Tully Road , Tully East , Kildare
The proposed green energy initiative development consisting of a ground mount installation of Photovoltaic Panels together with all associated site works
The application
- Reference
- 2661273 · full record
- Authority
- Kildare County Council
- Type
- PERMISSION
- Status
- INCOMPLETED APPLICATION
- Site area
- 1.56 ha
- Received
- 17 Nov 2026
How to submit an observation
- Read the file on the council register.Drawings, planning statement and site notices are at http://www.eplanning.ie/KildareCC/AppFileRefDetails/2661273/0.
- Write your observation.Quote
2661273at the top, give your name and the address the authority should reply to, and confine it to planning matters — zoning objective, height, overlooking, traffic, drainage, heritage. What you say here is what you can later appeal on. - Pay the €20 fee.Every submission needs it; without it the observation is invalid and is returned. Kildare County Council takes it online with the submission or at the counter.
- Submit before 22 Dec 2026.Online through the register above, or in writing to the Planning Department, Kildare County Council. The test is the date the authority receives it, not the date you post it.
- Keep the acknowledgement.The council's receipt is your proof of a valid observation — see below.
Statutory basis. Section 34(1) of the Planning and Development Act 2000 (as amended) requires a planning authority to consider any submission or observation made to it in accordance with the Regulations. Article 29 of the Planning and Development Regulations 2001 (as amended) sets the window: a submission or observation must be received by the authority within five weeks beginning on the date of receipt of the application, and must be accompanied by the prescribed fee of €20. A submission received after the window, or without the fee, is invalid and the authority must return it.
What the site is zoned
| Code | Objective | Plan | In force |
|---|---|---|---|
| C5 Commercial, enterprise and employment | National Stud and Green Belt: To protect and enhance the development of the Irish National Stud and established agricultural / bloodstock uses while also protecting the physical, environmental, natural and heritage resources such as the Curragh. | kildare town local area plan 2023 2029 | 6 Dec 2023 → 19 Dec 2029 |
| S5 Sustainable neighbourhood infrastructure | Community and Education: To provide for education, recreation, community and health | kildare town local area plan 2023 2029 | 6 Dec 2023 → 19 Dec 2029 |
An application that accords with the zoning objective is hard to resist on principle; one that does not may be a material contravention, which the council can only grant by the s.34(6) procedure with its own notice and window.
Source: Kildare County Council development plan zoning · fetched 27 Sept 2026, 19:37
| Source | Licence | Fetched | Link |
|---|---|---|---|
| Kildare County Council development plan zoning | — | 27 Sept 2026, 19:37 | open |
Designations on or near the site within 100 m
- Radon risk area × 1About 1 in 10 homes in this area is likely to have high radon levels
Nearby precedents within 500 m, last 5 years
Decisions
| Reference | Decision | Decided | Units | Distance | Description |
|---|---|---|---|---|---|
| 2660177 | Conditional | 16 Apr 2026 | 443 m | the construction of a single storey rear extension to end of terrace two storey (with attic conversion) house and all associated site works | |
| 2560009 | Conditional | 24 Oct 2025 | 13 | 439 m | for development on a site of approx. 0.387 ha. (The site is generally bounded by existing residential development at Oaktree Avenue to the north and east; Oaktree Road to the south; and an existing dwelling (R51 KR76) and Bride Street/Tully Road to the west and south west.) The proposed development shall consist of the following: The construction of 13 no. accessible age friendly residential units comprising 10 no. 1 bed houses (single storey in height) in a mix of semi-detached and terraced style units and 3 no. 2 bed houses (single storey in height) in the form of terrace style units; the provision of private open space for each residential unit in the form of side / rear gardens; and the provision of public open space to include the partial removal of an existing boundary wall to the east of the site to connect to the existing adjoining area of open space. The development will also provide for 13 no. car parking spaces (including 1 no. accessible space); vehicular and pedestrian access via Oaktree Road; additional pedestrian access to the adjacent site to the east; new footpaths and a pedestrian crossing at Oaktree Road to connect to existing pedestrian infrastructure; and all associated site development and infrastructure works providing for water, foul and surface water drainage and all associated connections, all landscaping, lighting and ancillary works |
| 25148 | Conditional | 23 Oct 2025 | 443 m | for dormer area development, comprising of 2 no bedrooms, stair well, bath room, landing and storage press | |
| 2460884 | Conditional | 30 Oct 2024 | 387 m | for non habitable storage space attic conversion with roof windows to front and rear | |
| 24193 | Conditional | 23 Jul 2024 | 420 m | for A. Attic conversion with 2 No'velux'rooflights to front elevation, B. All associated site works | |
| 2360134 | Conditional | 13 Oct 2023 | 445 m | a) The construction of ground and first floor extensions to the front, side and rear of the existing two storey dwelling totalling 45.5 m² broken down as follows: -Part single-storey part two-storey extension to the rear and side of the existing dwelling totaling 28 m² at ground floor level and 14.3 m² at first floor level; and -Proposed single storey porch extension to the front of the existing dwelling totaling 3.2 m². b) The conversion of the existing attic to habitable accommodation totalling 30.1 m². The attic accommodation will be accessed by a new stairs at first floor level. c) In addition to the proposed fenestration for the new extension works, new windows are proposed to the existing eastern-facing gable wall alongside new roof windows to the existing northern-facing roof. d) Proposed internal alterations to facilitate the proposed extension works and new internal layout. e) The proposed lowering of approximately a 6.5m length of existing brick-faced boundary wall to the eastern side of the existing dwelling—the first panel of the existing boundary wall is to be reduced by c. 0.975 m and the second panel is to be reduced by c. 1.2 m. The proposed reduction in wall height is to facilitate improved passive surveillance of the public realm and access to daylight and views for the proposed extension works. f) The proposed continuation of the existing low painted metal railing along the eastern boundary of the site to the southern and western property boundaries. A new electric gate is also proposed to the front (southern) elevation—the height and design is to match the existing and proposed painted metal railings. g) All associated site development works including connection to all existing services on site. | |
| 221150 | Conditional | 9 Nov 2022 | 443 m | (1) An attic conversion to comprise of two bedrooms with roof windows to the front and rear, move solar panels to allow for roof window. (2) A one storey extension to the rear and (3) A one storey porch to the front of a two storey, end of terrace house and all associated siteworks | |
| 22129 | Conditional | 29 Mar 2022 | 476 m | 1) an attic conversion to comprise of two bedrooms with roof windows to the front and rear, 2) a one storey extension to the side for storage purposes and 3) a one storey conservatory extension to the rear of a two storey semi detached house and all associated siteworks |
Appeals
| ACP case | Type | Outcome | Decided | Distance |
|---|---|---|---|---|
| 500289 | pending | 17 Nov 2025 | 439 m |
If neighbours here have appealed before and lost, the inspector's report on that case is the single most useful thing to read.
What has happened on this file
- 17 Nov 2026 New application · observations close 22 Dec 2026
- 17 Nov 2026 Decision
Generated from the Planning Register store; nothing was fetched live for this page. Source: national planning dataset, fetched 24 Nov 2026, 23:00. Not legal advice — confirm the deadline with Kildare County Council before relying on it.