Observation pack · Kerry County Council

Moanmore , Tralee Road Castleisland , Co Kerry

Full planning permission to, A) Construct a new building consisting of a warehouse, offices, meetings rooms, B) Construct a free standing shed for storage, C) Develop a hard surfaced storage yard, complete with perimeter security fencing and associated equipment for plant and bulk stocks and all ancillary services.

Observations close 22 Sept 2026 window closed
5 weeks from receipt (received 18 Aug 2026) · s.34 Planning and Development Act 2000 · art. 29 Regulations 2001 · fee 20 · council decision due 12 Oct 2026

The five-week window has passed. Late observations are returned unread. If the council has decided, the next door is the appeal window — but under s.37 only the applicant and those who made a valid observation may appeal.

The application

Reference
2660771 · full record
Authority
Kerry County Council
Type
PERMISSION
Status
NEW APPLICATION
Applicant
not published by the national dataset — see the council register
Units
0
Floor area
Site area
8,520 m²
Received
18 Aug 2026
We first saw it
18 Sept 2026, 15:44
Decision due
12 Oct 2026
Decision
N/a

The national dataset truncates descriptions (80 characters for DLR, 70 for Fingal) and omits the applicant. The full description and the drawings are on the council register linked in step 1.

How to submit an observation

  1. Read the file on the council register.Drawings, planning statement and site notices are at http://www.eplanning.ie/KerryCC/AppFileRefDetails/2660771/0.
  2. Write your observation.Quote 2660771 at the top, give your name and the address the authority should reply to, and confine it to planning matters — zoning objective, height, overlooking, traffic, drainage, heritage. What you say here is what you can later appeal on.
  3. Pay the €20 fee.Every submission needs it; without it the observation is invalid and is returned. Kerry County Council takes it online with the submission or at the counter.
  4. Submit before 22 Sept 2026.Online through the register above, or in writing to the Planning Department, Kerry County Council. The test is the date the authority receives it, not the date you post it.
  5. Keep the acknowledgement.The council's receipt is your proof of a valid observation — see below.

Statutory basis. Section 34(1) of the Planning and Development Act 2000 (as amended) requires a planning authority to consider any submission or observation made to it in accordance with the Regulations. Article 29 of the Planning and Development Regulations 2001 (as amended) sets the window: a submission or observation must be received by the authority within five weeks beginning on the date of receipt of the application, and must be accompanied by the prescribed fee of €20. A submission received after the window, or without the fee, is invalid and the authority must return it.

After you submit: keep the acknowledgement. Under the 2024 Act it secures your right to appeal — only the applicant and a person who made a valid observation may bring the council's decision to An Coimisiún Pleanála, within four weeks of the decision. Making a valid observation is also what buys a right of appeal: under s.37(1) of the 2000 Act, only the applicant and a person who made a valid submission or observation to the planning authority may appeal the decision to An Coimisiún Pleanála (within four weeks of the decision). Missing the five-week window closes both doors.

What the site is zoned

No current zoning polygon covers this site in the store.

Designations on or near the site

Nothing designated within 100 m of the site.

Nearby precedents within 500 m, last 5 years

Decisions

ReferenceDecisionDecidedUnitsDistanceDescription
2560045Conditional27 Mar 20251108 m(A) Retention permission to retain existing temporary storage containers on site during construction period. (B) Permission to construct an external storage building ancillary to existing on site building with all associated site works and landscaping..
24361Conditional11 Dec 20240258 mCONSTRUCT A SINGLE STOREY BUILDING FOR THE MANUFACTURE OF COMPANY PRODUCTS AND ASSOCIATED SITE DEVELOPMENT WORKS
24317Conditional24 Sept 20241401 mTO CONSTRUCT A TWO-STOREY DWELLING HOUSE WITH ANCILLARY SITE DEVELOPMENT WORKS
24313Refused16 Sept 20240413 mto extend an existing single storey retail unit. This extension will consist of a new first floor living accommodation, and a rear ground and first floor extension to accommodate a new enclosed access stairs to the proposed first floor living accommodation. Including all associated ancillary site works.
2445Conditional27 Mar 2024036 mTO CONSTRUCT A FURNITURE WAREHOUSE WITH ANCILLARY SITE DEVELOPMENT WORKS
23941Conditional23 Oct 20230205 mRETAIN EXTENSION TO EXISTING PRINT/PAPER STORE (PREVIOUS REG 18/464) WITH ANCILLARY SITE DEVELOPMENT WORKS
236Conditional28 Apr 20230205 m(I) A WIND TURBINE WITH A HUB HEIGHT OF 40 METERS, A ROTOR DIAMETER OF 54 METERS AND AN OVERALL TIP HEIGHT OF 67 METRES; (II) WIND TURBINE FOUNDATION; (III) CRANE HARDSTANDING; (IV) ON-SITE ACCESS TRACK; (V) UNDERGROUND ELECTRICAL AND COMMUNICATIONS CABLES; AND (VI) ALL ASSOICATED AND ANCILLARY SITE DEVELOPMENT, ACCESS, LANDSCAPING, AND REINSTATMENT WORKS. THE OPERATIONAL LIFETIME OF THE PROPSED DEVELOPMENT IS 35 YEARS. THIS IS A 10 YEAR PLANNING PERMISSION
221179Conditional5 Apr 20230265 mRETAIN TEMPORARY CONSTRUCTION OF SITE ACCESS AND SITE ACCESS ROAD AS BUILT

Appeals

No appeals within 500 m in the last 5 years.

What has happened on this file

  • 18 Aug 2026 New application · observations close 22 Sept 2026
  • 18 Aug 2026 Decision

Generated from the Planning Register store; nothing was fetched live for this page. Source: national planning dataset, fetched 18 Sept 2026, 15:44. Not legal advice — confirm the deadline with Kerry County Council before relying on it.