wind turbines to the Ardderroo wind farm substation for the purposes of connection to the national grid, including a new cable service track (with watercourse/culvert crossings) & widening of an existing access road; extension of the Ardderroo substation within the existing substation compound, including control building extension, new 110kV transformer & electrical plant & apparatus; (3) all associated site development & ancillary works above & below ground in support of the above, including site drainage & tree felling; (4) an operational period & planning permission duration to align with the existing permission (ABP ref: 07.243094). An Environmental Impact Assessment Report (EIAR) & Natura Impact Statement (NIS) have been prepared & will be submitted to the Planning Authority with the application
2360641Conditional12 Oct 202300 mfor a 10-year permission for development at this site at Letter, Moycullen, Co. Galway. This site is located within a Gaeltacht area. The proposed development will consist of the provision of a synchronous condenser, enclosed within a building (12.5 metres high) with associated plant and apparatus, transformers, circuit breakers, modular electrical control containers, air compressor, cooling equipment, underground cabling (including 110kV connection to the adjacent Buffy substation (within Ardderroo Wind Farm), lightning protection poles, perimeter security fencing, drainage, landscaping, temporary construction compound, access tracks (new and upgrade of existing), all ancillary site development works. A Natura Impact Statement (NIS) has been prepared in respect of the proposed development. *** Tá sé ar intinn ag Buffy Letter Limited iarratas deich mbliana a dhéanamh ar chead chun forbairt a dhéanamh ag an suíomh seo Leitir, Maigh Cuilinn i gCo. na Gaillimhe. Tá an suíomhsuite i gceantar Gaeltachta. Is éard a bheidh san fhorbairt atá beartaithe ná comhdhlúthadán sioncronach a sholáthar, iata laistigh d’fhoirgneamh (12.5 méadar ar airde) le planda gaolmhar agus gaireas, claochladáin, scoradáin chiorcaid, coimeádáin rialaithe leictreach modúlach, comhbhrúiteoir aeir, trealamh fuaraithe, cáblaí faoi thalamh lena n-áirítear ceangal 110kV le fostáisiún Buffy in aice leis (laistigh de Ardderroo Wind Farm), cuaillí cosanta tintreach, fálú slándála imlíne, draenáil, tírdhreachú, bábhún tógála sealadach, rianta rochtana (nua agus uasghrádú atá ann cheana féin), gach obair fhorbartha choimhdeach ar an suíomh. Ullmhaíodh Ráiteas Tionchair Natura (NIS) i ndáil leis an bhforbairt atá beartaithe

Appeals

ACP caseTypeOutcomeDecidedDistance
321785—Withdrawn17 Feb 20250 m
318723—Granted with conditions30 Sept 20240 m

If neighbours here have appealed before and lost, the inspector's report on that case is the single most useful thing to read.

What has happened on this file

  • 18 Sept 2026 New application · observations close 23 Oct 2026
  • 18 Sept 2026 Decision

Generated from the Planning Register store; nothing was fetched live for this page. Source: national planning dataset, fetched 29 Sept 2026, 23:03. Not legal advice — confirm the deadline with Galway County Council before relying on it.