PlanningRegister.ie
Observation pack · Kildare County Council

Tuckmilltown , Straffan , Co Kildare

planning permission to construct a 2 storey dwelling, double garage, waste water treatment system and raised percolation area, bored well, new entrance, general landscaping and all associated site works

Observations close 28 Sept 2026 6 days left
5 weeks from receipt (received 24 Aug 2026) · s.34 Planning and Development Act 2000 · art. 29 Regulations 2001 · fee 20 · council decision due 18 Oct 2026

The application

Reference
2660953 · full record
Authority
Kildare County Council
Type
PERMISSION
Status
NEW APPLICATION
Applicant
not published by the national dataset — see the council register
Units
0
Floor area
Site area
9,706 m²
Received
24 Aug 2026
We first saw it
18 Sept 2026, 16:04
Decision due
18 Oct 2026
Decision
N/a

The national dataset truncates descriptions (80 characters for DLR, 70 for Fingal) and omits the applicant. The full description and the drawings are on the council register linked in step 1.

How to submit an observation

  1. Read the file on the council register.Drawings, planning statement and site notices are at http://www.eplanning.ie/KildareCC/AppFileRefDetails/2660953/0.
  2. Write your observation.Quote 2660953 at the top, give your name and the address the authority should reply to, and confine it to planning matters — zoning objective, height, overlooking, traffic, drainage, heritage. What you say here is what you can later appeal on.
  3. Pay the €20 fee.Every submission needs it; without it the observation is invalid and is returned. Kildare County Council takes it online with the submission or at the counter.
  4. Submit before 28 Sept 2026.Online through the register above, or in writing to the Planning Department, Kildare County Council. The test is the date the authority receives it, not the date you post it.
  5. Keep the acknowledgement.The council's receipt is your proof of a valid observation — see below.

Statutory basis. Section 34(1) of the Planning and Development Act 2000 (as amended) requires a planning authority to consider any submission or observation made to it in accordance with the Regulations. Article 29 of the Planning and Development Regulations 2001 (as amended) sets the window: a submission or observation must be received by the authority within five weeks beginning on the date of receipt of the application, and must be accompanied by the prescribed fee of €20. A submission received after the window, or without the fee, is invalid and the authority must return it.

After you submit: keep the acknowledgement. Under the 2024 Act it secures your right to appeal — only the applicant and a person who made a valid observation may bring the council's decision to An Coimisiún Pleanála, within four weeks of the decision. Making a valid observation is also what buys a right of appeal: under s.37(1) of the 2000 Act, only the applicant and a person who made a valid submission or observation to the planning authority may appeal the decision to An Coimisiún Pleanála (within four weeks of the decision). Missing the five-week window closes both doors.

What the site is zoned

No current zoning polygon covers this site in the store.

Designations on or near the site

  • Radon risk area × 1
    About 1 in 20 homes in this area is likely to have high radon levels

Nearby precedents within 500 m, last 5 years

Decisions

ReferenceDecisionDecidedUnitsDistanceDescription
2561443Conditional30 Mar 20261223 mfor (a) As constructed single storey side extension to existing house and (b) As constructed stables and dungstead along with all associated site development works
2560733Conditional16 Feb 20260462 mfor (a) single storey detached barn style building, (b) landscaping, connection to all relevant site services and all associated development works
2560706Refused18 Aug 20251403 mfor building a two-storey dwelling serviced with an onsite waste water treatment system to current EPA guidelines, detached domestic garage, recessed entrance, and all associated site works
2560698Conditional14 Aug 20250184 mfor A) Alterations to the existing site entrance to provide a new alternative entrance to that proposed granted under the original permission No 19/548. The access to the existing dwelling will be via a right of way through the existing site owned by the applicant's parents. B) The retention of the relocated wastewater treatment system. Along with all facilitating and associated site development works
2461302Refused6 Feb 2025193 mto retain existing dwelling house and waste water treatment system and all other associated site development works
2461279Refused31 Jan 20251113 mfor retention permission to retain existing dwelling house and planning permission to install a waste water treatment system to serve the house and all other associated site development works
2461152Refused17 Dec 20240202 mfor a 152.2m 2 Workshop and storage building within an existing commercial yard along with all other associated site development works
2460993Refused25 Nov 20241404 mfor a two-storey dwelling serviced with an onsite waste water treatment system to current EPA guidelines, detached domestic garage, recessed entrance, and all associated site works

Appeals

ACP caseTypeOutcomeDecidedDistance
317471Refused12 Mar 202492 m

If neighbours here have appealed before and lost, the inspector's report on that case is the single most useful thing to read.

What has happened on this file

  • 24 Aug 2026 New application · observations close 28 Sept 2026
  • 24 Aug 2026 Decision

Generated from the Planning Register store; nothing was fetched live for this page. Source: national planning dataset, fetched 18 Sept 2026, 16:04. Not legal advice — confirm the deadline with Kildare County Council before relying on it.