Full planning for the following development construction of a single storey extension the side with a dormer extension to the rear with balcony along with a dormer extension at first floor level to the side and all associated site works at Kilteel upper, Kilteel, Co. Kildare.

Observations close 3 Nov 2026 10 days left
5 weeks from receipt (received 29 Sept 2026) · s.34 Planning and Development Act 2000 · art. 29 Regulations 2001 · fee €20 · council decision due 23 Nov 2026

The application

Reference
2661078 · full record
Authority
Kildare County Council
Type
PERMISSION
Status
NEW APPLICATION
Applicant
not published by the national dataset — see the council register
Units
0
Floor area
—
Site area
4,144 m²
Received
29 Sept 2026
We first saw it
7 Oct 2026, 01:19
Decision due
23 Nov 2026
Decision
N/a

The national dataset truncates descriptions (80 characters for DLR, 70 for Fingal) and omits the applicant. The full description and the drawings are on the council register linked in step 1.

How to submit an observation

  1. Read the file on the council register.Drawings, planning statement and site notices are at http://www.eplanning.ie/KildareCC/AppFileRefDetails/2661078/0.
  2. Write your observation.Quote 2661078 at the top, give your name and the address the authority should reply to, and confine it to planning matters — zoning objective, height, overlooking, traffic, drainage, heritage. What you say here is what you can later appeal on.
  3. Pay the €20 fee.Every submission needs it; without it the observation is invalid and is returned. Kildare County Council takes it online with the submission or at the counter.
  4. Submit before 3 Nov 2026.Online through the register above, or in writing to the Planning Department, Kildare County Council. The test is the date the authority receives it, not the date you post it.
  5. Keep the acknowledgement.The council's receipt is your proof of a valid observation — see below.

Statutory basis. Section 34(1) of the Planning and Development Act 2000 (as amended) requires a planning authority to consider any submission or observation made to it in accordance with the Regulations. Article 29 of the Planning and Development Regulations 2001 (as amended) sets the window: a submission or observation must be received by the authority within five weeks beginning on the date of receipt of the application, and must be accompanied by the prescribed fee of €20. A submission received after the window, or without the fee, is invalid and the authority must return it.

After you submit: keep the acknowledgement. Under the 2024 Act it secures your right to appeal — only the applicant and a person who made a valid observation may bring the council's decision to An Coimisiún Pleanála, within four weeks of the decision. Making a valid observation is also what buys a right of appeal: under s.37(1) of the 2000 Act, only the applicant and a person who made a valid submission or observation to the planning authority may appeal the decision to An Coimisiún Pleanála (within four weeks of the decision). Missing the five-week window closes both doors.

What the site is zoned

No current zoning polygon covers this site in the store.

Designations on or near the site

  • Radon risk area × 1
    About 1 in 10 homes in this area is likely to have high radon levels

Nearby precedents within 500 m, last 5 years

Decisions

ReferenceDecisionDecidedUnitsDistanceDescription
2360524Conditional4 Dec 20241407 mA. Removing existing blockwork from previously granted dwelling which was partially constructed, Constructing a new split level two storey dwelling, B. Constructing a single storey detached domestic garage and home office, C. New sewer connection to existing communal wastewater treatment system (Licence Ref. No. WP 218-05) D. New vehicular entrance, and associated site works
24167Conditional1 Aug 20240442 mfor planning permission for alternative house design to that permitted under planning ref: 19/535, connection to water mains, instillation of effluent disposal system to comply with current EPA requirements
2360399Conditional17 Jan 20241346 mfor a single storey dwelling with split floor levels to be serviced with sewer connection to existing communal wastewater treatment system (Licence Ref. No. WP 218-05), to provide entrance via existing service road, and associated siteworks. Note: This development was granted permission under PPRR 19/12
221326Conditional16 Oct 20231249 mconstructing a single storey with basement dwelling to be serviced with sewer connection to existing communal wastewater treatment system (Licence Ref. No. WP218-05), provide entrance via existing service road, and associated siteworks
2388Conditional12 May 20230422 ma single storey double garage with attic storage space of 47.5sqm, to the front and side of the existing property

Appeals

No appeals within 500 m in the last 5 years.

What has happened on this file

  • 29 Sept 2026 New application · observations close 3 Nov 2026
  • 29 Sept 2026 Decision

Generated from the Planning Register store; nothing was fetched live for this page. Source: national planning dataset, fetched 7 Oct 2026, 01:19. Not legal advice — confirm the deadline with Kildare County Council before relying on it.