PlanningRegister.ie
Observation pack · Kildare County Council

Sherlockstown , Sallins , Co. Kildare

For the construction of a bungalow, domestic garage, secondary effluent treatment system, recessed entrance and all associated site works

Observations close 2 Dec 2026 20 days left
5 weeks from receipt (received 28 Oct 2026) · s.34 Planning and Development Act 2000 · art. 29 Regulations 2001 · fee €20 · council decision due 22 Dec 2026

The application

Reference
2661185 · full record
Authority
Kildare County Council
Type
PERMISSION
Status
NEW APPLICATION
Units
1
Floor area
203 m²
Site area
3,575 m²
Received
28 Oct 2026
Decision due
22 Dec 2026

How to submit an observation

  1. Read the file on the council register.Drawings, planning statement and site notices are at http://www.eplanning.ie/KildareCC/AppFileRefDetails/2661185/0.
  2. Write your observation.Quote 2661185 at the top, give your name and the address the authority should reply to, and confine it to planning matters — zoning objective, height, overlooking, traffic, drainage, heritage. What you say here is what you can later appeal on.
  3. Pay the €20 fee.Every submission needs it; without it the observation is invalid and is returned. Kildare County Council takes it online with the submission or at the counter.
  4. Submit before 2 Dec 2026.Online through the register above, or in writing to the Planning Department, Kildare County Council. The test is the date the authority receives it, not the date you post it.
  5. Keep the acknowledgement.The council's receipt is your proof of a valid observation — see below.

Statutory basis. Section 34(1) of the Planning and Development Act 2000 (as amended) requires a planning authority to consider any submission or observation made to it in accordance with the Regulations. Article 29 of the Planning and Development Regulations 2001 (as amended) sets the window: a submission or observation must be received by the authority within five weeks beginning on the date of receipt of the application, and must be accompanied by the prescribed fee of €20. A submission received after the window, or without the fee, is invalid and the authority must return it.

After you submit: keep the acknowledgement. Under the 2024 Act it secures your right to appeal — only the applicant and a person who made a valid observation may bring the council's decision to An Coimisiún Pleanála, within four weeks of the decision. Making a valid observation is also what buys a right of appeal: under s.37(1) of the 2000 Act, only the applicant and a person who made a valid submission or observation to the planning authority may appeal the decision to An Coimisiún Pleanála (within four weeks of the decision). Missing the five-week window closes both doors.

Designations on or near the site within 100 m

  • Radon risk area × 1
    About 1 in 20 homes in this area is likely to have high radon levels

Nearby precedents within 500 m, last 5 years

Decisions

ReferenceDecisionDecidedUnitsDistanceDescription
2660912Refused2 Oct 20260 m(A) new detached single storey dwelling house, (b) new on-site domestic wastewater treatment system, (c) upgraded access road extending to new recessed vehicular entrance, (d) landscaping about the subject site and all associated development works on lands
2660433Conditional12 Jun 202617 m(A) amendment of condition no.3 of planning file ref no. 05/2101 to remove sterilisation on a portion of the land to allow the erection of the proposed house.(B) construction of a single storey type house, (C) garage / store for domestic use, (D) the installation of an Oakstown BAF wastewater treatment system with polishing filter percolation area, and(E) new vehicular entrance gateway off the existing right of way avenue with improvement works to the existing driveway and all associated site works.
267Conditional9 Jun 202674 ma revised entrance and all associated works
2660081Refused25 Mar 20261197 m(A) New detached single storey dwelling house, (B) New on-site domestic wastewater treatment system, (C) Upgraded access road extending to new recessed vehicular entrance, (D) Landscaping about the subject site and all associated development works
2561174Refused8 Dec 20251198 mPermission for (a) new detached single storey dwelling house, (b) new on-site domestic wastewater treatment system, (c) upgraded access road extending to new recessed vehicular entrance, (d) new post and rail fence creating new site boundaries along with landscaping about the site and all associated development works on lands located
2560866Refused23 Sept 202510 mfor a one storey house, access road improvement works, effluent treatment system & polishing filter, recessed entrance and all associated site works
2560823Refused15 Sept 202517 mfor (A) construction of a single storey type house, (B) garage / store for domestic use, (C) the installation of an Oakstown BAF wastewater treatment system with polishing filter percolation area, and (D) new vehicular entrance gateway off the existing right of way avenue and all associated site works
23304Conditional17 May 2023148 mThe development will consist of: Retention permission is being sought for (a) The existing dwelling as-built (227.706 sqm), which includes some minor alterations to the original parent grant of planning permission Pl. Ref. No. 97/600; (b) The existing single storey low profile domestic shed No. 1 (16.991 sqm) to the north-east elevation of the existing dwelling; (c) The existing single storey low profile domestic gym (26.337 sqm) at the rear garden behind the existing dwelling, gym for homeowner use only; (d) The existing single storey low profile domestic shed No. 2 (8.754 sqm) to the rear of the exiting dwelling and (e) The existing single storey low profile "Gazebo" (9.6 sqm) to the rear of the existing dwelling. Planning permission is being sought for: (i) The construction of a new ground floor flat roofed extension, including balcony above, to the south-east rear corner of the dwelling; (ii) The construction of a new extension to the first floor roof accommodation to the south-west of the existing roof including modifications and addition of rooflights, all of above to include internal arrangement changes associated with the above to increase the floor area of the dwelling to 248.932 sqm; and (iii) Installation of a new proprietary waste water treatment system (8PE Plus Sepcon BAF) together with all associated landscaping, site works and services, all

Appeals

ACP caseTypeOutcomeDecidedDistance
502379open28 Oct 20260 m

If neighbours here have appealed before and lost, the inspector's report on that case is the single most useful thing to read.

What has happened on this file

  • 28 Oct 2026 New application · observations close 2 Dec 2026
  • 28 Oct 2026 Decision

Generated from the Planning Register store; nothing was fetched live for this page. Source: national planning dataset, fetched 3 Nov 2026, 23:01. Not legal advice — confirm the deadline with Kildare County Council before relying on it.