An Carn Mór Thiar , Steiner Factory , R339

For the change of design of the warehouse extension granted under planning permission 24-61311. The development will consist of an alteration to the loading area, changes to the side elevation and the removal of the mezzanine floor and altered car parking layout Except for these design changes in this application, the development is otherwise proposed to be carried out in accordance with the grant of permission 24-61311 including the requirements of the Ecological Impact Statement

Observations close 4 Jan 2027 39 days left
5 weeks from receipt (received 20 Nov 2026) · s.34 Planning and Development Act 2000 · art. 29 Regulations 2001 · fee €20 · council decision due 23 Jan 2027

The application

Reference
2661910 · full record
Authority
Galway County Council
Type
PERMISSION
Status
PRE_VALIDATION
Site area
1.04 ha
Received
20 Nov 2026
Decision due
23 Jan 2027

How to submit an observation

  1. Read the file on the council register.Drawings, planning statement and site notices are at http://www.eplanning.ie/GalwayCC/AppFileRefDetails/2661910/0.
  2. Write your observation.Quote 2661910 at the top, give your name and the address the authority should reply to, and confine it to planning matters — zoning objective, height, overlooking, traffic, drainage, heritage. What you say here is what you can later appeal on.
  3. Pay the €20 fee.Every submission needs it; without it the observation is invalid and is returned. Galway County Council takes it online with the submission or at the counter.
  4. Submit before 4 Jan 2027.Online through the register above, or in writing to the Planning Department, Galway County Council. The test is the date the authority receives it, not the date you post it.
  5. Keep the acknowledgement.The council's receipt is your proof of a valid observation — see below.

Statutory basis. Section 34(1) of the Planning and Development Act 2000 (as amended) requires a planning authority to consider any submission or observation made to it in accordance with the Regulations. Article 29 of the Planning and Development Regulations 2001 (as amended) sets the window: a submission or observation must be received by the authority within five weeks beginning on the date of receipt of the application, and must be accompanied by the prescribed fee of €20. A submission received after the window, or without the fee, is invalid and the authority must return it.

After you submit: keep the acknowledgement. Under the 2024 Act it secures your right to appeal — only the applicant and a person who made a valid observation may bring the council's decision to An Coimisiún Pleanála, within four weeks of the decision. Making a valid observation is also what buys a right of appeal: under s.37(1) of the 2000 Act, only the applicant and a person who made a valid submission or observation to the planning authority may appeal the decision to An Coimisiún Pleanála (within four weeks of the decision). Missing the five-week window closes both doors.

What the site is zoned

CodeObjectivePlanIn force
C2.1
Economic development and employment
Business & Enterprise: To provide for the development of business and enterprisegalway county development plan 2022 202820 Jun 2022 → 19 Jun 2028

An application that accords with the zoning objective is hard to resist on principle; one that does not may be a material contravention, which the council can only grant by the s.34(6) procedure with its own notice and window.

Source: Galway County Council development plan zoning · fetched 27 Sept 2026, 19:37
SourceLicenceFetchedLink
Galway County Council development plan zoning—27 Sept 2026, 19:37open

Nearby precedents within 500 m, last 5 years

Decisions

ReferenceDecisionDecidedUnitsDistanceDescription
2661226Conditional8 Sept 20261247 mfor construction of new dwelling with garage and treatment septic tank system. Along with shared vehicle access off the R381 Road and all associated site works
2660081Conditional18 Mar 20260 mfor change of design of the warehouse extension granted under planning permission 24-61311. The development will consist of a reduction in the floor area of the granted extension, a reduction of the mezzanine floor area, a reduction of the number of dock levellers and minor elevational changes. Except for these design changes in this application, the development is otherwise proposed to be carried out in accordance with the grant of permission 24-61311 including the requirements of the Ecological Impact Statement
2560189Conditional1 Apr 2025302 mof a prefabricated unit as a Clubhouse. Gross floor space of work to be retained: 72.82 sqm
2461713Conditional5 Feb 202512 mfor (A) rollover car wash facility and contingent site works. (B) retention of the changes made to the site layouts and building layouts approved under Reg Ref 12761; Reg Ref 17923 and Reg Ref 21183. The site changes include the installation and erection of the ESB Sub Station, EV charging points, laundry facilities, addition of AD blue + kerosene facilities and other contingent works. The building changes include the changes in elevational treatment and the fixing of the solar panels on the roof and other contingent works. Gross floor space of work to be retained: 540 sqm. Gross floor space of any demolition: 37 sqm
2461311Conditional28 Nov 20240 mfor the i) Provision of an extension to the rear of the existing building to provide for warehousing and logistics and which includes an internal mezzanine level for office, staff welfare and administration facilities; ii) Provision of a loading yard with 11 no. dock levellers, 1 no. ramped loading bay, 14 no. truck parking spaces, vehicle washdown facilities and 1 no. hydrocarbon interceptor; iii) The provision of a wastewater treatment unit and polishing filter; iv) Retention of 4 no. fire doors on the west and east elevations and 7 no. windows on west elevation of the existing building; v)The provision of 1 no. ESB Substation and vi) site landscaping, site lighting, signage, bike parking and all site development and enabling works. Gross floor space of proposed work: 5895 sqm
2460452Conditional18 Jun 202410 mfor: 1) alterations to the internal access road as permitted under PLRef 19/1232, 2) alterations to the loading yard as permitted under PL Ref 19/1232 (extended to 1,164m2 total area), 3) the provision of 4 No. loading docks to the north elevation of the existing building for the unloading and loading of goods, and 4) all associated site works
2361004Conditional9 Feb 2024302 mof a prefabricated unit as a clubhouse
2272Conditional19 Oct 202259 mchun (1) Athrú ar úsáid an Fhoirgnimh Haingear Aerárthaí go Stiúideo Scannán (2) Athrú ar úsáide an Fhoirgnimh Stáisiúin Dóiteáin atá ann cheana go dtí úsáid Oifige agus Ceardlainne coimhdeach leis an Stiúdeo Scannán. (3) Fáil réidh leis an dá (2) dhoras haingear atá ann cheana ar an taobh ó dheas den fhoirgneamh agus dhá (2) dhoras comhla rothlach a chur ina n-áit. (4) Athruithe a dhéanamh ar an taobh istigh den Fhorgneamh Haingear. (5) Sconsa agus geataí slándála 2.4m ar airde a thógáil mórthimpeall an imline. (6) Athruithe ar rochtain carrchlóis atá ann cheana, bacainní rochtana uathoibrithe agus oibreacha láithreáin gaolmhara a sholáthar. Spás urláir comhlán na n-oibreacha beartaithe: 3383.70 sqm

What has happened on this file

  • 20 Nov 2026 New application · observations close 4 Jan 2027