PlanningRegister.ie
Observation pack · Galway County Council

Peak , Barnaderg , Tuam

For construction of a new dwelling house, domestic garage/fuel store, treatment system/septic tank, percolation area and all ancillary site development works

Observations close 25 Nov 2026 9 days left
5 weeks from receipt (received 21 Oct 2026) · s.34 Planning and Development Act 2000 · art. 29 Regulations 2001 · fee €20 · council decision due 15 Dec 2026

The application

Reference
2661743 · full record
Authority
Galway County Council
Type
PERMISSION
Status
NEW APPLICATION
Units
1
Floor area
220 m²
Site area
3,786 m²
Received
21 Oct 2026
Decision due
15 Dec 2026

How to submit an observation

  1. Read the file on the council register.Drawings, planning statement and site notices are at http://www.eplanning.ie/GalwayCC/AppFileRefDetails/2661743/0.
  2. Write your observation.Quote 2661743 at the top, give your name and the address the authority should reply to, and confine it to planning matters — zoning objective, height, overlooking, traffic, drainage, heritage. What you say here is what you can later appeal on.
  3. Pay the €20 fee.Every submission needs it; without it the observation is invalid and is returned. Galway County Council takes it online with the submission or at the counter.
  4. Submit before 25 Nov 2026.Online through the register above, or in writing to the Planning Department, Galway County Council. The test is the date the authority receives it, not the date you post it.
  5. Keep the acknowledgement.The council's receipt is your proof of a valid observation — see below.

Statutory basis. Section 34(1) of the Planning and Development Act 2000 (as amended) requires a planning authority to consider any submission or observation made to it in accordance with the Regulations. Article 29 of the Planning and Development Regulations 2001 (as amended) sets the window: a submission or observation must be received by the authority within five weeks beginning on the date of receipt of the application, and must be accompanied by the prescribed fee of €20. A submission received after the window, or without the fee, is invalid and the authority must return it.

After you submit: keep the acknowledgement. Under the 2024 Act it secures your right to appeal — only the applicant and a person who made a valid observation may bring the council's decision to An Coimisiún Pleanála, within four weeks of the decision. Making a valid observation is also what buys a right of appeal: under s.37(1) of the 2000 Act, only the applicant and a person who made a valid submission or observation to the planning authority may appeal the decision to An Coimisiún Pleanála (within four weeks of the decision). Missing the five-week window closes both doors.

Nearby precedents within 500 m, last 5 years

Decisions

ReferenceDecisionDecidedUnitsDistanceDescription
2561392Refused19 Nov 2025196 mfor construction of a dwelling house, domestic garage, waste water system and all associated site works
23355Conditional17 Sept 20241285 mto upgrade the existing 220k overhead line between the existing Cashla 220kV Substation in the townland of Barrettspark, Co. Galway, & Tower 138 in the townland of Oughtagh, Co. Galway. The proposed development will consist of refurbishment works to the existing overhead Line (approximately 49 km long & comprising of 138no. steel angle masts). The refurbishment works to towers will consist of: installation of replacement parts on the towers including insulators, shield wire, vibration dampeners, arching horns & anti-climbing guards; associated site development works, including temporary work areas, foundation refurbishment /strengthening & recapping/clearing of shear blocks; clearance of shear block bases; & ancillary works; ancillary site preparation works, site clearance & levelling at the 6no. temporary construction compounds & associated temporary works to existing tracks & new temporary access routes to provide internal access routes to each tower with all associated works required to facilitate the development. No works will be undertaken to the overhead line (conductor). The proposed development will also consist of upgrades to the Cashla 220kV substation that will consist of: the decommissioning and removal of line bay equipment within the substation boundary; construction of a new adjacent offline like for like line bay & associated bay protection cabinets within the substation boundary; & new overhead lines connection between the end mast & the new line bay. A Natura Impact Statement (NIS) will be submitted to the planning authority with the application

What has happened on this file

  • 21 Oct 2026 New application · observations close 25 Nov 2026
  • 21 Oct 2026 Decision

Generated from the Planning Register store; nothing was fetched live for this page. Source: national planning dataset, fetched 3 Nov 2026, 23:01. Not legal advice — confirm the deadline with Galway County Council before relying on it.