Glenmeen , Kilreekil , Co. Galway
to construct a domestic garage/fuel store with all ancillary site works
The application
- Reference
- 2661600 · full record
- Authority
- Galway County Council
- Type
- PERMISSION
- Status
- NEW APPLICATION
- Applicant
- not published by the national dataset — see the council register
- Units
- 0
- Floor area
- —
- Site area
- 1,532 m²
- Received
- 24 Sept 2026
- We first saw it
- 30 Sept 2026, 23:22
- Decision due
- 18 Nov 2026
- Decision
- N/a
The national dataset truncates descriptions (80 characters for DLR, 70 for Fingal) and omits the applicant. The full description and the drawings are on the council register linked in step 1.
How to submit an observation
- Read the file on the council register.Drawings, planning statement and site notices are at http://www.eplanning.ie/GalwayCC/AppFileRefDetails/2661600/0.
- Write your observation.Quote
2661600at the top, give your name and the address the authority should reply to, and confine it to planning matters — zoning objective, height, overlooking, traffic, drainage, heritage. What you say here is what you can later appeal on. - Pay the €20 fee.Every submission needs it; without it the observation is invalid and is returned. Galway County Council takes it online with the submission or at the counter.
- Submit before 29 Oct 2026.Online through the register above, or in writing to the Planning Department, Galway County Council. The test is the date the authority receives it, not the date you post it.
- Keep the acknowledgement.The council's receipt is your proof of a valid observation — see below.
Statutory basis. Section 34(1) of the Planning and Development Act 2000 (as amended) requires a planning authority to consider any submission or observation made to it in accordance with the Regulations. Article 29 of the Planning and Development Regulations 2001 (as amended) sets the window: a submission or observation must be received by the authority within five weeks beginning on the date of receipt of the application, and must be accompanied by the prescribed fee of €20. A submission received after the window, or without the fee, is invalid and the authority must return it.
What the site is zoned
No current zoning polygon covers this site in the store.
Designations on or near the site
Nothing designated within 100 m of the site.
Nearby precedents within 500 m, last 5 years
Decisions
| Reference | Decision | Decided | Units | Distance | Description |
|---|---|---|---|---|---|
| 2561566 | Conditional | 15 Dec 2025 | 1 | 0 m | for the existing site entrance/exit gate located at the eastern side of the site. Full planning permission to close up the existing site entrance/exit which is location at the road junction toward the north of the site. Full planning permission to retain the existing extension at the rear of the dwelling and its associated new roof and first floor accommodation with all ancillary site works |
| 2560933 | Conditional | 9 Dec 2025 | 1 | 0 m | to construct 4 new dwelling houses with wastewater treatment plants, tertiary treatment units percolation areas, domestic garages, access road and all associated site works. Gross floor space of proposed works: 833.43 sqm(h), 90.88 sqm(G) |
| 2560892 | Refused | 28 Aug 2025 | 0 | 0 m | and complete the unauthorized domestic garage/fuel storage shed with all its ancillary site works. Full planning permission also sought to demolish the existing decaying storage shed located at the rear of the dwelling. Gross floor space of work to be retained: 54 sqm. Gross floor space of any demolition: 12 sqm |
| 2361455 | Conditional | 2 Feb 2024 | 1 | 137 m | for: (a) the construction of an extension to the rear of the existing dwelling, (b) changes to the existing dwelling house, (c) and all associated site services. Gross floor space of work to be retained: 37 sqm |
Appeals
No appeals within 500 m in the last 5 years.
What has happened on this file
- 24 Sept 2026 New application · observations close 29 Oct 2026
- 24 Sept 2026 Decision
Generated from the Planning Register store; nothing was fetched live for this page. Source: national planning dataset, fetched 30 Sept 2026, 23:22. Not legal advice — confirm the deadline with Galway County Council before relying on it.