Caher East , Kenmare , Co. Kerry
(a) Retention permission to retain alterations made to the existing dwelling house, (b) Retention permission to retain the existing dwelling house, all associated site services and ancillary site works as located within revised site boundaries, (c) permission to construct an extension to the existing dwelling house & make alterations to the existing dwelling house and all other associated works
The application
- Reference
- 2660943 · full record
- Authority
- Kerry County Council
- Type
- RETENTION
- Status
- NEW APPLICATION
- Applicant
- not published by the national dataset — see the council register
- Units
- 0
- Floor area
- —
- Site area
- 2,540 m²
- Received
- 29 Sept 2026
- We first saw it
- 14 Oct 2026, 01:45
- Decision due
- 23 Nov 2026
- Decision
- N/a
The national dataset truncates descriptions (80 characters for DLR, 70 for Fingal) and omits the applicant. The full description and the drawings are on the council register linked in step 1.
How to submit an observation
- Read the file on the council register.Drawings, planning statement and site notices are at http://www.eplanning.ie/KerryCC/AppFileRefDetails/2660943/0.
- Write your observation.Quote
2660943at the top, give your name and the address the authority should reply to, and confine it to planning matters — zoning objective, height, overlooking, traffic, drainage, heritage. What you say here is what you can later appeal on. - Pay the €20 fee.Every submission needs it; without it the observation is invalid and is returned. Kerry County Council takes it online with the submission or at the counter.
- Submit before 3 Nov 2026.Online through the register above, or in writing to the Planning Department, Kerry County Council. The test is the date the authority receives it, not the date you post it.
- Keep the acknowledgement.The council's receipt is your proof of a valid observation — see below.
Statutory basis. Section 34(1) of the Planning and Development Act 2000 (as amended) requires a planning authority to consider any submission or observation made to it in accordance with the Regulations. Article 29 of the Planning and Development Regulations 2001 (as amended) sets the window: a submission or observation must be received by the authority within five weeks beginning on the date of receipt of the application, and must be accompanied by the prescribed fee of €20. A submission received after the window, or without the fee, is invalid and the authority must return it.
What the site is zoned
No current zoning polygon covers this site in the store.
Designations on or near the site
Nothing designated within 100 m of the site.
Nearby precedents within 500 m, last 5 years
Decisions
| Reference | Decision | Decided | Units | Distance | Description |
|---|---|---|---|---|---|
| 2460889 | Conditional | 10 Mar 2025 | 1 | 382 m | • DEMOLITION OF THE EXISTING HOUSE • THE CONSTRUCTION OF A NEW TWO STOREY DWELLINGHOUSE IN A LOCATION BESIDE THE EXISTING HOUSE TO BE DEMOLISHED • INSTALLATION OF A TREATMENT UNIT AND GRAVITY SOIL POLISHING FILTER (PERCOLATION AREA) |
| 2460687 | Refused | 6 Nov 2024 | 1 | 382 m | • DEMOLITION OF THE EXISTING HOUSE • THE CONSTRUCTION OF A NEW TWO STOREY DWELLING HOUSE IN A LOCATION BESIDE THE EXISTING HOUSE TO BE DEMOLISHED • INSTALLATION OF A TREATMENT UNIT AND GRAVITY SOIL POLISHING FILTER (PERCOLATION AREA) |
| 23580 | Conditional | 10 May 2024 | 1 | 205 m | CONSTRUCTION OF A DORMER BUNGALOW, MECHANICAL TREATMENT UNIT AND POLISHNG FILTER AND ALL ANCILLARY SITE WORKS |
| 23951 | Conditional | 24 Oct 2023 | 1 | 0 m | CONSTRUCT AN AGRICULATURAL BUILDING FOR THE HOUSING OF CATTLE CONSISTING OF A SLATTED UNIT AND CREEP AREA LOCATED OVER AND UTILISING THE EXISTING REINFORCED CONCRETE EFFLUENT HOLDING TANK AND ALL OTHER ASSOCIATED WORKS |
| 221041 | Conditional | 28 Nov 2022 | 1 | 382 m | DEMOLITON OF THE EXISTING HOUSE, THE CONSTRUCTION OF A NEW TWO STOREY DWELLING HOUSE IN SAME LOCATION, INSTALLATION OF A TREATMENT UNIT AND A GRAVITY SOIL POLISHING FILTER (PERCOLATION AREA) |
| 21186 | Refused | 5 Nov 2021 | 1 | 383 m | (1) DEMOLISH EXISTING HOUSE, (2) CONSTRUCT A NEW TWO STOREY DWELLING HOUSE IN SAME LOCATION, (3) PERMISSION TO DECOMMISSION THE EXISTING SEPTIC TANK AND TO INSTALL A PROPRIETARY WASTEWATER TREATMENT SYSTEM AND ALL ASSOCIATED SITE WORKS |
Appeals
No appeals within 500 m in the last 5 years.
What has happened on this file
- 29 Sept 2026 New application · observations close 3 Nov 2026
- 29 Sept 2026 Decision
Generated from the Planning Register store; nothing was fetched live for this page. Source: national planning dataset, fetched 14 Oct 2026, 01:45. Not legal advice — confirm the deadline with Kerry County Council before relying on it.