PlanningRegister.ie
Observation pack · Kildare County Council

Moneycooly , Maynooth , Co. Kildare

planning permission to build a single storey dwelling and detached domestic garage to be accessed via the existing recessed entrance & driveway and for all associated site works including connecting to the mains foul sewer

Observations close 2 Oct 2026 7 days left
5 weeks from receipt (received 28 Aug 2026) · s.34 Planning and Development Act 2000 · art. 29 Regulations 2001 · fee €20 · council decision due 22 Oct 2026

The application

Reference
2660977 · full record
Authority
Kildare County Council
Type
PERMISSION
Status
NEW APPLICATION
Applicant
not published by the national dataset — see the council register
Units
0
Floor area
—
Site area
4,606 m²
Received
28 Aug 2026
We first saw it
18 Sept 2026, 16:04
Decision due
22 Oct 2026
Decision
N/a

The national dataset truncates descriptions (80 characters for DLR, 70 for Fingal) and omits the applicant. The full description and the drawings are on the council register linked in step 1.

How to submit an observation

  1. Read the file on the council register.Drawings, planning statement and site notices are at http://www.eplanning.ie/KildareCC/AppFileRefDetails/2660977/0.
  2. Write your observation.Quote 2660977 at the top, give your name and the address the authority should reply to, and confine it to planning matters — zoning objective, height, overlooking, traffic, drainage, heritage. What you say here is what you can later appeal on.
  3. Pay the €20 fee.Every submission needs it; without it the observation is invalid and is returned. Kildare County Council takes it online with the submission or at the counter.
  4. Submit before 2 Oct 2026.Online through the register above, or in writing to the Planning Department, Kildare County Council. The test is the date the authority receives it, not the date you post it.
  5. Keep the acknowledgement.The council's receipt is your proof of a valid observation — see below.

Statutory basis. Section 34(1) of the Planning and Development Act 2000 (as amended) requires a planning authority to consider any submission or observation made to it in accordance with the Regulations. Article 29 of the Planning and Development Regulations 2001 (as amended) sets the window: a submission or observation must be received by the authority within five weeks beginning on the date of receipt of the application, and must be accompanied by the prescribed fee of €20. A submission received after the window, or without the fee, is invalid and the authority must return it.

After you submit: keep the acknowledgement. Under the 2024 Act it secures your right to appeal — only the applicant and a person who made a valid observation may bring the council's decision to An Coimisiún Pleanála, within four weeks of the decision. Making a valid observation is also what buys a right of appeal: under s.37(1) of the 2000 Act, only the applicant and a person who made a valid submission or observation to the planning authority may appeal the decision to An Coimisiún Pleanála (within four weeks of the decision). Missing the five-week window closes both doors.

What the site is zoned

No current zoning polygon covers this site in the store.

Designations on or near the site

  • Radon risk area × 1
    About 1 in 20 homes in this area is likely to have high radon levels

Nearby precedents within 500 m, last 5 years

Decisions

ReferenceDecisionDecidedUnitsDistanceDescription
2660687Conditional17 Aug 20260465 mfor a change of use from storage to office accommodation for part of the ground floor and to construct additional first floor office accommodation within the existing storage unit
2660326Conditional21 May 20260220 merection of a shelter approximately 2.6m in height to serve an existing EV charging terminal
2560542Conditional15 Jul 20250368 mfor the training room to the rear of the ground floor, and the office space on the first floor at the front of the unit. Permission is also sought for a second training room to the rear of the ground floor and all ancillary site works
22686Conditional22 Sept 2022091 mdevelopment of this c0.708ha site at Maynooth Business Campus Development (Prev approved Reg Ref 99/2073), bounded by the M4 motorway to the north, Ballygoran Road to the south, existing Blocks A, B and C Maynooth Business Campus to the west and existing Block F to the east, existing access off the R406 Straffan Road, Maynooth, Co Kildare. The proposed development will consist a 4-storey office development with a setback top floor over basement car park providing for a GIFA of 12,656m2 excluding basement. The building is subdivisible into 4 office units, Units D1, D2, E1 and E2. The development is to be constructed in 2 phases, Phase 1 includes Block D1 and D2, Phase 2 includes Block E1 and E2. There are an additional 175 car parking spaces proposed (in addition to the previous allocation of 200 spaces for Block D and E under Reg Ref 99/2073), 127 of which are at basement level and 48 are at surface level. There are 253 bicycle spaces proposed in addition to an ESB substation and switch rooms, 2 no plant rooms at roof level, minor revisions to previously approved site and all associated site works above and below ground. (Planning permission was granted for a previously approved office development on this site under ABP-304658-19 – KCC 18/1382)

Appeals

No appeals within 500 m in the last 5 years.

What has happened on this file

  • 28 Aug 2026 New application · observations close 2 Oct 2026
  • 28 Aug 2026 Decision

Generated from the Planning Register store; nothing was fetched live for this page. Source: national planning dataset, fetched 18 Sept 2026, 16:04. Not legal advice — confirm the deadline with Kildare County Council before relying on it.