PlanningRegister.ie
Observation pack · Kilkenny County Council

Moneenroe , Castlecomer , Co Kilkenny

to construct a single-storey family flat extension to the front of the existing dwelling, together with all associated site works

Observations close 30 Oct 2026 12 days left
5 weeks from receipt (received 25 Sept 2026) · s.34 Planning and Development Act 2000 · art. 29 Regulations 2001 · fee €20 · council decision due 19 Nov 2026

The application

Reference
2660619 · full record
Authority
Kilkenny County Council
Type
PERMISSION
Status
NEW APPLICATION
Applicant
not published by the national dataset — see the council register
Units
0
Floor area
—
Site area
1,744 m²
Received
25 Sept 2026
We first saw it
30 Sept 2026, 23:22
Decision due
19 Nov 2026
Decision
N/a

The national dataset truncates descriptions (80 characters for DLR, 70 for Fingal) and omits the applicant. The full description and the drawings are on the council register linked in step 1.

How to submit an observation

  1. Read the file on the council register.Drawings, planning statement and site notices are at http://www.eplanning.ie/KilkennyCC/AppFileRefDetails/2660619/0.
  2. Write your observation.Quote 2660619 at the top, give your name and the address the authority should reply to, and confine it to planning matters — zoning objective, height, overlooking, traffic, drainage, heritage. What you say here is what you can later appeal on.
  3. Pay the €20 fee.Every submission needs it; without it the observation is invalid and is returned. Kilkenny County Council takes it online with the submission or at the counter.
  4. Submit before 30 Oct 2026.Online through the register above, or in writing to the Planning Department, Kilkenny County Council. The test is the date the authority receives it, not the date you post it.
  5. Keep the acknowledgement.The council's receipt is your proof of a valid observation — see below.

Statutory basis. Section 34(1) of the Planning and Development Act 2000 (as amended) requires a planning authority to consider any submission or observation made to it in accordance with the Regulations. Article 29 of the Planning and Development Regulations 2001 (as amended) sets the window: a submission or observation must be received by the authority within five weeks beginning on the date of receipt of the application, and must be accompanied by the prescribed fee of €20. A submission received after the window, or without the fee, is invalid and the authority must return it.

After you submit: keep the acknowledgement. Under the 2024 Act it secures your right to appeal — only the applicant and a person who made a valid observation may bring the council's decision to An Coimisiún Pleanála, within four weeks of the decision. Making a valid observation is also what buys a right of appeal: under s.37(1) of the 2000 Act, only the applicant and a person who made a valid submission or observation to the planning authority may appeal the decision to An Coimisiún Pleanála (within four weeks of the decision). Missing the five-week window closes both doors.

What the site is zoned

No current zoning polygon covers this site in the store.

Designations on or near the site

Nothing designated within 100 m of the site.

Nearby precedents within 500 m, last 5 years

Decisions

ReferenceDecisionDecidedUnitsDistanceDescription
2660510Conditional8 Oct 20260325 mto construct a single storey family flat extension to the side and rear of our existing dwelling, permission for the installation of a new wastewater treatment area and all associated site works
2660056Conditional25 Mar 20260467 mfor Planning Permission for (1) a change of use of part of our existing clubhouse building to community use to create an activity/recreational room, acc. wc and ancillary areas (2) extension to the rear of the existing clubhouse building for a community shop (3) a new standalone single storey changing room building comprising of 2 no. changing rooms, toilet and showering facilities, an accessible changing room, referees room, physio room and all associated site works at Railyard Gaelic Football Club, Moneenroe, Castlecomer, Co. Kilkenny, R95 KD5C.
2560673Conditional10 Dec 2025071 mfor 1) Extension to the side of existing dwelling (alterations to plans approved under Planning Register Number 415/89). 2) Garage / Store extension to existing outbuilding including new roof over and all associated site works.
2560267Conditional30 Sept 20250253 mfor demolition of existing derelict extensions to the rear of the building and construction of single storey extension to rear of existing dwelling consisting of living accommodation, bedrooms and bathroom accommodation, and permission to upgrade of foul effluent treatment system, and all associated site works
2560317Conditional26 Sept 20250467 mfor the construction of an astroturf playing pitch, perimeter fencing, flood lighting and all associated site works
2460210Refused10 Mar 20250488 mfor development. The development will consist of: (i) All works (within County Kilkenny) associated with the connection of the proposed Seskin Wind Farm to the national electricity grid, via underground 38kV electrical cabling within the public road corridor to the existing Kilkenny 110kV substation; (ii) Provision of 16 no. joint bays, communication chambers and earth sheath links along the underground electrical cabling route; (iii) Reinstatement of the road and track surfaces above cabling trench along existing roads and tracks; (iv) Carriageway strengthening works at ‘Black Bridge’ on the L1835 / L3037 (Protected Structure RPS Ref. D84); (v) A new temporary access road off the N78 to the L30372 in the townlands of Cloneen, Co. Kilkenny to facilitate the delivery of turbine components and other abnormal loads; (vi) All ancillary apparatus and site development works above and below ground.
2360540Conditional26 Feb 20241415 mfor construction of a one and a half storey dwelling house, domestic garage/store, entrance, foul effluent treatment system and percolation area and all associated site works
2360332Refused14 Sept 20231203 mfor the formation of two new vehicular entrances and access roads; the construction of ten detached dwellings in two clusters with a pedestrian link comprising five no. single-storey three-bedroom units, four no. two-storey four-bedroom units and one number single-storey five-bedroom Group Home unit, and the provision of landscaping, including boundary treatments; and the provision of all other associated site excavation, infrastructural and site development works above and below ground including two wells

Appeals

ACP caseTypeOutcomeDecidedDistance
322225—Granted with conditions27 Nov 2025488 m
315365—Granted with conditions21 Nov 2023479 m

If neighbours here have appealed before and lost, the inspector's report on that case is the single most useful thing to read.

What has happened on this file

  • 25 Sept 2026 New application · observations close 30 Oct 2026
  • 25 Sept 2026 Decision

Generated from the Planning Register store; nothing was fetched live for this page. Source: national planning dataset, fetched 30 Sept 2026, 23:22. Not legal advice — confirm the deadline with Kilkenny County Council before relying on it.