An Chloch Scoilte , (Cloghscoltia) , Barna
for; 1. the provision of a new self-contained living unit. 2. The replacement of the existing sewage treatment system. 3. The demolition of the existing sheds and the provision of a new garage along with all associated site works
The application
- Reference
- 2661646 · full record
- Authority
- Galway County Council
- Type
- PERMISSION
- Status
- NEW APPLICATION
- Applicant
- not published by the national dataset — see the council register
- Units
- 1
- Floor area
- 75 m²
- Site area
- 2,632 m²
- Received
- 2 Oct 2026
- We first saw it
- 14 Oct 2026, 01:45
- Decision due
- 26 Nov 2026
- Decision
- N/a
The national dataset truncates descriptions (80 characters for DLR, 70 for Fingal) and omits the applicant. The full description and the drawings are on the council register linked in step 1.
How to submit an observation
- Read the file on the council register.Drawings, planning statement and site notices are at http://www.eplanning.ie/GalwayCC/AppFileRefDetails/2661646/0.
- Write your observation.Quote
2661646at the top, give your name and the address the authority should reply to, and confine it to planning matters — zoning objective, height, overlooking, traffic, drainage, heritage. What you say here is what you can later appeal on. - Pay the €20 fee.Every submission needs it; without it the observation is invalid and is returned. Galway County Council takes it online with the submission or at the counter.
- Submit before 6 Nov 2026.Online through the register above, or in writing to the Planning Department, Galway County Council. The test is the date the authority receives it, not the date you post it.
- Keep the acknowledgement.The council's receipt is your proof of a valid observation — see below.
Statutory basis. Section 34(1) of the Planning and Development Act 2000 (as amended) requires a planning authority to consider any submission or observation made to it in accordance with the Regulations. Article 29 of the Planning and Development Regulations 2001 (as amended) sets the window: a submission or observation must be received by the authority within five weeks beginning on the date of receipt of the application, and must be accompanied by the prescribed fee of €20. A submission received after the window, or without the fee, is invalid and the authority must return it.
What the site is zoned
No current zoning polygon covers this site in the store.
Designations on or near the site
Nothing designated within 100 m of the site.
Nearby precedents within 500 m, last 5 years
Decisions
| Reference | Decision | Decided | Units | Distance | Description |
|---|---|---|---|---|---|
| 2560410 | Conditional | 30 May 2025 | 1 | 201 m | for the construction of a dwelling house, shed/store car port and private wastewater treatment system with all associated works and ancillary services. Gross floor space of proposed works: 207.70 sqm(H), 11.40 sqm(shed/store) |
| 2461131 | Conditional | 29 Apr 2025 | 1 | 25 m | for the construction of a two storey dwelling house, wastewater treatment system, percolation area, new vehicular site entrance and all ancillary site works. Gross floor space of proposed works: 202 sqm |
| 2360511 | Conditional | 5 Jun 2024 | 1 | 391 m | for the development consisting of refurbishment and upgrading works [including (where necessary) replacement of existing poles along the existing overhead electricity line, minor ground works e.g. replacement or installation of stays, and maintenance or improvement works]; and all associated ancillary works including the provision of temporary accessways. Replacement poles will be constructed at, or immediately adjacent to, the existing structures that they will replace. Replacement poles will have a maximum height of 12m above ground; and be similar in appearance to existing poles. Planning permission is sought for a 10 year period. A Natura Impact Statement (NIS) will be submitted to the Planning Authority with the application |
| 2260860 | Conditional | 17 Aug 2023 | 1 | 236 m | (1) cead coinneáil chun athru atá deanta ar leagan amach an suíomh a bhí ceadaigh faoi uimhir pleanail 18/817, (2) cead coinneáil chun oibreacha tochailte agus líonadh talún ata deanta, (3) cead le haghaidh líónra draenala and oibreacha breise ar an suiomh a dheanamh, (4) cead pleanail le haghaidh cúirt leadóige príobháideach, clós súgartha gasúr, agus dearadh tírdhreacha chomh maith le aon oibreacha coimhdeacha ata ag teastáil ag an seoladh thuas. Gross floor space of work to be retained 446.20 sqm |
| 2360528 | Refused | 11 Jul 2023 | 1 | 324 m | for the construction of a serviced dwelling with an effluent treatment system and a garage/shed. Gross floor space of proposed works: 247.60sqm |
| 2260672 | Conditional | 2 Nov 2022 | 1 | 259 m | for an agricultural entrance & all associated site works. |
| 22475 | Conditional | 2 Jun 2022 | 1 | 146 m | the construction of a single storey extension to the front & side, alterations to existing elevations and internal alterations to ground & first floor, upgrade works to the existing wastewater treatment system and all ancillary site works. Gross floor space of proposed works 25.59 sqm. |
| 2260205 | Refused | 4 May 2022 | 1 | 179 m | Dwelling house, garage/shed and private wastewater treatment system with all associated works and ancillary services |
Appeals
| ACP case | Type | Outcome | Decided | Distance |
|---|---|---|---|---|
| 318217 | — | Granted | 7 Apr 2026 | 279 m |
| 318220 | — | Granted with conditions | 7 Apr 2026 | 279 m |
| 302885 | — | Granted | 6 Dec 2021 | 279 m |
| 302848 | — | Granted with conditions | 6 Dec 2021 | 279 m |
If neighbours here have appealed before and lost, the inspector's report on that case is the single most useful thing to read.
What has happened on this file
- 2 Oct 2026 New application · observations close 6 Nov 2026
- 2 Oct 2026 Decision
Generated from the Planning Register store; nothing was fetched live for this page. Source: national planning dataset, fetched 14 Oct 2026, 01:45. Not legal advice — confirm the deadline with Galway County Council before relying on it.