PlanningRegister.ie
Observation pack · Laois County Council

Derreen and Carrowreagh , Durrow , Co. Laois

construct a single-storey extension to the side of the existing dwelling, new domestic garage with canopy and all associated site works.

Observations close 20 Oct 2026 22 days left
5 weeks from receipt (received 15 Sept 2026) · s.34 Planning and Development Act 2000 · art. 29 Regulations 2001 · fee €20

The application

Reference
2660648 · full record
Authority
Laois County Council
Type
PERMISSION
Status
INCOMPLETED APPLICATION
Applicant
not published by the national dataset — see the council register
Units
0
Floor area
—
Site area
1,678 m²
Received
15 Sept 2026
We first saw it
22 Sept 2026, 16:10
Decision due
—
Decision
N/a

The national dataset truncates descriptions (80 characters for DLR, 70 for Fingal) and omits the applicant. The full description and the drawings are on the council register linked in step 1.

How to submit an observation

  1. Read the file on the council register.Drawings, planning statement and site notices are at http://www.eplanning.ie/LaoisCC/AppFileRefDetails/2660648/0.
  2. Write your observation.Quote 2660648 at the top, give your name and the address the authority should reply to, and confine it to planning matters — zoning objective, height, overlooking, traffic, drainage, heritage. What you say here is what you can later appeal on.
  3. Pay the €20 fee.Every submission needs it; without it the observation is invalid and is returned. Laois County Council takes it online with the submission or at the counter.
  4. Submit before 20 Oct 2026.Online through the register above, or in writing to the Planning Department, Laois County Council. The test is the date the authority receives it, not the date you post it.
  5. Keep the acknowledgement.The council's receipt is your proof of a valid observation — see below.

Statutory basis. Section 34(1) of the Planning and Development Act 2000 (as amended) requires a planning authority to consider any submission or observation made to it in accordance with the Regulations. Article 29 of the Planning and Development Regulations 2001 (as amended) sets the window: a submission or observation must be received by the authority within five weeks beginning on the date of receipt of the application, and must be accompanied by the prescribed fee of €20. A submission received after the window, or without the fee, is invalid and the authority must return it.

After you submit: keep the acknowledgement. Under the 2024 Act it secures your right to appeal — only the applicant and a person who made a valid observation may bring the council's decision to An Coimisiún Pleanála, within four weeks of the decision. Making a valid observation is also what buys a right of appeal: under s.37(1) of the 2000 Act, only the applicant and a person who made a valid submission or observation to the planning authority may appeal the decision to An Coimisiún Pleanála (within four weeks of the decision). Missing the five-week window closes both doors.

What the site is zoned

No current zoning polygon covers this site in the store.

Designations on or near the site

Nothing designated within 100 m of the site.

Nearby precedents within 500 m, last 5 years

Decisions

ReferenceDecisionDecidedUnitsDistanceDescription
2560177Conditional27 May 20251444 mretain existing extension to dwelling house and all associated ancillary site works
2460593Conditional2 Dec 20240325 mrefurbish existing 43 no. electricity transmission towers along a c. 7.3 km section (length) of the Coolnabacky – Portlaoise 110 kV overhead line (OHL). The total area to which the application relates is c.37 hectares. The development will consist of refurbishment works to the OHL. Refurbishment works will vary from each of the existing 43 no. existing electricity transmission towers and will comprise: (i) Replacement (“restringing”) of the existing overhead line conductor wires with a higher capacity conductor; (ii) Installation of a new fibre communication connection between existing wooden intermediate poleset (IMP) 118 to existing angle mast (AM) 145; (iii) Strengthening of 4 no. existing AMs and associated foundations; (iv) Replacement of 26 of the 37 no. existing IMPs with similar structures, except for existing IMP105 to be upgraded to AM (AM105). Replacements will be in situ or if required, immediately adjacent, and height will range from c. 0m to 2.7m higher, with no change in height in 19 no. existing IMPs and a maximal increase of c. 2.7m at existing IMP127; (v) Replacement of 1 no. AM (AM145) with a Line Cable Interface Mast (LCIM) and removal of 1 no. AM (AM146); (vi) Replacement of crossarms at 12 no. existing IMPs; (vii) Replacement of insulating and ancillary hardware at structures; (viii) All associated site development works along the overhead line including vegetation clearance and management, disassembly and reassembly of gate posts/piers and removal and reinstatement of existing fencing, painting, installation of identification and information labels/notices, and ancillary works within the existing Portlaoise substation, necessary to facilitate the refurbishment works of the overhead line; and, (ix) Other temporary associated and ancillary site development works required for the proposed refurbishment works including the provision of a construction compound located at either Kylekiproe or Esker, access routes, silt traps, silt fences, stone tracks, ground protection mats, infrastructure crossing support systems (e.g., guard poles and goal posts) and temporary watercourse crossings. Where required, an aerial catenary stringing system (ACSS) will be used to facilitate stringing operations over major obstacles (e.g., national roads, rivers, etc.). The planning application will be accompanied by a Natura Impact Statement.
2460594Conditional2 Dec 20241325 mretain dwelling house and attached garage in location as constructed & retention permission for altered site boundaries from that previously granted outline planning permission reference number 792/79 and grant of planning permission reference number 600/80, also retention permission for outbuilding & all ancillary site works

Appeals

No appeals within 500 m in the last 5 years.

What has happened on this file

  • 15 Sept 2026 New application · observations close 20 Oct 2026
  • 15 Sept 2026 Decision

Generated from the Planning Register store; nothing was fetched live for this page. Source: national planning dataset, fetched 22 Sept 2026, 16:10. Not legal advice — confirm the deadline with Laois County Council before relying on it.