PlanningRegister.ie
Observation pack · Kildare County Council

24 Oak Road , Connell Drive Newbridge , Co. Kildare

For an as-built detached metal domestic garden shed with an area of 32.0m2 constructed in the rear garden of the existing two storey dwelling, An as-built single storey domestic garage with an area of 14.0m2 constructed to the side of the existing two storey dwelling and All associated site development works

Observations close 15 Dec 2026 23 days left
5 weeks from receipt (received 10 Nov 2026) · s.34 Planning and Development Act 2000 · art. 29 Regulations 2001 · fee €20 · council decision due 13 Jan 2027

The application

Reference
2661239 · full record
Authority
Kildare County Council
Type
RETENTION
Status
NEW APPLICATION
Site area
239 m²
Received
10 Nov 2026
Decision due
13 Jan 2027

How to submit an observation

  1. Read the file on the council register.Drawings, planning statement and site notices are at http://www.eplanning.ie/KildareCC/AppFileRefDetails/2661239/0.
  2. Write your observation.Quote 2661239 at the top, give your name and the address the authority should reply to, and confine it to planning matters — zoning objective, height, overlooking, traffic, drainage, heritage. What you say here is what you can later appeal on.
  3. Pay the €20 fee.Every submission needs it; without it the observation is invalid and is returned. Kildare County Council takes it online with the submission or at the counter.
  4. Submit before 15 Dec 2026.Online through the register above, or in writing to the Planning Department, Kildare County Council. The test is the date the authority receives it, not the date you post it.
  5. Keep the acknowledgement.The council's receipt is your proof of a valid observation — see below.

Statutory basis. Section 34(1) of the Planning and Development Act 2000 (as amended) requires a planning authority to consider any submission or observation made to it in accordance with the Regulations. Article 29 of the Planning and Development Regulations 2001 (as amended) sets the window: a submission or observation must be received by the authority within five weeks beginning on the date of receipt of the application, and must be accompanied by the prescribed fee of €20. A submission received after the window, or without the fee, is invalid and the authority must return it.

After you submit: keep the acknowledgement. Under the 2024 Act it secures your right to appeal — only the applicant and a person who made a valid observation may bring the council's decision to An Coimisiún Pleanála, within four weeks of the decision. Making a valid observation is also what buys a right of appeal: under s.37(1) of the 2000 Act, only the applicant and a person who made a valid submission or observation to the planning authority may appeal the decision to An Coimisiún Pleanála (within four weeks of the decision). Missing the five-week window closes both doors.

What the site is zoned

CodeObjectivePlanIn force
R2
Existing residential
Existing Residential / Infill: To protect and enhance the amenity of established residential communities and promote sustainable intensification.kildare county development plan 2023 2029 newbridge settlement plan23 Feb 2026 → 23 Mar 2029

An application that accords with the zoning objective is hard to resist on principle; one that does not may be a material contravention, which the council can only grant by the s.34(6) procedure with its own notice and window.

Source: Kildare County Council development plan zoning · fetched 25 Oct 2026, 23:00
SourceLicenceFetchedLink
Kildare County Council development plan zoning—25 Oct 2026, 23:00open

Designations on or near the site within 100 m

  • Radon risk area × 1
    About 1 in 10 homes in this area is likely to have high radon levels

Nearby precedents within 500 m, last 5 years

Decisions

ReferenceDecisionDecidedDistanceDescription
2661026Conditional6 Nov 2026373 mthe extension and renovation of a detached bungalow comprising the demolition of a single-story side return located on the southeastern side of the property (24.1m²) and the construction of a new single story extension (39.66m²) to the southeast side of the existing property along with all associated drainage and site development works
2660988Conditional22 Oct 2026209 mwill consist of a new extension to existing Building 4. The development will consist of enclosing the existing ground floor, under the existing dust collector room, and all associated site works
2660933Refused8 Oct 2026493 mA) construction of 2 no. one bedroom apartments and 3 no. two bedroom apartments in 1 no. two storey block B) site development works on and below ground, including new access roadway, footpaths, car parking, landscaping, water network, foul and surface water drainage including surface water attenuation system, refuse storage areas, bicycle parking, and all associated site works and C) demolition of a circa 6.2sq.m of single storey garage attached to existing dwelling on site to allow access, ancillary alterations to front , side & rear elevations and all associated site works.
2660459Conditional11 Aug 2026125 mPlanning Permission for a one storey extension to the rear of a two storey semi-detached house, replace the ground floor pitched roof to the front, side and rear with a flat roof, demolish the semi-detached garage to the side, install new side gate and all associated site works.
2561479Conditional13 Apr 2026115 mfor A. change of use of existing single storey building to residential care home for children B. Planning permission sought for continuance and permanent use of existing single storey building to residential care home for children
2561414Conditional12 Feb 202652 m(a) permission to partially demolish a previously refused unauthorised detached domestic shed / home office and entertainment building located in the rear garden of an existing dwelling. Partial demolition proposals will reduce the building from 67 Sq/M to 39 Sq/M, and (b) retention permission sought for the revised / remaining domestic shed / home office and entertainment building for domestic use only and for the ancillary enjoyment of the existing dwelling, (c) landscaping, connection to all relevant existing site services and all associated development works
2560225Refused20 Nov 2025194 mfor construction of an apartment development consisting of 4 apartments (3 No two bedroom apartments and 1 no. one bedroom apartment), construction of a single storey detached bin and bicycle building, entrance, car parking and landscaping and all associated site works. Revised by Significant Further Information which consists of: Revised changes to the proposed development which now consists of permission for construction of an apartment development consisting of 4 apartments (3 No. two bedroom apartments and 1 No. one bedroom apartment), entrance, car parking and landscaping and all associated site works. The apartment development has been redesigned and relocated on site as a request for further information
2560127Conditional9 Jul 2025386 mThe development will take place on the existing sports playing fields, adjacent to the River Liffey, to the east and opposite side to the existing Newbridge College buildings/campus and will consist of the following: construction of 1no. new synthetic/all-weather floodlit hockey pitch and all associated siteworks (to replace an existing grit surfaced hockey pitch) including new 3m high perimeter fencing to sides of pitch with 3m high perimeter fencing plus 3m high ball stop netting (total 6m overall) to both ends of the hockey pitch plus the provision of 6no. new 18.3m high lighting columns with floodlights around the new pitch plus the provision of dug outs/player shelters, a viewing area with 1.2m high & 0.6m high spectator rail and storage containers to serve the new pitch, • the construction of 1no. new synthetic/all-weather floodlit rugby pitch and all associated siteworks (in place of part of an existing grit surfaced hockey pitch) including new 3m high perimeter fencing to sides of pitch with 3m high perimeter fencing plus 3m high ball stop netting (total 6m overall) to eastern perimeter of pitch, 3m high perimeter fencing plus 12m high ball stop netting (total 15m overall) to western perimeter of pitch adjacent to River Liffey plus the provision of 6no. new 18.3m high lighting columns with floodlights around the new pitch to serve the new rugby pitch and also floodlights on the same lighting columns to light the existing grass pitch adjacent to the new all-weather rugby pitch plus the provision of dug outs/player shelters, a spectator viewing area with tiered steps with 1.2m high & 0.6m high spectator rail at pitch edge and storage containers to serve the new pitch, • the construction of a new path from the end of the existing private bridge over the River Liffey to the pitches to include 8no. new 5m high lighting columns with lighting and all associated siteworks to facilitate access to the new all-weather pitches, • together with all associated development siteworks related to the entire development. Newbridge College is listed on the Record of Protected Structures in the Kildare County Development Plan 2023-2029

Appeals

ACP caseTypeOutcomeDecidedDistance
500467Refused13 Oct 2026194 m
319544Granted with conditions29 Oct 2024123 m
315551Refused30 Jan 2024175 m
315309Granted with conditions30 Jun 2023135 m

If neighbours here have appealed before and lost, the inspector's report on that case is the single most useful thing to read.

What has happened on this file

  • 10 Nov 2026 New application · observations close 15 Dec 2026
  • 10 Nov 2026 Decision

Generated from the Planning Register store; nothing was fetched live for this page. Source: national planning dataset, fetched 17 Nov 2026, 23:00. Not legal advice — confirm the deadline with Kildare County Council before relying on it.