PlanningRegister.ie
Observation pack · Kildare County Council

Alasty , Kill , Co.Kildare

for a single storey dwelling, double garage , waste water treatment bored well, improved entrance and all associated works.

Observations close 9 Nov 2026 14 days left
5 weeks from receipt (received 5 Oct 2026) · s.34 Planning and Development Act 2000 · art. 29 Regulations 2001 · fee €20

The application

Reference
26118 · full record
Authority
Kildare County Council
Type
PERMISSION
Status
INCOMPLETED APPLICATION
Applicant
not published by the national dataset — see the council register
Units
0
Floor area
—
Site area
6,634 m²
Received
5 Oct 2026
We first saw it
14 Oct 2026, 01:45
Decision due
—
Decision
N/a

The national dataset truncates descriptions (80 characters for DLR, 70 for Fingal) and omits the applicant. The full description and the drawings are on the council register linked in step 1.

How to submit an observation

  1. Read the file on the council register.Drawings, planning statement and site notices are at http://www.eplanning.ie/KildareCC/AppFileRefDetails/26118/0.
  2. Write your observation.Quote 26118 at the top, give your name and the address the authority should reply to, and confine it to planning matters — zoning objective, height, overlooking, traffic, drainage, heritage. What you say here is what you can later appeal on.
  3. Pay the €20 fee.Every submission needs it; without it the observation is invalid and is returned. Kildare County Council takes it online with the submission or at the counter.
  4. Submit before 9 Nov 2026.Online through the register above, or in writing to the Planning Department, Kildare County Council. The test is the date the authority receives it, not the date you post it.
  5. Keep the acknowledgement.The council's receipt is your proof of a valid observation — see below.

Statutory basis. Section 34(1) of the Planning and Development Act 2000 (as amended) requires a planning authority to consider any submission or observation made to it in accordance with the Regulations. Article 29 of the Planning and Development Regulations 2001 (as amended) sets the window: a submission or observation must be received by the authority within five weeks beginning on the date of receipt of the application, and must be accompanied by the prescribed fee of €20. A submission received after the window, or without the fee, is invalid and the authority must return it.

After you submit: keep the acknowledgement. Under the 2024 Act it secures your right to appeal — only the applicant and a person who made a valid observation may bring the council's decision to An Coimisiún Pleanála, within four weeks of the decision. Making a valid observation is also what buys a right of appeal: under s.37(1) of the 2000 Act, only the applicant and a person who made a valid submission or observation to the planning authority may appeal the decision to An Coimisiún Pleanála (within four weeks of the decision). Missing the five-week window closes both doors.

What the site is zoned

No current zoning polygon covers this site in the store.

Designations on or near the site

  • Radon risk area × 2
    About 1 in 10 homes in this area is likely to have high radon levels · About 1 in 20 homes in this area is likely to have high radon levels

Nearby precedents within 500 m, last 5 years

Decisions

ReferenceDecisionDecidedUnitsDistanceDescription
2561169Refused9 Dec 2025170 mthe construction of a part single & two-storey dwelling house and garage for domestic use, installation of a secondary wastewater treatment system, provision of a new recessed site entrance & driveway and all associated ancillary site development works above and below ground
2461013Refused29 Nov 2024170 mFor the construction of a part single & 2-storey dwelling house and garage for domestic use, installation of a secondary wastewater treatment system, provision of a new recessed site entrance & driveway and all associated ancillary site development works above and below ground.
23636Refused1 Aug 20231495 mthe erection of a single storey dwelling containing two bedrooms, a combined kitchen/dining/living area and sitting room, along with ancillary bathroom, hallway and utility accommodation, the installation of a wastewater treatment plant (Oakstown BAF) and percolation area, the construction of soakpits, the conversion of the existing agricultural entrance which presently serves this land into a domestic access, the construction of gates and gate piers, the provision of a driveway leading the public road to a detached double-garage, the creation of a connection to the public mains water supply and all associated landscaping, gardening and on-site works
221290Conditional8 Dec 20220373 mof single storey habitable extension (consisting of a playroom and dining room) to the east gable of the existing dwelling. Retention of velux windows on rear slope of existing roof which provide light to existing ground floor of existing dwelling
221232Conditional6 Dec 2022065 mto amend a previously approved development of 'a part single & two-storey farmhouse' approved under Planning Register Reference 22/268 at Killeenbeg, Kill, Co Kildare. Alterations to the single storey element will consist of a stone facade in lieu of napp plaster to the front (north) and end (west) elevations, revised window openings/positions to the front elevation and 2 number 'velux' type rooflights to the rear (south) elevation. Alterations to the two-storey element will consist of the provision of a ground floor corner window/door in lieu of 2 windows on the south & west elevations, provision of an additional first floor window and revised window openings/positions to the east elevation and all associated ancillary site development works
22770Refused17 Aug 202210 mthe erection of a new single storey detached dwelling, comprising 3 bedrooms, kitchen/dining room, familyroom, sitting room including sunroom, with ancillary bathrooms, dressing room, cloakroom, utility rooms and a detached domestic garage to the rear. The application also proposes the establishment of an equestrian business providing accommodation for injured horses and involves two new stable buildings which can together accommodate eighteen horses (including a veterinary inspection area and a dry goods store), an exercise paddock and a stable yard, as well as an equine waste storage facility. The development for which permission is sought also includes a wastewater treatment system and polishing filter, the closure of the existing agricultural access and the creation of a new entrance for both domestic and equestrian purposes onto the local Road L-2010-5 along with site works including a new driveway, front boundary treatment and all site landscaping
22268Conditional4 May 2022164 mthe construction of a part single & two-storey farmhouse to be connected to an existing secondary wastewater treatment system and accessed via an existing site entrance previously approved under Planning Register Reference 20/1265 and all associated ancillary site development works
211319Refused4 Nov 20210426 mfor a shed for the purposes of storing road sweeping vehicles and all ancillary site works

Appeals

ACP caseTypeOutcomeDecidedDistance
317880—Refused24 May 2024495 m

If neighbours here have appealed before and lost, the inspector's report on that case is the single most useful thing to read.

What has happened on this file

  • 5 Oct 2026 New application · observations close 9 Nov 2026
  • 5 Oct 2026 Decision

Generated from the Planning Register store; nothing was fetched live for this page. Source: national planning dataset, fetched 14 Oct 2026, 01:45. Not legal advice — confirm the deadline with Kildare County Council before relying on it.