An bóthar buí , Carraroe , Co. Galway
Of a dwelling house and all ancillary works, on revised site boundaries
The application
- Reference
- 2661915 · full record
- Authority
- Galway County Council
- Type
- RETENTION
- Status
- PRE_VALIDATION
- Units
- 1
- Floor area
- 101 m²
- Site area
- 731 m²
- Received
- 20 Nov 2026
- Decision due
- 23 Jan 2027
How to submit an observation
- Read the file on the council register.Drawings, planning statement and site notices are at http://www.eplanning.ie/GalwayCC/AppFileRefDetails/2661915/0.
- Write your observation.Quote
2661915at the top, give your name and the address the authority should reply to, and confine it to planning matters — zoning objective, height, overlooking, traffic, drainage, heritage. What you say here is what you can later appeal on. - Pay the €20 fee.Every submission needs it; without it the observation is invalid and is returned. Galway County Council takes it online with the submission or at the counter.
- Submit before 4 Jan 2027.Online through the register above, or in writing to the Planning Department, Galway County Council. The test is the date the authority receives it, not the date you post it.
- Keep the acknowledgement.The council's receipt is your proof of a valid observation — see below.
Statutory basis. Section 34(1) of the Planning and Development Act 2000 (as amended) requires a planning authority to consider any submission or observation made to it in accordance with the Regulations. Article 29 of the Planning and Development Regulations 2001 (as amended) sets the window: a submission or observation must be received by the authority within five weeks beginning on the date of receipt of the application, and must be accompanied by the prescribed fee of €20. A submission received after the window, or without the fee, is invalid and the authority must return it.
What the site is zoned
| Code | Objective | Plan | In force |
|---|---|---|---|
| N1.5 Airport | Transport Infrastructure: Facilitate the provision and maintenance of essential transportation infrastructure | galway county development plan 2022 2028 | 20 Jun 2022 → 19 Jun 2028 |
An application that accords with the zoning objective is hard to resist on principle; one that does not may be a material contravention, which the council can only grant by the s.34(6) procedure with its own notice and window.
Source: Galway County Council development plan zoning · fetched 27 Sept 2026, 19:37
| Source | Licence | Fetched | Link |
|---|---|---|---|
| Galway County Council development plan zoning | — | 27 Sept 2026, 19:37 | open |
Nearby precedents within 500 m, last 5 years
Decisions
| Reference | Decision | Decided | Units | Distance | Description |
|---|---|---|---|---|---|
| 2661488 | Conditional | 15 Oct 2026 | 1 | 17 m | for a change of design to an extension to an existing house granted under planning reference 19/291 and all ancillary works |
| 2661016 | Conditional | 12 Aug 2026 | 1 | 273 m | chun athruithe a rinneadh ar plean an tí agus ar plean an gharáiste a choinneáil, chomh maith le leagan amach an suíomh agus an tírdhreachú a deonaíodh roimhe seo faoi Uimh. Thag. Pleanála 19/923, mar aon leis na seirbhísí láithreáin uile a bhaineann |
| 2660409 | Conditional | 20 Jul 2026 | 434 m | chun (a) seid na bhfear (Aonad 7) nua a thógáil, agus (b) ceangal a dhéanamh leis na seirbhísí eastáit reatha mar aon le hoibreacha & seirbhísí láithreáin eile gaolmhara a dhéanamh | |
| 2660543 | Conditional | 20 Jul 2026 | 437 m | chun tabhairt faoi fhorbairt a chuimseoidh athchóiriú agus athfhorbairt cuid dAonad 1, Eastáit Tionsclaíodh na Cheathrú Rua, Co. na Gaillimhe, mar giomnáisiam pobail (a bheidh oscailte 24 uair sa lá). Mar chuid den bhforbairt beartaithe déanfar síneadh leis an Ionad Cúram Leanaí atá ann cheanna féin a thógáil, a sholáthróidh spás breise chun freastal ar riachtanais reatha an Ionaid Cúraim Leanaí agus chun an t-uasmhéid gasúir gur féidir leis an ionad freastal orthu a mhéadú go 95. Tá an togra seo á chur chun cinn i gcomhpháirtíocht le Comharchumann Mhic Dara agus beidh leagan cuid den bhfoirgneamh reatha, tógáil síneadh nua ina áit – ag áireamh trealamh meicniúil, leictreach agus pluiméireachta chomh maith le painéil ghréine ar an díon san áireamh sna hoibreacha. Lena chois sin beidh méadú ar achar spraoi an Naíonra, athraithe ar an gcarrchlós, cosán coisithe nua, trasrian coisithe nua chomh maith le hoibreacha ginearálta suímh agus oibreacha draenála mar chuid dena hoibreacha forbartha | |
| 2561787 | Conditional | 4 Feb 2026 | 1 | 152 m | chun síneadh agus athraithe a dhéanamh le teach cónaithe |
| 2560383 | Conditional | 15 Oct 2025 | 298 m | Cead coinneála ar an díon nua, an dá shimléar atá leagtha; agus an dá fhuinneoig dín (veluxes) chun tosaigh a bhaineann le teach cónaithe | |
| 2560558 | Conditional | 6 Aug 2025 | 467 m | cead chun (a) cead coinneáill ar oibreacha atá déanta ar an suíomh (b)cead foirgneamh talamhaíochta agus oibreacha eile coimhdeacha a thógáil. Spás urláir comhlán na n-oibreacha beartaithe: 206 sqm | |
| 2461702 | Conditional | 1 Apr 2025 | 452 m | chun cead coinneáill (a) ar bhealach isteach chuig teach cónaithe (b) teach cónaithe (c) garáiste (d) córas searachais (e) ar theorainn nua suíomh |
Appeals
| ACP case | Type | Outcome | Decided | Distance |
|---|---|---|---|---|
| 314565 | Refused | 6 Dec 2023 | 309 m |
If neighbours here have appealed before and lost, the inspector's report on that case is the single most useful thing to read.
What has happened on this file
- 20 Nov 2026 New application · observations close 4 Jan 2027
- 20 Nov 2026 Decision
Generated from the Planning Register store; nothing was fetched live for this page. Source: national planning dataset, fetched 24 Nov 2026, 23:00. Not legal advice — confirm the deadline with Galway County Council before relying on it.