PlanningRegister.ie
Observation pack · Kildare County Council

Hillview , Friarstown , Co. Kildare

THE REMOVAL OF CONDITION 3(B) ATTACHED TO PLANNING REGISTER REFERENCE 00/2165, INSOFAR AS IT REQUIRES THE EXISTING DWELLING KNOWN AS HILLVIEW TO BE OCCUPIED AND OPERATED AS A UNIT WITH THE OTHER DWELLING AND THE OVERALL BLOODSTOCK BUSINESS, AND RESTRICTS ITS SEPARATE SALE OR DISPOSAL.THE PROPOSED REMOVAL WILL FACILITATE THE SALE OF HILLVIEW AND ITS ASSOCIATED CURTILAGE INDEPENDENTLY OF THE OTHER DWELLING AND THE REMAINING LANDHOLDING AND CONTINUING BLOODSTOCK BUSINESS

Observations close 11 Nov 2026 12 days left
5 weeks from receipt (received 7 Oct 2026) · s.34 Planning and Development Act 2000 · art. 29 Regulations 2001 · fee €20 · council decision due 1 Dec 2026

The application

Reference
2661106 · full record
Authority
Kildare County Council
Type
PERMISSION
Status
NEW APPLICATION
Applicant
not published by the national dataset — see the council register
Units
0
Floor area
—
Site area
1,800 m²
Received
7 Oct 2026
We first saw it
14 Oct 2026, 01:45
Decision due
1 Dec 2026
Decision
N/a

The national dataset truncates descriptions (80 characters for DLR, 70 for Fingal) and omits the applicant. The full description and the drawings are on the council register linked in step 1.

How to submit an observation

  1. Read the file on the council register.Drawings, planning statement and site notices are at http://www.eplanning.ie/KildareCC/AppFileRefDetails/2661106/0.
  2. Write your observation.Quote 2661106 at the top, give your name and the address the authority should reply to, and confine it to planning matters — zoning objective, height, overlooking, traffic, drainage, heritage. What you say here is what you can later appeal on.
  3. Pay the €20 fee.Every submission needs it; without it the observation is invalid and is returned. Kildare County Council takes it online with the submission or at the counter.
  4. Submit before 11 Nov 2026.Online through the register above, or in writing to the Planning Department, Kildare County Council. The test is the date the authority receives it, not the date you post it.
  5. Keep the acknowledgement.The council's receipt is your proof of a valid observation — see below.

Statutory basis. Section 34(1) of the Planning and Development Act 2000 (as amended) requires a planning authority to consider any submission or observation made to it in accordance with the Regulations. Article 29 of the Planning and Development Regulations 2001 (as amended) sets the window: a submission or observation must be received by the authority within five weeks beginning on the date of receipt of the application, and must be accompanied by the prescribed fee of €20. A submission received after the window, or without the fee, is invalid and the authority must return it.

After you submit: keep the acknowledgement. Under the 2024 Act it secures your right to appeal — only the applicant and a person who made a valid observation may bring the council's decision to An Coimisiún Pleanála, within four weeks of the decision. Making a valid observation is also what buys a right of appeal: under s.37(1) of the 2000 Act, only the applicant and a person who made a valid submission or observation to the planning authority may appeal the decision to An Coimisiún Pleanála (within four weeks of the decision). Missing the five-week window closes both doors.

What the site is zoned

No current zoning polygon covers this site in the store.

Designations on or near the site

  • Radon risk area × 1
    About 1 in 10 homes in this area is likely to have high radon levels
  • Recorded monument × 1
    R147714

Nearby precedents within 500 m, last 5 years

Decisions

ReferenceDecisionDecidedUnitsDistanceDescription
2660277Conditional6 Jul 20260390 m(i) Construction of single storey extensions to side and rear of existing dwelling, (ii) Alterations to existing layouts and elevations, (iii) Conversion of existing attic space, to include an additional bedroom, (iv) Alterations and renovations to existing domestic garage to sub-divide existing space to form new home office & gym and separate garage space, (v) All associated and ancillary works. Revised by Significant Further Information which consists of: Retention of detached domestic garage as constructed on site and retention of upgraded of waste water treatment system
2660314Conditional18 May 202603 mclosing of existing vehicle entrance and provision of a new agricultural entrance along with all associated site development and facilitating works
2660291Conditional12 May 202610 m(a) single storey dwelling with attached garage as constructed, (b) relocation of vehicular entrance to main road, (c) revised site layout including site boundaries and position of dwelling on the subject site, landscaping, connection to all relevant existing site services and all associated development works.
2560310Conditional10 Nov 20250291 mfor an equine bloodstock breeding facility consisting of: A) Demolishing existing equine stables, single storey staff accommodation and outbuildings on site, B) Construction of 2 new equine barns that will provide for 24 stable units in each, C) Construction of a single storey building that will facilitate staff canteen, offices, viewing area, toilet facilities and associated car parking areas, D) Construction of staff accommodation in the form of 2 no. single storey detached units connected with a shared covered terrace with associated car parking areas, E) Construction of a farm managers house in the form of a part 2 storey, part single storey dwelling with an integrated double garage, F) Construction of 2 no. single storey isolation stable blocks, G) Construction of a fillies barn, H) Construction of a horse walker and horse lunging ring, I) Construction of a machinery shed and an agricultural shed for hay storage with ancillary manure pit, J) Construction of a horse loading bay and wash bay area, K) Installation of waste water treatment systems to cater for all residential and equine buildings, including the installation of underground tanks, L) Upgrade to existing vehicular entrance, M) Installation of a new well , N) Construction of internal access roads, additional car parking (including EV spaces), landscaping, boundary treatments, lighting and all ancillary site works. A Natura impact statement will be submitted to the planning authority.
23810Conditional17 Jan 20240157 ma new 38kV electricity circuit between the existing Kildare ESB substation and the existing Newbridge ESB substation County Kildare. The circuit will be c. 8.5km in length and will consist of c. 7km of overhead line (OHL) and c. 1.5km of underground cable (UGC). The OHL structures (48 No.) will consist of single and double wood polesets, with a height above ground level ranging from c. 9.7m to c. 18m and will require below ground foundations and staywires at specific locations. The UGC will primarily run along public roads and will consist of electrical cables laid in underground ducts buried in a trench (with varying dimensions between c.0.6m and c. 0.9m width and a depth of c.1.2m). Permission is sought for all associated works including temporary works such as the creation of access ways and ancillary temporary and permanent works. Revised by Significant further information which consists of Natura Impact Statement (NIS)

Appeals

ACP caseTypeOutcomeDecidedDistance
319002—Granted with conditions16 May 2025169 m

If neighbours here have appealed before and lost, the inspector's report on that case is the single most useful thing to read.

What has happened on this file

  • 7 Oct 2026 New application · observations close 11 Nov 2026
  • 7 Oct 2026 Decision

Generated from the Planning Register store; nothing was fetched live for this page. Source: national planning dataset, fetched 14 Oct 2026, 01:45. Not legal advice — confirm the deadline with Kildare County Council before relying on it.