PlanningRegister.ie
Observation pack · Kildare County Council

Lackagh Beg , Monasterevin , Co. Kildare

an extension to existing dwelling along with all associated site works

Observations close 14 Oct 2026 17 days left
5 weeks from receipt (received 9 Sept 2026) · s.34 Planning and Development Act 2000 · art. 29 Regulations 2001 · fee €20

The application

Reference
2661003 · full record
Authority
Kildare County Council
Type
PERMISSION
Status
INCOMPLETED APPLICATION
Applicant
not published by the national dataset — see the council register
Units
0
Floor area
—
Site area
2,421 m²
Received
9 Sept 2026
We first saw it
18 Sept 2026, 16:04
Decision due
—
Decision
N/a

The national dataset truncates descriptions (80 characters for DLR, 70 for Fingal) and omits the applicant. The full description and the drawings are on the council register linked in step 1.

How to submit an observation

  1. Read the file on the council register.Drawings, planning statement and site notices are at http://www.eplanning.ie/KildareCC/AppFileRefDetails/2661003/0.
  2. Write your observation.Quote 2661003 at the top, give your name and the address the authority should reply to, and confine it to planning matters — zoning objective, height, overlooking, traffic, drainage, heritage. What you say here is what you can later appeal on.
  3. Pay the €20 fee.Every submission needs it; without it the observation is invalid and is returned. Kildare County Council takes it online with the submission or at the counter.
  4. Submit before 14 Oct 2026.Online through the register above, or in writing to the Planning Department, Kildare County Council. The test is the date the authority receives it, not the date you post it.
  5. Keep the acknowledgement.The council's receipt is your proof of a valid observation — see below.

Statutory basis. Section 34(1) of the Planning and Development Act 2000 (as amended) requires a planning authority to consider any submission or observation made to it in accordance with the Regulations. Article 29 of the Planning and Development Regulations 2001 (as amended) sets the window: a submission or observation must be received by the authority within five weeks beginning on the date of receipt of the application, and must be accompanied by the prescribed fee of €20. A submission received after the window, or without the fee, is invalid and the authority must return it.

After you submit: keep the acknowledgement. Under the 2024 Act it secures your right to appeal — only the applicant and a person who made a valid observation may bring the council's decision to An Coimisiún Pleanála, within four weeks of the decision. Making a valid observation is also what buys a right of appeal: under s.37(1) of the 2000 Act, only the applicant and a person who made a valid submission or observation to the planning authority may appeal the decision to An Coimisiún Pleanála (within four weeks of the decision). Missing the five-week window closes both doors.

What the site is zoned

No current zoning polygon covers this site in the store.

Designations on or near the site

Nothing designated within 100 m of the site.

Nearby precedents within 500 m, last 5 years

Decisions

ReferenceDecisionDecidedUnitsDistanceDescription
2560571Conditional7 Jan 202600 mfor 1. Construction new single storey extension to side of existing dwelling, 2. Alterations to existing ground floor layout and elevations, 3. Construction of domestic garage to front of site, 4. Demolition of existing out-building, 5. Installation of new upgraded wastewater treatment system, 6. All associated site works
221328Conditional12 Apr 2023133 ma single storey dwelling, on site effluent treatment system and percolation area, surface water to soakaways, accessed via a recessed entrance and all associated site works
221118Conditional22 Feb 20230111 m(1) Construction of single storey extensions to rear of dwelling. (2) Conversion of attic space to habitable space including office, store and bedroom. (3) Minor alterations to all elevations and floor layout including new positions of windows and doors, additional rooflights, dormer window and reconfiguration of ground floor layout with new stairs to accommodate first floor conversion. (4) Construction of single storey domestic garage to front of site. (5) All ancillary site works. Revised by Significant Further Information which consists of (1) Decommissioning of existing septic tank and upgrade to new wastewater treatment system and soil polishing filter
211027Conditional21 Dec 20211486 mfor (1) retention of the existing 6sqm detached laundry room to the rear of the existing community dwelling. (2) Change of use of the existing domestic garage, currently used as a day room, to use a single occupancy community dwelling for a person with intellectual disabilities including alterations to the northwest and southwest elevations and a fenced private garden. (3) Any site works above and below ground associated with the above mentioned development

Appeals

No appeals within 500 m in the last 5 years.

What has happened on this file

  • 9 Sept 2026 New application · observations close 14 Oct 2026
  • 9 Sept 2026 Decision

Generated from the Planning Register store; nothing was fetched live for this page. Source: national planning dataset, fetched 18 Sept 2026, 16:04. Not legal advice — confirm the deadline with Kildare County Council before relying on it.