Observation pack · Kilkenny County Council

Tirlán Limited , Belview Science & Technology Park , Belview Slieverue

For a 10-year planning permission for a relevant solar energy development consisting of the installation of a ground-mounted solar photovoltaic plant with an approximate capacity of 1.87 MWp DC and a grid connection capacity of approximately 1.56 MW AC. The proposed development will include approximately 2,592 photovoltaic modules installed on fixed mounting structures supported by a driven pile system. The development will also comprise underground direct current and alternating current cabling, string combiner boxes, inverters, a transformer, perimeter security fencing with wildlife access points, CCTV cameras where required, associated drainage measures and all associated civil and site development works. The grid connection will be made via underground cabling to the existing on-site substation located to the southeast of the solar photovoltaic installation. The development will also include the continued use of the existing construction compound, throughout the construction and operational lifespan of the solar photovoltaic development. Upon cessation of the permitted use, the solar photovoltaic development, its associated infrastructure and the construction compound will be removed, and the affected lands will be reinstated. The Tirlán site currently operates under Industrial Emissions Licence Register No. P0963-02 and Greenhouse Gas Emissions Permit No. IE-GHG175-03. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413), and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply

Observations close 27 Nov 2026 3 days left
5 weeks from receipt (received 23 Oct 2026) · s.34 Planning and Development Act 2000 · art. 29 Regulations 2001 · fee €20

The application

Reference
2660676 · full record
Authority
Kilkenny County Council
Type
PERMISSION
Status
INCOMPLETED APPLICATION
Site area
3.90 ha
Received
23 Oct 2026

How to submit an observation

  1. Read the file on the council register.Drawings, planning statement and site notices are at http://www.eplanning.ie/KilkennyCC/AppFileRefDetails/2660676/0.
  2. Write your observation.Quote 2660676 at the top, give your name and the address the authority should reply to, and confine it to planning matters — zoning objective, height, overlooking, traffic, drainage, heritage. What you say here is what you can later appeal on.
  3. Pay the €20 fee.Every submission needs it; without it the observation is invalid and is returned. Kilkenny County Council takes it online with the submission or at the counter.
  4. Submit before 27 Nov 2026.Online through the register above, or in writing to the Planning Department, Kilkenny County Council. The test is the date the authority receives it, not the date you post it.
  5. Keep the acknowledgement.The council's receipt is your proof of a valid observation — see below.

Statutory basis. Section 34(1) of the Planning and Development Act 2000 (as amended) requires a planning authority to consider any submission or observation made to it in accordance with the Regulations. Article 29 of the Planning and Development Regulations 2001 (as amended) sets the window: a submission or observation must be received by the authority within five weeks beginning on the date of receipt of the application, and must be accompanied by the prescribed fee of €20. A submission received after the window, or without the fee, is invalid and the authority must return it.

After you submit: keep the acknowledgement. Under the 2024 Act it secures your right to appeal — only the applicant and a person who made a valid observation may bring the council's decision to An Coimisiún Pleanála, within four weeks of the decision. Making a valid observation is also what buys a right of appeal: under s.37(1) of the 2000 Act, only the applicant and a person who made a valid submission or observation to the planning authority may appeal the decision to An Coimisiún Pleanála (within four weeks of the decision). Missing the five-week window closes both doors.

Nearby precedents within 500 m, last 5 years

Decisions

ReferenceDecisionDecidedUnitsDistanceDescription
2560631Conditional20 May 20260 mTirlán Ireland are applying for retention permission for the following existing development. The Existing Development consists of two existing groundwater abstraction wells and associated works for the purpose of water abstraction to serve the existing Facility's Milk Processing Plant (Planning Ref - 12/324). The Existing Development includes the following elements: Two lined boreholes drilled to the required depth; Submersible pumps and associated pipework and cabling; Surface features including cabinets containing the well head, valves and pipework and the electrical services and controls for the pumps; Gated security fencing each cabinet enclosure. An Appropriate Assessment Stage 1 - Screening Report and Environmental Impact Assessment Screening Report will be submitted with the Application.
2560205Refused12 Jun 2025356 mfor development on this site. The proposed development will consist of 10 No. campervan parking bays, alterations to an existing derelict outbuilding to provide for campsite facilities including toilet/shower block, wastewater treatment system and ancillary site works. Proposed works are located within the grounds of a Protected Structure – C481
22247Refused2 Jun 20221345 mto form new vehicular site entrance and construct new single storey dwelling house with wastewater treatment system and percolation beds and install water supply borewell with all associated site works
22245Refused2 Jun 20221317 mto form new vehicular site entrance and construct new single storey dwelling house with wastewater treatment system and percolation beds and install water supply borewell with all associated site works
21989Conditional3 Feb 2022119 mfor development at this site. The development consists of the installation of a Combined Heat and Power (CHP) unit including a 7.55m high stack, stack access ladder and platform, improvements to the internal estate road and ancillary site works at the permitted cheese manufacturing plant, planning permission reference no. 19/668 (APB-306136-19). An Industrial Emissions Licence is required for the cheese manufacturing plant and the proposed development. A Natura Impact Statement will also be submitted with the application.
2144Conditional6 Jan 20220 mfor development. The development will comprise amendments to previously approved development (Planning Ref 12/324; An Bord Pleanala Ref PL10.241077 and Planning Ref 17/153) comprising the development of two boreholes and associated works for the purpose of water abstraction for use in the Milk Processing Plant. The application also seeks permission for the continued use of the existing construction compound for the duration of the works. A Natura Impact Statement will be submitted with the Planning Application. The Glanbia Ireland DAC facility has an Industrial Emissions Licence granted by the EPA

Appeals

ACP caseTypeOutcomeDecidedDistance
324383open18 Jun 20263 m
312631Granted with conditions22 Jan 20240 m

If neighbours here have appealed before and lost, the inspector's report on that case is the single most useful thing to read.

What has happened on this file

  • 23 Oct 2026 New application · observations close 27 Nov 2026
  • 23 Oct 2026 Decision