BALLYLINE WEST , BALLYLINE , BALLYLONGFORD
Retention permission to retain Domestic garage, workshop and storage shed Domestic garden shed Kitchen/Dining area extension to house
The application
- Reference
- 2661070 · full record
- Authority
- Kerry County Council
- Type
- RETENTION
- Status
- NEW APPLICATION
- Site area
- 3,997 m²
- Received
- 30 Oct 2026
- Decision due
- 2 Jan 2027
How to submit an observation
- Read the file on the council register.Drawings, planning statement and site notices are at http://www.eplanning.ie/KerryCC/AppFileRefDetails/2661070/0.
- Write your observation.Quote
2661070at the top, give your name and the address the authority should reply to, and confine it to planning matters — zoning objective, height, overlooking, traffic, drainage, heritage. What you say here is what you can later appeal on. - Pay the €20 fee.Every submission needs it; without it the observation is invalid and is returned. Kerry County Council takes it online with the submission or at the counter.
- Submit before 4 Dec 2026.Online through the register above, or in writing to the Planning Department, Kerry County Council. The test is the date the authority receives it, not the date you post it.
- Keep the acknowledgement.The council's receipt is your proof of a valid observation — see below.
Statutory basis. Section 34(1) of the Planning and Development Act 2000 (as amended) requires a planning authority to consider any submission or observation made to it in accordance with the Regulations. Article 29 of the Planning and Development Regulations 2001 (as amended) sets the window: a submission or observation must be received by the authority within five weeks beginning on the date of receipt of the application, and must be accompanied by the prescribed fee of €20. A submission received after the window, or without the fee, is invalid and the authority must return it.
Nearby precedents within 500 m, last 5 years
Decisions
| Reference | Decision | Decided | Distance | Description |
|---|---|---|---|---|
| 2560684 | Refused | 30 Sept 2025 | 389 m | The Proposed Development will consist of a 10-year permission for a Solar PV Energy Development across a site of approximately 119.3 hectares. The development will comprise ground-mounted solar PV panels on steel support structures, transformers, internal access tracks, passing bays, crane pads, cable trenches, a permanent operational compound, temporary construction compounds, security fencing and gates, CCTV infrastructure, and all associated site and ancillary works. The proposal also includes a 33kV underground cable connecting to a consented grid node. This cable, which runs through the townlands of Ballyline West and Tullamore, is included for assessment purposes. Any necessary consents for this element will be sought separately, as required. A Natura Impact Statement has been submitted with this application. |
| 2360050 | Conditional | 23 Jan 2024 | 2 m | A new grid connection route connecting the permitted Ballylongford windfarm (Kerry County Council planning ref 19/381) ( An Bord Pleanala ref- PL08.304807) at Aghanagran Middle And Lower, Ballyline West And Tullahennel South, Ballylongford, to the proposed 38kVsubstation (Kerry County Council planning ref 23/431) at Tullamore, Listowel, Co Kerry. The route will entail the installation of approximately 7.3km of 38kv underground electric cable passing through townlands of Aghanagran Lower, Ballyline West, Kilgarvan, Coolkeragh, and Tullamore in County, Kerry The proposed grid route is proposed to be via underground cables located along the public roads : L10028, R552, and L-1009, and private property. The new grid route is a change a previously granted permission for a 12.1km grid connection route (Kerry County Council planning ref 20/438) ( An Bord Pleanala ref- PL08308643) from the permitted wind farm to the 38kva /110kva substation at Kilpaddoge, Tarbert. The proposal includes alterations to the permitted windfarm (Kerry County Council planning ref 19/381) ( An Bord Pleanala ref- PL08.304807), the permitted 38 kV substation at the wind farm is to be relocated and redesigned. The altered substation proposal will be located in a new substation compound that includes a control building, and all associated electrical plant and apparatus, fencing, and an access track within the townland of Aghanagran Lower. The proposed substation at the windfarm will be connected to the windfarm via underground cabling from Turbine T4. The project includes all ancillary and associated works necessary to facilitate the development, including three temporary construction compounds. A Natura Impact Statement has been prepared in respect of the proposed development and accompanies this application. |
Appeals
| ACP case | Type | Outcome | Decided | Distance |
|---|---|---|---|---|
| 500143 | pending | 24 Oct 2025 | 389 m | |
| 319081 | Invalid | 19 Feb 2024 | 2 m |
If neighbours here have appealed before and lost, the inspector's report on that case is the single most useful thing to read.
What has happened on this file
- 30 Oct 2026 New application · observations close 4 Dec 2026
- 30 Oct 2026 Decision
Generated from the Planning Register store; nothing was fetched live for this page. Source: national planning dataset, fetched 11 Nov 2026, 23:00. Not legal advice — confirm the deadline with Kerry County Council before relying on it.