PlanningRegister.ie
Observation pack · Kilkenny County Council

Knockeenbaun , Kilmanagh , Co. Kilkenny

To construct (i) milking parlour with plant room, Dairy, office, storage, flow channel, crush, meal bin, water tank and collecting yard, slatted tank (ii) walled silage slab and all associated site works

Observations close 4 Dec 2026 13 days left
5 weeks from receipt (received 30 Oct 2026) · s.34 Planning and Development Act 2000 · art. 29 Regulations 2001 · fee €20 · council decision due 2 Jan 2027

The application

Reference
2660688 · full record
Authority
Kilkenny County Council
Type
PERMISSION
Status
NEW APPLICATION
Site area
1.94 ha
Received
30 Oct 2026
Decision due
2 Jan 2027

How to submit an observation

  1. Read the file on the council register.Drawings, planning statement and site notices are at http://www.eplanning.ie/KilkennyCC/AppFileRefDetails/2660688/0.
  2. Write your observation.Quote 2660688 at the top, give your name and the address the authority should reply to, and confine it to planning matters — zoning objective, height, overlooking, traffic, drainage, heritage. What you say here is what you can later appeal on.
  3. Pay the €20 fee.Every submission needs it; without it the observation is invalid and is returned. Kilkenny County Council takes it online with the submission or at the counter.
  4. Submit before 4 Dec 2026.Online through the register above, or in writing to the Planning Department, Kilkenny County Council. The test is the date the authority receives it, not the date you post it.
  5. Keep the acknowledgement.The council's receipt is your proof of a valid observation — see below.

Statutory basis. Section 34(1) of the Planning and Development Act 2000 (as amended) requires a planning authority to consider any submission or observation made to it in accordance with the Regulations. Article 29 of the Planning and Development Regulations 2001 (as amended) sets the window: a submission or observation must be received by the authority within five weeks beginning on the date of receipt of the application, and must be accompanied by the prescribed fee of €20. A submission received after the window, or without the fee, is invalid and the authority must return it.

After you submit: keep the acknowledgement. Under the 2024 Act it secures your right to appeal — only the applicant and a person who made a valid observation may bring the council's decision to An Coimisiún Pleanála, within four weeks of the decision. Making a valid observation is also what buys a right of appeal: under s.37(1) of the 2000 Act, only the applicant and a person who made a valid submission or observation to the planning authority may appeal the decision to An Coimisiún Pleanála (within four weeks of the decision). Missing the five-week window closes both doors.

Nearby precedents within 500 m, last 5 years

Decisions

ReferenceDecisionDecidedDistanceDescription
2560003Refused27 Feb 2025472 mfor a period of 10 years for a development at this site situated in the townlands of Acragar, Ballyconra, Ballycuddihy, Ballyroe, Ballyroe (Grace), Ballyroe (Maher), Baunaniska, Boherkyle, Briskalagh, Brittas, Clone, Coolnapisha, Curraghduff, Freshford, Freshford Lots, Graigueswood, Grange, Huntstown, Kilmanagh, Knockeenglass, Knockown, Moatpark, Monabrika, Monavadaroe, Moneenaun, Oldtown, Oldtownhill, Parksgrove, Picketstown, Rathealy, Sart, Sweethill, Tobernapeastia, Tullaroan, Upperwood Demesne, Co. Kilkenny. The development will consist of the provision of the following: i. 7 no. wind turbines with an overall turbine tip height of 185 metres; a rotor blade diameter of 163 metres; and hub height of 103.5 metres, and associated foundations and hard-standing areas; ii. A permanent 38kV substation compound (control building with welfare facilities, all associated electrical plant and apparatus, security fencing, underground cabling, storage containers, wastewater holding tank, site drainage and all ancillary works); iii. Permanent underground electrical (38kV) and communications cabling to the existing Ballyragget 110kV substation in the townland of Moatpark (including joint bays, communication and earth sheath link chambers and all ancillary works along the route). This cabling route is primarily located within the public road corridor which includes a Protected Structure (Kilkenny RPS Ref. C886); iv. Underground electrical (33kV) and communications cabling connecting the wind turbines and meteorological mast to the on-site substation; v. 3 no. temporary construction compounds (including site offices and welfare facilities); A meteorological mast with a height of 30 metres, security fencing and associated foundation and hard standng area; vii. A new temporary site entrance on the L1009; viii. A new gated site entrance on the L5024; ix. Upgrade of existing site tracks/ roads and provision of new site access roads, junctions and hardstand areas; x. A borrow pit; xi. Spoil Management; xii. Tree felling and hedgerow removal; xiii. Biodiversity Management and Enhancement Plan measures (including establishment of a riparian buffer and hedgerow enhancement); xiv. Site Drainage; xv. Operational Stage site signage; and xvi. All ancillary works and apparatus. A thirty five-year operational life from the date of full commissioning of the wind turbines and subsequent decommissioning of the wind turbines is being sought. An Environmental I

Appeals

ACP caseTypeOutcomeDecidedDistance
322154Granted with conditions21 Aug 2026472 m

If neighbours here have appealed before and lost, the inspector's report on that case is the single most useful thing to read.

What has happened on this file

  • 30 Oct 2026 New application · observations close 4 Dec 2026
  • 30 Oct 2026 Decision

Generated from the Planning Register store; nothing was fetched live for this page. Source: national planning dataset, fetched 3 Nov 2026, 23:01. Not legal advice — confirm the deadline with Kilkenny County Council before relying on it.