PlanningRegister.ie
Observation pack · Kildare County Council

36 The Avenue Newtown Manor , Kill , Co. Kildare

Attic conversion for storage purposes incorporating a raised gable to the side, rooflight to the front roof slope, dormer window to the rear roof slope, and new window opening to the side gable.

Observations close 6 Oct 2026 window closed
5 weeks from receipt (received 1 Sept 2026) · s.34 Planning and Development Act 2000 · art. 29 Regulations 2001 · fee €20 · council decision due 26 Oct 2026

The five-week window has passed. Late observations are returned unread. If the council has decided, the next door is the appeal window — but under s.37 only the applicant and those who made a valid observation may appeal.

The application

Reference
2660983 · full record
Authority
Kildare County Council
Type
PERMISSION
Status
NEW APPLICATION
Applicant
not published by the national dataset — see the council register
Units
0
Floor area
—
Site area
225 m²
Received
1 Sept 2026
We first saw it
18 Sept 2026, 16:04
Decision due
26 Oct 2026
Decision
N/a

The national dataset truncates descriptions (80 characters for DLR, 70 for Fingal) and omits the applicant. The full description and the drawings are on the council register linked in step 1.

How to submit an observation

  1. Read the file on the council register.Drawings, planning statement and site notices are at http://www.eplanning.ie/KildareCC/AppFileRefDetails/2660983/0.
  2. Write your observation.Quote 2660983 at the top, give your name and the address the authority should reply to, and confine it to planning matters — zoning objective, height, overlooking, traffic, drainage, heritage. What you say here is what you can later appeal on.
  3. Pay the €20 fee.Every submission needs it; without it the observation is invalid and is returned. Kildare County Council takes it online with the submission or at the counter.
  4. Submit before 6 Oct 2026.Online through the register above, or in writing to the Planning Department, Kildare County Council. The test is the date the authority receives it, not the date you post it.
  5. Keep the acknowledgement.The council's receipt is your proof of a valid observation — see below.

Statutory basis. Section 34(1) of the Planning and Development Act 2000 (as amended) requires a planning authority to consider any submission or observation made to it in accordance with the Regulations. Article 29 of the Planning and Development Regulations 2001 (as amended) sets the window: a submission or observation must be received by the authority within five weeks beginning on the date of receipt of the application, and must be accompanied by the prescribed fee of €20. A submission received after the window, or without the fee, is invalid and the authority must return it.

After you submit: keep the acknowledgement. Under the 2024 Act it secures your right to appeal — only the applicant and a person who made a valid observation may bring the council's decision to An Coimisiún Pleanála, within four weeks of the decision. Making a valid observation is also what buys a right of appeal: under s.37(1) of the 2000 Act, only the applicant and a person who made a valid submission or observation to the planning authority may appeal the decision to An Coimisiún Pleanála (within four weeks of the decision). Missing the five-week window closes both doors.

What the site is zoned

CodeObjectivePlanIn force
R2
Existing residential
Existing Residential / Infill: To protect and improve existing residential amenity, to provide for appropriate infill residential development and to provide for new and improved ancillary services.kildare county development plan 2023 2029 variation 3 kill27 Apr 2026 → 23 Mar 2029

An application that accords with the zoning objective is hard to resist on principle; one that does not may be a material contravention, which the council can only grant by the s.34(6) procedure with its own notice and window.

Source: Kildare County Council development plan zoning · fetched 27 Sept 2026, 19:37
SourceLicenceFetchedLink
Kildare County Council development plan zoning—27 Sept 2026, 19:37open

Designations on or near the site

  • Radon risk area × 1
    About 1 in 10 homes in this area is likely to have high radon levels

Nearby precedents within 500 m, last 5 years

Decisions

ReferenceDecisionDecidedUnitsDistanceDescription
2660252Conditional6 Oct 20260422 mchanges to site layout granted under Planning Ref: 20/1174 including realignment of the pedestrian link and all associated site works and services
2660795Conditional4 Sept 20260198 mDemolition of the existing front garden wall; Construction of a single-storey side extension with a clipped gable roof and a new garden gate to the side of the existing dwelling, including rooflights, internal alterations, and all associated site works.
25124Refused14 Jul 2026184 mfor a proposed detached dormer bungalow plus widening of existing vehicular entrance for the purpose of creating a shared vehicular entrance and all associated site works. Revised by Significant Further Information which consists of redesign of the proposed dwelling from a detached dormer bungalow to a two storey 2 bedroom dwelling plus creating a new vehicular entrance instead of a shared vehicular entrance as proposed originally
2660347Conditional22 May 20261457 mAs constructed 2 storey side extension to existing 2 storey house and all associated site development works
2633Conditional8 May 20260138 mFor (1) Construction of a single storey extension to front of the existing dwelling incorporating the existing garage to form an enlarged bedroom/ensuite and entrance hall, (2) widening f the existing drive way access to 6m wide and all associated site works.
2560256Conditional3 Mar 202610252 mfor the construction of 10 no. 4 bedroom, 2 storey, detached houses (8 no. Type A & 2 no. Type B) together with all associated ancillary on and off site development works, including outfall foul sewer, surface water disposal, watermain, road, footpath, landscaping, open space, boundary treatments and ancillary services to facilitate the development with vehicular and pedestrian access from Newtown Way distributor road on infill site of c. 0.48 Ha.
2660006Conditional25 Feb 20260375 mthe conversion of the existing front carport into a new entrance hall, the relocation of the entrance door to the front elevation, and the insertion of two new windows to the side elevation of the new entrance hall.
2561510Conditional25 Feb 20260364 mdomestic extensions and renovations to dwelling for the following elements: A. Rear single storey extension (36m2). B.First floor bedroom extension (11.5m2) to the front (South) and side (East) elevation. C. Elevational improvements including the application of external insulation with render finish to match existing, upgrading existing 3No. front elevation bay windows, dwelling window replacements and architectural feature details added throughout the elevations. D. Change of Use of existing detached Domestic Shed (currently 23m2 & 3.7m in height) to a Home-Gym, plus new extension to include a Domestic Garage (40m2), with the overall height of the completed structure (3.55m), located to the side (West) of the dwelling. E. Replacement of existing Domestic Shed (20m2) with new Boiler House and Home-Work Pod building (11.19m2) to the rear (North) of the dwelling. F. Associated Drainage and Roof alterations due to the above alterations including removal of disused chimney to dwelling. G. Removal of existing gate pier to facilitate widening site access and extend gate from 4.8m to 6m to enhance safe entry and exit. Plus, associated extension of dished kerbing at gate location

Appeals

ACP caseTypeOutcomeDecidedDistance
323111—Refused19 Nov 2025268 m
317722—Granted with conditions9 May 2024205 m
313932—Granted with conditions1 Nov 2022305 m
311556—Granted with conditions29 Apr 2022393 m
311271—Refused14 Feb 2022326 m
311173—Other8 Feb 2022455 m
310229—Other8 Dec 2021459 m

If neighbours here have appealed before and lost, the inspector's report on that case is the single most useful thing to read.

What has happened on this file

  • 1 Sept 2026 New application · observations close 6 Oct 2026
  • 1 Sept 2026 Decision

Generated from the Planning Register store; nothing was fetched live for this page. Source: national planning dataset, fetched 18 Sept 2026, 16:04. Not legal advice — confirm the deadline with Kildare County Council before relying on it.