Griffinrath , Celbridge , Co. Kildare.
Permission for a change of house type only on a permission granted to me under planning reference number 2561118. It is proposed to construct a traditional style 2 storey house. The house will be orientated with its front line parallel to the public road. All other aspects of the application to be as per granted under 2561118. All of the above on our site at Griffinrath, Celbridge, Co. Kildare
The application
- Reference
- 2661161 · full record
- Authority
- Kildare County Council
- Type
- PERMISSION
- Status
- NEW APPLICATION
- Site area
- 7,080 m²
- Received
- 20 Oct 2026
- Decision due
- 14 Dec 2026
How to submit an observation
- Read the file on the council register.Drawings, planning statement and site notices are at http://www.eplanning.ie/KildareCC/AppFileRefDetails/2661161/0.
- Write your observation.Quote
2661161at the top, give your name and the address the authority should reply to, and confine it to planning matters — zoning objective, height, overlooking, traffic, drainage, heritage. What you say here is what you can later appeal on. - Pay the €20 fee.Every submission needs it; without it the observation is invalid and is returned. Kildare County Council takes it online with the submission or at the counter.
- Submit before 24 Nov 2026.Online through the register above, or in writing to the Planning Department, Kildare County Council. The test is the date the authority receives it, not the date you post it.
- Keep the acknowledgement.The council's receipt is your proof of a valid observation — see below.
Statutory basis. Section 34(1) of the Planning and Development Act 2000 (as amended) requires a planning authority to consider any submission or observation made to it in accordance with the Regulations. Article 29 of the Planning and Development Regulations 2001 (as amended) sets the window: a submission or observation must be received by the authority within five weeks beginning on the date of receipt of the application, and must be accompanied by the prescribed fee of €20. A submission received after the window, or without the fee, is invalid and the authority must return it.
Designations on or near the site within 100 m
- Radon risk area × 1About 1 in 10 homes in this area is likely to have high radon levels
Nearby precedents within 500 m, last 5 years
Decisions
| Reference | Decision | Decided | Units | Distance | Description |
|---|---|---|---|---|---|
| 2561116 | Conditional | 18 Jun 2026 | 1 | 31 m | for a two storey house, septic tank and percolation area, combined recessed entrance and all associated siteworks |
| 2561117 | Conditional | 11 Jun 2026 | 1 | 0 m | for a two storey house, septic tank and percolation area, combined recessed entrance and all associated siteworks. Revised by Significant Further Information which consists of : New effluent treatment system and polishing filter to replace the proposed septic tank and percolation area |
| 2561118 | Conditional | 11 Jun 2026 | 1 | 0 m | for a two storey house, septic tank and percolation area, combined recessed entrance and all associated siteworks |
| 211256 | Conditional | 23 Mar 2022 | 251 m | application for a 10 year permission for development on lands in the townland of Griffinrath, Celbridge. The development will consist of the construction of a solar PV farm with an operational life of 35 years comprising approximately 75,984 No. photovoltaic panels on ground mounted frames within a site area of 44.21 hectares and associated ancillary development including 10 No. transformer stations, approximately 124 No. string-inverters, 1 No. onsite 38kV substation building, 1 No. 40ft storage container building, 7 No. CCTV security cameras mounted on 4 metre high poles and perimeter security fencing (2 metres high), the construction of an internal hardcore access road between the solar panels and the site access, localised improvements to an existing agricultural access from the adjoining L5065 road to facilitate construction and operational phase access and, the installation of a 38kV underground electricity cable from the onsite 38kV substation to the 110kV Griffinrath substation ca. 0.75km to the southeast. A Natura Impact Statement has been prepared in respect of the proposed development. Revised by Significant Further Information which consists of an Aviation Glint and Glare Assessment Report, an Archaeological Report ; an amended Noise and Vibration Impact Assessment; a Traffic Report; drawings of cable locations and trench reinstatement and road closures and road diversion routes; a Stage 1/2 Road Safety Audit; updated drawings of the existing and proposed entrance and the proposed compound and temporary set down area; and a risk assessment of the hazards associated with a fire in or near the solar arrays. |
Appeals
| ACP case | Type | Outcome | Decided | Distance |
|---|---|---|---|---|
| 313370 | Withdrawn | 25 May 2022 | 251 m | |
| 313332 | pending | 13 Apr 2022 | 251 m |
If neighbours here have appealed before and lost, the inspector's report on that case is the single most useful thing to read.
What has happened on this file
- 20 Oct 2026 New application · observations close 24 Nov 2026
- 20 Oct 2026 Decision