PlanningRegister.ie
Observation pack · Galway County Council

Monivea Demesne , Monivea , Athenry

For construction of a new dwelling house, garage, wastewater treatment system and all associated site services

Observations close 17 Dec 2026 26 days left
5 weeks from receipt (received 12 Nov 2026) · s.34 Planning and Development Act 2000 · art. 29 Regulations 2001 · fee €20 · council decision due 15 Jan 2027

The application

Reference
2661870 · full record
Authority
Galway County Council
Type
PERMISSION
Status
PRE_VALIDATION
Units
1
Floor area
225 m²
Site area
4,040 m²
Received
12 Nov 2026
Decision due
15 Jan 2027

How to submit an observation

  1. Read the file on the council register.Drawings, planning statement and site notices are at http://www.eplanning.ie/GalwayCC/AppFileRefDetails/2661870/0.
  2. Write your observation.Quote 2661870 at the top, give your name and the address the authority should reply to, and confine it to planning matters — zoning objective, height, overlooking, traffic, drainage, heritage. What you say here is what you can later appeal on.
  3. Pay the €20 fee.Every submission needs it; without it the observation is invalid and is returned. Galway County Council takes it online with the submission or at the counter.
  4. Submit before 17 Dec 2026.Online through the register above, or in writing to the Planning Department, Galway County Council. The test is the date the authority receives it, not the date you post it.
  5. Keep the acknowledgement.The council's receipt is your proof of a valid observation — see below.

Statutory basis. Section 34(1) of the Planning and Development Act 2000 (as amended) requires a planning authority to consider any submission or observation made to it in accordance with the Regulations. Article 29 of the Planning and Development Regulations 2001 (as amended) sets the window: a submission or observation must be received by the authority within five weeks beginning on the date of receipt of the application, and must be accompanied by the prescribed fee of €20. A submission received after the window, or without the fee, is invalid and the authority must return it.

After you submit: keep the acknowledgement. Under the 2024 Act it secures your right to appeal — only the applicant and a person who made a valid observation may bring the council's decision to An Coimisiún Pleanála, within four weeks of the decision. Making a valid observation is also what buys a right of appeal: under s.37(1) of the 2000 Act, only the applicant and a person who made a valid submission or observation to the planning authority may appeal the decision to An Coimisiún Pleanála (within four weeks of the decision). Missing the five-week window closes both doors.

Nearby precedents within 500 m, last 5 years

Decisions

ReferenceDecisionDecidedUnitsDistanceDescription
2660852Conditional15 Jul 2026321 mof existing covered spectator standing area; retention and relocation of existing storage container, plus permission for completion and reconfiguration of existing parking area as previously approved under Pl. Ref: 18-1348; first floor extension to existing changing rooms; temporary gym structure; provision of a new tiered spectator stand; provision of a 4G astro training pitch, to include associated floodlights, drainage & security fencing
2461392Conditional5 Dec 20241338 mfor revised alterations and extensions to an existing dwelling house to that previously granted under planning reference 23/60542. Gross floor space of proposed works: 33.70 sqm
2460616Conditional16 Jul 20241371 mfor conversion of derelict barn / storage building at rear of existing dwelling to new residential unit, ancillary to existing dwelling
2460157Conditional9 Apr 2024180 mto: 1. relocate and extend the overall length (to the West) of the existing football pitch (pitch number 2), 2. extend the existing floodlighting system to cover the extended pitch (pitch number 2), consisting of 3 additional floodlights on both sides of the pitch, 3. install a new walkway track around the existing GAA ground, 4. install a new all-weather surface for training purposes between Pitch number 1 and 2, 5. erect new catch nets behind the goals of pitch number 2 and all ancillary site works.
2360542Conditional8 Sept 20231338 mof alterations and extension to existing dwelling house and replacing existing septic tank with treatment plant and percolation area
22670Conditional10 May 20231321 ma) 34m high monopole support structure with 3m extension (overall height 27m above ground level) carrying telecommunications antennas, dishes & associated equipment, b) new ground equipment, cabinets & landscaping, c) 2.4m high fence to perimeter of new telecommunications compound.

Appeals

ACP caseTypeOutcomeDecidedDistance
317251Granted with conditions19 Sept 2024321 m

If neighbours here have appealed before and lost, the inspector's report on that case is the single most useful thing to read.

What has happened on this file

  • 12 Nov 2026 New application · observations close 17 Dec 2026
  • 12 Nov 2026 Decision

Generated from the Planning Register store; nothing was fetched live for this page. Source: national planning dataset, fetched 17 Nov 2026, 23:00. Not legal advice — confirm the deadline with Galway County Council before relying on it.