PlanningRegister.ie
Observation pack · Kildare County Council

Newhall , Ladytown , Naas

Storey and a half type dwelling, connection to mains sewer, modifications to existing site entrance, landscaping and all associated site development works

Observations close 7 Dec 2026 15 days left
5 weeks from receipt (received 31 Oct 2026) · s.34 Planning and Development Act 2000 · art. 29 Regulations 2001 · fee €20 · council decision due 3 Jan 2027

The application

Reference
2661202 · full record
Authority
Kildare County Council
Type
PERMISSION
Status
NEW APPLICATION
Units
1
Floor area
286 m²
Site area
1,735 m²
Received
31 Oct 2026
Decision due
3 Jan 2027

How to submit an observation

  1. Read the file on the council register.Drawings, planning statement and site notices are at http://www.eplanning.ie/KildareCC/AppFileRefDetails/2661202/0.
  2. Write your observation.Quote 2661202 at the top, give your name and the address the authority should reply to, and confine it to planning matters — zoning objective, height, overlooking, traffic, drainage, heritage. What you say here is what you can later appeal on.
  3. Pay the €20 fee.Every submission needs it; without it the observation is invalid and is returned. Kildare County Council takes it online with the submission or at the counter.
  4. Submit before 7 Dec 2026.Online through the register above, or in writing to the Planning Department, Kildare County Council. The test is the date the authority receives it, not the date you post it.
  5. Keep the acknowledgement.The council's receipt is your proof of a valid observation — see below.

Statutory basis. Section 34(1) of the Planning and Development Act 2000 (as amended) requires a planning authority to consider any submission or observation made to it in accordance with the Regulations. Article 29 of the Planning and Development Regulations 2001 (as amended) sets the window: a submission or observation must be received by the authority within five weeks beginning on the date of receipt of the application, and must be accompanied by the prescribed fee of €20. A submission received after the window, or without the fee, is invalid and the authority must return it.

After you submit: keep the acknowledgement. Under the 2024 Act it secures your right to appeal — only the applicant and a person who made a valid observation may bring the council's decision to An Coimisiún Pleanála, within four weeks of the decision. Making a valid observation is also what buys a right of appeal: under s.37(1) of the 2000 Act, only the applicant and a person who made a valid submission or observation to the planning authority may appeal the decision to An Coimisiún Pleanála (within four weeks of the decision). Missing the five-week window closes both doors.

What the site is zoned

CodeObjectivePlanIn force
C6
Waterfront
Industry and Warehousing: To provide for industry, manufacturing, distribution and warehousing.naas local area plan 2021 20271 Dec 2021 → 24 Jan 2028

An application that accords with the zoning objective is hard to resist on principle; one that does not may be a material contravention, which the council can only grant by the s.34(6) procedure with its own notice and window.

Source: Kildare County Council development plan zoning · fetched 27 Sept 2026, 19:37
SourceLicenceFetchedLink
Kildare County Council development plan zoning—27 Sept 2026, 19:37open

Designations on or near the site within 100 m

  • Radon risk area × 1
    About 1 in 10 homes in this area is likely to have high radon levels

Nearby precedents within 500 m, last 5 years

Decisions

ReferenceDecisionDecidedDistanceDescription
2660949Conditional15 Oct 202682 mthe construction of a single-storey EV forklift charging station to serve adjacent permitted warehouse facilities (Pl. Ref. 22/1340), with a total floor area of 81 sq.m, 4 no. EV forklift charging points, with external finishes to match warehouse building, and all ancillary site works
2561299Conditional8 May 202613 mthe provision of a truck wash including all associated infrastructure, and site and development works, and services
2561297Conditional14 Apr 2026359 mpermission for (A) Modifications to site access approved under Pl Ref No. 2460634 to include relocation of business park main access road and all associated site development works. (B) New internal access road to serve future development, outfall drains and all associated site development works. Revised by Significant Further Information which consists of: revised site access to that which was permitted under Reg. Ref. 24/60634
2561412Conditional30 Mar 2026442 mfor a motor sales and vehicle service facility located on a greenfield site of c.1.2 ha. The site is bounded by: the Bundle of Sticks Roundabout in the northeast; the R445 to the northwest; developed land in the southwest; and Local Road L6066 in the southeast. The development will consist of the provision of a building comprising a 1 and 2 storey motor sales showroom and a vehicle service garage / workshop (all with parts store, ancillary offices, staff and customer facilities and ancillary spaces) (and associated ancillary spaces) (c. 2,707 sq m) with a single storey web display and valet bay building (c. 170 sq m), all with a total gross floor area of c. 2,877 sq m.The development also includes the following signage: Northeast elevation: 2 no. illuminated suspended fascia signs (c. 4.14 sq m each), and 1 no. illuminated logo sign (c. 3.24 sq m); Northwest elevation: 2 no. illuminated logo signs (c. 3.24 sq m each), 1 no. illuminated location sign (c. 0.61 sq m), 1 no. logo and dealer sign (c. 1.56 sq m) and 1 no. glazed entrance manifestation sign (c. 2.07 sq m); Southeast Elevation: 1 no. illuminated dealer sign and with 1 no. illuminated logo sign (c. 0.94 sqm and 2.19 sq m, respectively); 4 no. free standing signs, comprising 1 no. single-sided partially illuminated façade screen sign (30.66 sq m), 1 no. double-sided partially illuminated totem sign (c. 31.42 sq m), 2 no. double-sided illuminated totem signs (c. 10.44 sq m and c. 1.62 sq m, respectively).The development will also comprise: a canopied car wash; a gated compound with bin storage, display podiums, staff and customer vehicular parking (including EV charging); Photovoltaic (PV) panels; service bays; new and used vehicle display and demonstration areas, vehicle storage, cycle parking, and landscaping; new vehicular and pedestrian entry / egress point on Local Road L6066; public footpath and bus stop to the R445; plant and pumping station; associated site servicing (foul and surface water drainage and water supply) and service connections, which includes the provision of surface water run-off discharge connection to the existing surface water sewer in the south and provision of a wastewater rising main to existing public sewer in the northeast; SUDs measures; lighting; hard and soft landscaping provision: boundary treatments: and all other site excavation and development works above and below ground
2561220Refused12 Dec 20250 mEntrance Works Piers & Wing Walls with Surfacing of land & Planning Permission for New Storage Shed & Front Boundary Wall with railing and all associated site works
2560745Conditional21 Nov 202555 mfor the first-floor mezzanine and associated internal alterations and associated site works. Retention of 7 No. windows to the south-west elevation. Planning permission is sought for 2 No. windows to the south-west elevation & 2 No. windows on the south-east elevation with internal alterations and associated site works
2560765Refused29 Aug 20250 mfor Entrance Works Piers & Wing Walls with Surfacing of land and all associated site works
2460787Conditional20 Aug 2025285 mfor a Data Centre and will comprise of: The demolition of 3 no. dwelling houses, associated garages and farm outbuildings / agricultural buildings (total floor area 1,591m2); The construction of 6 no. two storey data centre buildings, each with loading bays, external plant area including electrical and mechanical plant rooms, fuel compound, sprinkler tanks and associated ancillary development; Data centre building Nos. 1, 2, 3, 4 and 6 will consist of: a data hall (24,756m2, overall height 19m), an administration block (2,505m2 overall height 15m) and include an external screened plant area of 18m in height and 6,164m2; Gas turbines, gas engine and battery energy storage systems will be provided within each plant area; Data centre building No. 5 will consist of: a data hall (24,756m2, overall height 19m), an administration block (2,505m2 overall height 15m) and include an external screened plant area of 18m in height and 6,375m2 in area and includes infrastructure for district heating; Gas turbines, gas engine and battery energy storage systems will be provided within the plant area; Adjacent to each data centre building will be a screened sprinkler tank compound (408m2 to 528 m2 in area) comprising of 3 no. above ground sprinkler pump containers, (1 no. 240m3 and 2 no. 268.8m3 containers) and a screened fuel compound (331m2 in area) comprising 1 no. 38m3 fuel pump container and 6 no. 64m3 tanks; and Solar panels with a total area of 3,600m2 will be provided on the roof of each data centre building and rainwater harvesting is included in the development. The proposed development of the Data Centre also comprises: A screened Gas Networks Ireland (GNI) compound (61m2 in area) with 1 no. kiosk (3m in height and 19.5m2 in area) with a biomethane gas injection point; A screened above Ground Installation (AGI) compound (1,753m2 in area) with 4 no. kiosks each of 3m in height and 51.5 m2 in area; A district heating building (5m in height and 341m2 in area) district heating plant and in ground piping for district heating system; Security hub building (4.1m in height and 42m2 in area) at main entrance to the proposed development; A single storey admin workshop/office (504m2 in area) and water treatment plant (315m2 in area) building (4.8m in height) and associated hydrant pump room (5m in height and 80m2 in area) and 2 no. hydrant pump room storage tanks (5m in height and c.251m3 in area); A new access/egress from the R409 and a new emergency access/egress from th

Appeals

ACP caseTypeOutcomeDecidedDistance
323617Granted with conditions7 Jan 202612 m
323677pending16 Sept 2025285 m
322022Withdrawn8 Apr 202512 m
319228Granted13 Aug 202411 m

If neighbours here have appealed before and lost, the inspector's report on that case is the single most useful thing to read.

What has happened on this file

  • 31 Oct 2026 New application · observations close 7 Dec 2026
  • 31 Oct 2026 Decision

Generated from the Planning Register store; nothing was fetched live for this page. Source: national planning dataset, fetched 11 Nov 2026, 23:00. Not legal advice — confirm the deadline with Kildare County Council before relying on it.