PlanningRegister.ie
Observation pack · Kildare County Council

Cuan Mhuire , Milltown , Athy Co. Kildare.

for demolition of existing glazed conservatory located at the rear elevation of the existing treatment unit building, demolition of existing entrance lobby located on the existing treatment unit front elevation & relocation of 3 No existing greenhouses situated in the curtilage of existing treatment unit building. Changes in design and layout to existing addiction treatment unit including construction of new single storey extension to the rear Western elevation of existing treatment unit building, construction of covered walkway to rear elevation of existing treatment unit building and construction of 2 no single storey 1-bedroom apartments at northern elevation of existing building Permission for elevational changes to all elevations of existing treatment unit building including construction of new single storey entrance lobby, installation of external insulation, application of new finishes including render and hardwood timber cladding, plus alterations to existing fenestration on selected elevations. Permission for the construction of new two storey building and glass link to the rear of existing treatment unit. The proposed new building will consist of Sitting Room, Dining Room, Kitchen, Toilet Facilities, Plantroom and Storeroom on the ground floor and provision of 7 No ensuite double bedrooms and 2 no ensuite single bedrooms for use of residents of treatment unit, together with connection to existing Public Sewers along with all other ancillary siteworks.

Observations close 21 Oct 2026 12 days left
5 weeks from receipt (received 16 Sept 2026) · s.34 Planning and Development Act 2000 · art. 29 Regulations 2001 · fee €20

The application

Reference
2661027 · full record
Authority
Kildare County Council
Type
PERMISSION
Status
INCOMPLETED APPLICATION
Applicant
not published by the national dataset — see the council register
Units
0
Floor area
—
Site area
8,147 m²
Received
16 Sept 2026
We first saw it
22 Sept 2026, 16:10
Decision due
—
Decision
N/a

The national dataset truncates descriptions (80 characters for DLR, 70 for Fingal) and omits the applicant. The full description and the drawings are on the council register linked in step 1.

How to submit an observation

  1. Read the file on the council register.Drawings, planning statement and site notices are at http://www.eplanning.ie/KildareCC/AppFileRefDetails/2661027/0.
  2. Write your observation.Quote 2661027 at the top, give your name and the address the authority should reply to, and confine it to planning matters — zoning objective, height, overlooking, traffic, drainage, heritage. What you say here is what you can later appeal on.
  3. Pay the €20 fee.Every submission needs it; without it the observation is invalid and is returned. Kildare County Council takes it online with the submission or at the counter.
  4. Submit before 21 Oct 2026.Online through the register above, or in writing to the Planning Department, Kildare County Council. The test is the date the authority receives it, not the date you post it.
  5. Keep the acknowledgement.The council's receipt is your proof of a valid observation — see below.

Statutory basis. Section 34(1) of the Planning and Development Act 2000 (as amended) requires a planning authority to consider any submission or observation made to it in accordance with the Regulations. Article 29 of the Planning and Development Regulations 2001 (as amended) sets the window: a submission or observation must be received by the authority within five weeks beginning on the date of receipt of the application, and must be accompanied by the prescribed fee of €20. A submission received after the window, or without the fee, is invalid and the authority must return it.

After you submit: keep the acknowledgement. Under the 2024 Act it secures your right to appeal — only the applicant and a person who made a valid observation may bring the council's decision to An Coimisiún Pleanála, within four weeks of the decision. Making a valid observation is also what buys a right of appeal: under s.37(1) of the 2000 Act, only the applicant and a person who made a valid submission or observation to the planning authority may appeal the decision to An Coimisiún Pleanála (within four weeks of the decision). Missing the five-week window closes both doors.

What the site is zoned

No current zoning polygon covers this site in the store.

Designations on or near the site

  • Natural Heritage Area (incl. proposed) × 1
    Grand Canal
  • Radon risk area × 1
    About 1 in 10 homes in this area is likely to have high radon levels

Nearby precedents within 500 m, last 5 years

Decisions

ReferenceDecisionDecidedUnitsDistanceDescription
2660345Conditional26 May 202619 mRetention permission to Retain Sunroom to the side of existing dwelling as constructed with all associated ancillary site works

Appeals

No appeals within 500 m in the last 5 years.

What has happened on this file

  • 16 Sept 2026 New application · observations close 21 Oct 2026
  • 16 Sept 2026 Decision

Generated from the Planning Register store; nothing was fetched live for this page. Source: national planning dataset, fetched 22 Sept 2026, 16:10. Not legal advice — confirm the deadline with Kildare County Council before relying on it.