Jamestown , Piltown , Kilkenny
for the construction a new single-storey dwelling with detached single-storey domestic garage, new site entrance, new wastewater treatment system and all associated site development works
The five-week window has passed. Late observations are returned unread. If the council has decided, the next door is the appeal window — but under s.37 only the applicant and those who made a valid observation may appeal.
The application
- Reference
- 2660534 · full record
- Authority
- Kilkenny County Council
- Type
- PERMISSION
- Status
- FURTHER INFORMATION
- Applicant
- not published by the national dataset — see the council register
- Units
- 1
- Floor area
- 196 m²
- Site area
- 3,827 m²
- Received
- 24 Aug 2026
- We first saw it
- 21 Oct 2026, 02:10
- Decision due
- —
- Decision
- N/a
The national dataset truncates descriptions (80 characters for DLR, 70 for Fingal) and omits the applicant. The full description and the drawings are on the council register linked in step 1.
How to submit an observation
- Read the file on the council register.Drawings, planning statement and site notices are at http://www.eplanning.ie/KilkennyCC/AppFileRefDetails/2660534/0.
- Write your observation.Quote
2660534at the top, give your name and the address the authority should reply to, and confine it to planning matters — zoning objective, height, overlooking, traffic, drainage, heritage. What you say here is what you can later appeal on. - Pay the €20 fee.Every submission needs it; without it the observation is invalid and is returned. Kilkenny County Council takes it online with the submission or at the counter.
- Submit before 28 Sept 2026.Online through the register above, or in writing to the Planning Department, Kilkenny County Council. The test is the date the authority receives it, not the date you post it.
- Keep the acknowledgement.The council's receipt is your proof of a valid observation — see below.
Statutory basis. Section 34(1) of the Planning and Development Act 2000 (as amended) requires a planning authority to consider any submission or observation made to it in accordance with the Regulations. Article 29 of the Planning and Development Regulations 2001 (as amended) sets the window: a submission or observation must be received by the authority within five weeks beginning on the date of receipt of the application, and must be accompanied by the prescribed fee of €20. A submission received after the window, or without the fee, is invalid and the authority must return it.
What the site is zoned
No current zoning polygon covers this site in the store.
Designations on or near the site
- Radon risk area × 1About 1 in 10 homes in this area is likely to have high radon levels
- Recorded monument × 5Castle - unclassified · Settlement deserted - medieval · Fulacht fia
Nearby precedents within 500 m, last 5 years
Decisions
| Reference | Decision | Decided | Units | Distance | Description |
|---|---|---|---|---|---|
| 2660342 | Conditional | 28 Jul 2026 | 0 | 104 m | to construct a New Domestic Garage/Storage Shed, and all associated works. |
| 2560594 | Conditional | 7 Nov 2025 | 0 | 237 m | for (i) A new above-ground, treated water service tank with a usable storage capacity of 722 M3 with an overall height of 6.4m (5.3m without safety railings) including: a) Concrete tank; b) Duel compartment; c) Connection pipework; d) Scour and overflow pipework; e) Dechlorination chamber; f) Handrailing and access staircase; (ii) Ancillary works, including: (a) Associated ground works; (b) Vehicle access track, security gate, footpaths, and vehicle turning Below-ground dechlorination chamber; (c) Mechanical and electrical service connections; (d) Modifications to the existing electrical control system to support new works; (e) Extension to the existing high fence around the existing storage site, to incorporate the expanded site; (iii) Solar PV panels to area; to be mounted on the new service reservoir roof slab (static and south-west facing); (iv) Associated temporary works including temporary compound area for the construction period; (v) Associated works including landscaping and biodiversity net gain. There are no demolition works proposed as part of this Project. In addition, a Landscaping and Biodiversity Net Gain (BNG) Plan has been prepared as part of the proposed development. Refer to Volume 2, Drawing No. 20788-NOD-04-XX-DR-C08015 for a copy of the Landscape Plan. Planting shall commence in the first planting season following commencement of development on the site |
| 2360013 | Conditional | 4 Jan 2024 | 0 | 118 m | for construction of a new two storey extension to the rear of my existing single storey dwelling, demolition of two previous extensions and associated making good of the existing building following demolitions, design changes to the existing building facades + retention of existing domestic garage and all associated works |
Appeals
No appeals within 500 m in the last 5 years.
What has happened on this file
- 24 Aug 2026 New application · observations close 28 Sept 2026
- 24 Aug 2026 Decision
- 15 Oct 2026 Further information requested
Generated from the Planning Register store; nothing was fetched live for this page. Source: national planning dataset, fetched 21 Oct 2026, 02:10. Not legal advice — confirm the deadline with Kilkenny County Council before relying on it.