PlanningRegister.ie
Observation pack · Galway County Council

Moanbaun , Athenry , Co. Galway

For construction of a single storey changing rooms building, 2no covered padel courts with associated floodlighting, a tiered & covered spectator stand, reconfiguration of previously approved parking area as approved under Pl. Ref: 25/61193, to include additional parking spaces plus the relocation of storage unit as approved under Pl. Ref:23/229 & wastewater treatment system and all associated site services. All works to be undertaken at upper sports field area

Observations close 11 Dec 2026 22 days left
5 weeks from receipt (received 6 Nov 2026) · s.34 Planning and Development Act 2000 · art. 29 Regulations 2001 · fee €20 · council decision due 9 Jan 2027

The application

Reference
2661831 · full record
Authority
Galway County Council
Type
PERMISSION
Status
NEW APPLICATION
Site area
6.24 ha
Received
6 Nov 2026
Decision due
9 Jan 2027

How to submit an observation

  1. Read the file on the council register.Drawings, planning statement and site notices are at http://www.eplanning.ie/GalwayCC/AppFileRefDetails/2661831/0.
  2. Write your observation.Quote 2661831 at the top, give your name and the address the authority should reply to, and confine it to planning matters — zoning objective, height, overlooking, traffic, drainage, heritage. What you say here is what you can later appeal on.
  3. Pay the €20 fee.Every submission needs it; without it the observation is invalid and is returned. Galway County Council takes it online with the submission or at the counter.
  4. Submit before 11 Dec 2026.Online through the register above, or in writing to the Planning Department, Galway County Council. The test is the date the authority receives it, not the date you post it.
  5. Keep the acknowledgement.The council's receipt is your proof of a valid observation — see below.

Statutory basis. Section 34(1) of the Planning and Development Act 2000 (as amended) requires a planning authority to consider any submission or observation made to it in accordance with the Regulations. Article 29 of the Planning and Development Regulations 2001 (as amended) sets the window: a submission or observation must be received by the authority within five weeks beginning on the date of receipt of the application, and must be accompanied by the prescribed fee of €20. A submission received after the window, or without the fee, is invalid and the authority must return it.

After you submit: keep the acknowledgement. Under the 2024 Act it secures your right to appeal — only the applicant and a person who made a valid observation may bring the council's decision to An Coimisiún Pleanála, within four weeks of the decision. Making a valid observation is also what buys a right of appeal: under s.37(1) of the 2000 Act, only the applicant and a person who made a valid submission or observation to the planning authority may appeal the decision to An Coimisiún Pleanála (within four weeks of the decision). Missing the five-week window closes both doors.

Nearby precedents within 500 m, last 5 years

Decisions

ReferenceDecisionDecidedUnitsDistanceDescription
2661048Conditional18 Aug 20261464 mfor a Large-Scale Residential Development. The application is being made under the provisions of the Planning and Development (Amendment) (Large Scale Residential Development) Act 2021. The proposed development will consist of the following: construction of 136 no. residential units comprising of: 21 no. 2-bed residential units, 104 no. 3-bed residential units, 11 no. 4-bed residential units; the provision of pedestrian and cyclist infrastructure fronting the development on the Raheen Road (L-3103); the installation of a raised zebra crossing on the Raheen Road (L-3103); provision of 2 no. pedestrian and cyclist entrances from the Raheen Road (L-3103) and 1 no. vehicular entrance from the Raheen Road (L-3103); the provision of hard and soft landscaping and boundary treatments including a new stone wall along the southern boundary; the setback of the existing stonewall along the southeastern boundary; provision of shared communal and private open space, car and bicycle parking, bin storage, public lighting, photovoltaic panels at roof level and 2 no. ESB substations; all associated surface water, watermain and foul water drainage services and connections (including nature-based drainage solutions and a pumping station) and all associated site works and ancillary services necessary to facilitate the proposed development. The application contains a statement setting out how the proposal is consistent with the objectives of the Galway County Development Plan 2022-2028
2561193Conditional15 Oct 20250 mfor upgrading of existing service vehicle entrance to rear of site from road L-3103 (60kph), provision of parking area to western end of existing sports arena
23229Conditional14 Feb 202410 mof: a) revised levels & location of upper playing field area, previously approved under pl. ref:17/1883; b) retention of community walkway to perimeter of upper playing field area; c) retention of external exercise equipment, water font & bench seating alongside community walkway; d) retention of accessible ramp & external stairs; e) retention of spectator rail & ball stop fencing to pitch area; f) retention of diesel generator powering previously approved floodlights as per pl. ref: 17/1883; g) retention of revised floodlight locations as approved under pl. ref: 17/1883; h) provision of new pedestrian access to front boundary wall of site; i) provision of new pathway linking said entrance to the existing community walkway; j) provision of extended community walkway to run alongside perimeter of all playing pitches to aide accessibility to all pitches; k) provision of low level lighting to entirety of community walkway; l) provision of floodlighting to existing car park area (car park previously approved under pl. refs: 00/26 & 02/1583); m) provision of additional fencing & ball stop netting to existing all weather pitch & perimeter of running track area; n) provision of warm up area to interior of running track in an astro surface; o) provision of a high jump area to interior of running track in a synthetic surface to match track; p) provision of a shot putt throw area to interior of running track in a tarmacadam finish with sand/gravel landing pit area; q) provision of tarmac finish to existing rear service road onto L-3103 to facilitate emergency vehicle access to playing field area; r) provision of a long jump area to track side in a synthetic finish to match track surface; s) provision of storage compound to western end of site to house sports & maintenance equipment; t) provision of additional bench seating alongside community walkway
2261321Conditional23 Aug 2023214 mfor industrial development, the development will consist of: • the provision of a 2no. storey industrial warehousing unit & ancillary office space (8826.3sqm.); • the provision of a service yard plant & refuse area, distribution & circulation yard with 5no. level access loading bays; • the provision of solar PV panels; • the provision of 163no. car parking spaces & 163no. bicycle parking spaces; • the provision of internal roadways, pedestrian footpaths & associated landscaping; • the provision of a new vehicular & pedestrian access from Ballydavid South road; • the provision of signage & all other associated site development works intended to facilitate the proposed development

Appeals

ACP caseTypeOutcomeDecidedDistance
324641pending14 Sept 2026464 m

If neighbours here have appealed before and lost, the inspector's report on that case is the single most useful thing to read.

What has happened on this file

  • 6 Nov 2026 New application · observations close 11 Dec 2026
  • 6 Nov 2026 Decision

Generated from the Planning Register store; nothing was fetched live for this page. Source: national planning dataset, fetched 17 Nov 2026, 23:00. Not legal advice — confirm the deadline with Galway County Council before relying on it.