Church Road , Ballybunion , Co. Kerry
Extend their Caravan Park in order to accommodate additional mobile homes
The application
- Reference
- 26162 · full record
- Authority
- Kerry County Council
- Type
- PERMISSION
- Status
- PRE_VALIDATION
- Site area
- 9,397 m²
- Received
- 3 Nov 2026
- Decision due
- 6 Jan 2027
How to submit an observation
- Read the file on the council register.Drawings, planning statement and site notices are at http://www.eplanning.ie/KerryCC/AppFileRefDetails/26162/0.
- Write your observation.Quote
26162at the top, give your name and the address the authority should reply to, and confine it to planning matters — zoning objective, height, overlooking, traffic, drainage, heritage. What you say here is what you can later appeal on. - Pay the €20 fee.Every submission needs it; without it the observation is invalid and is returned. Kerry County Council takes it online with the submission or at the counter.
- Submit before 8 Dec 2026.Online through the register above, or in writing to the Planning Department, Kerry County Council. The test is the date the authority receives it, not the date you post it.
- Keep the acknowledgement.The council's receipt is your proof of a valid observation — see below.
Statutory basis. Section 34(1) of the Planning and Development Act 2000 (as amended) requires a planning authority to consider any submission or observation made to it in accordance with the Regulations. Article 29 of the Planning and Development Regulations 2001 (as amended) sets the window: a submission or observation must be received by the authority within five weeks beginning on the date of receipt of the application, and must be accompanied by the prescribed fee of €20. A submission received after the window, or without the fee, is invalid and the authority must return it.
Designations on or near the site within 100 m
- Recorded monument × 1R116940
Nearby precedents within 500 m, last 5 years
Decisions
| Reference | Decision | Decided | Units | Distance | Description |
|---|---|---|---|---|---|
| 2660828 | Conditional | 21 Oct 2026 | 452 m | three dwellings on three separate sites with individual vehicular entrances from Cliff Road and with 1 no. proposed single-storey dwelling at rear, accessed from Spraymount Road laneway to existing rear vehicular entrance to overall site, at Cliff Road, Ballybunion, Co. Kerry. | |
| 2660486 | Conditional | 24 Jul 2026 | 1 | 357 m | change of design to the single storey extension consisting of a pitched slated roof with an increased floor area from that previously granted planning permission under file Ref. No. 25/60485. There are no modifications to the entrance drive way as granted under the parent permission file Ref. 25/60485 |
| 2660175 | Conditional | 24 Apr 2026 | 434 m | permission to install a dormer window to the rear of her house | |
| 2560172 | Conditional | 6 Feb 2026 | 42 m | construct 27 no dwelling houses comprising 6 no. one bedroom houses, 2 no. two bedroom houses, 15 no. three bedroom house & 4no. four bedroom houses with new connections to the public foul, surface water and water mains with all necessary ancillary services | |
| 25277 | Conditional | 28 Jan 2026 | 170 m | (a) Retain granny annexe ancillary to the existing domestic dwelling house, as constructed with lean-to covered area for storage between rear wall of granny annexe and rear boundary wall and (b) Retain garden room ancillary to the existing domestic dwelling house as constructed, all structures to the rear of the existing dwelling house | |
| 2560485 | Conditional | 7 Jan 2026 | 357 m | (A) single storey extension to side (north elevation) of existing house, (B) Internal alterations to the existing house layout and (C) Upgrading of the existing vehicular entrance gateway and the construction of an access driveway to serve the house and all associated site works | |
| 2565 | Conditional | 19 Nov 2025 | 440 m | THE STAND-ALONE CLASSROOM BLOCK, RENOVATED CLASSROOM AND ASSOCIATED SITE WORKS | |
| 2560859 | Conditional | 17 Nov 2025 | 472 m | for Planning permission (1) to demolish existing domestic sheds as built (2) Planning permission to construct a new dwelling and domestic shed and all associated site works, at Dromin/Killehenny Ballybunion Co.Kerry . |
Appeals
| ACP case | Type | Outcome | Decided | Distance |
|---|---|---|---|---|
| 500366 | Refused | 19 Aug 2026 | 440 m | |
| 323645 | Refused | 19 Jan 2026 | 448 m | |
| 322674 | Granted with conditions | 25 Sept 2025 | 452 m | |
| 322558 | Granted with conditions | 26 Aug 2025 | 440 m | |
| 318800 | Granted with conditions | 4 Jun 2024 | 458 m | |
| 315408 | Granted with conditions | 24 Jan 2024 | 452 m |
If neighbours here have appealed before and lost, the inspector's report on that case is the single most useful thing to read.
What has happened on this file
- 3 Nov 2026 New application · observations close 8 Dec 2026
- 3 Nov 2026 Decision
Generated from the Planning Register store; nothing was fetched live for this page. Source: national planning dataset, fetched 11 Nov 2026, 23:00. Not legal advice — confirm the deadline with Kerry County Council before relying on it.