Kilclaremore , Kilclare , Co. Leitrim
The development will consist of 1) Proposed demolition of existing Porch to South façade of existing Western annex; 2) Proposed change of use of front part of the Ground floor of the existing Western annex and the entire First floor of the existing building from use as a dwelling to use as short term accommodation; 3) Proposed change of use of rear part of the Ground floor of the existing Western annex from use as a dwelling to use as Kitchen; 4) internal alterations in connection with the proposed change of use; 5) external alterations in connection with the proposed change of use including the installation of new entrance door and windows; 6) proposed external signage & 7) associated site works & services.
The application
- Reference
- 2660238 · full record
- Authority
- Leitrim County Council
- Type
- PERMISSION
- Status
- NEW APPLICATION
- Applicant
- not published by the national dataset — see the council register
- Units
- 0
- Floor area
- —
- Site area
- 2,272 m²
- Received
- 7 Oct 2026
- We first saw it
- 14 Oct 2026, 01:45
- Decision due
- 1 Dec 2026
- Decision
- N/a
The national dataset truncates descriptions (80 characters for DLR, 70 for Fingal) and omits the applicant. The full description and the drawings are on the council register linked in step 1.
How to submit an observation
- Read the file on the council register.Drawings, planning statement and site notices are at http://www.eplanning.ie/LeitrimCC/AppFileRefDetails/2660238/0.
- Write your observation.Quote
2660238at the top, give your name and the address the authority should reply to, and confine it to planning matters — zoning objective, height, overlooking, traffic, drainage, heritage. What you say here is what you can later appeal on. - Pay the €20 fee.Every submission needs it; without it the observation is invalid and is returned. Leitrim County Council takes it online with the submission or at the counter.
- Submit before 11 Nov 2026.Online through the register above, or in writing to the Planning Department, Leitrim County Council. The test is the date the authority receives it, not the date you post it.
- Keep the acknowledgement.The council's receipt is your proof of a valid observation — see below.
Statutory basis. Section 34(1) of the Planning and Development Act 2000 (as amended) requires a planning authority to consider any submission or observation made to it in accordance with the Regulations. Article 29 of the Planning and Development Regulations 2001 (as amended) sets the window: a submission or observation must be received by the authority within five weeks beginning on the date of receipt of the application, and must be accompanied by the prescribed fee of €20. A submission received after the window, or without the fee, is invalid and the authority must return it.
What the site is zoned
| Code | Objective | Plan | In force |
|---|---|---|---|
| G5 Open space and amenity | Open Space & Amenity: To preserve, provide for and improve active and passive recreational public and private open space. | leitrim county development plan 2023 2029 | 21 Mar 2023 → 20 Mar 2029 |
| O2 Green belt | General: To protect and promote the character of the Rural Village and promote a vibrant community appropriate to available physical and community infrastructure. | leitrim county development plan 2023 2029 | 21 Mar 2023 → 20 Mar 2029 |
An application that accords with the zoning objective is hard to resist on principle; one that does not may be a material contravention, which the council can only grant by the s.34(6) procedure with its own notice and window.
Source: Leitrim County Council development plan zoning · fetched 27 Sept 2026, 19:37
| Source | Licence | Fetched | Link |
|---|---|---|---|
| Leitrim County Council development plan zoning | — | 27 Sept 2026, 19:37 | open |
Designations on or near the site
- Recorded monument × 2Ringfort - rath · R168613
Nearby precedents within 500 m, last 5 years
Decisions
| Reference | Decision | Decided | Units | Distance | Description |
|---|---|---|---|---|---|
| 2560140 | Conditional | 22 Jul 2025 | 0 | 0 m | (A) CHANGES TO CONSTRUCTION ON PLANNING REFERENCE P12960, INCLUDING (B) RETENTION OF FRONT ENTRANCE PORCH, (C) SMOKING AREA CANOPY TO REAR AND (D) REAR CONSERVATORY, STOREROOM AND GENERATOR ROOM. |
| 2360126 | Conditional | 26 Apr 2024 | 1 | 248 m | construction Of A Bungalow Type Dwelling House, Detached Garage, Entrance, Boundary Fence/Wall, Onsite Suitable Treatment System With Polishing Filter And All Ancillary Site Works. |
| 2460026 | Conditional | 15 Apr 2024 | 1 | 304 m | retention of (1) first floor dormer accommodation & associated roof windows; & (2) revised site boundaries, from that previously permitted in P.03/1288. The development will consist of permission for (3) the erection of stone cladding on the Front (North West) façade and the front (North West) site boundary wall & piers; (4) associated site works & services. |
| 2360065 | Conditional | 20 Sept 2023 | 1 | 344 m | (a) demolish existing non habitable dwelling house and decommission existing septic tank and percolation area; (b) construct a replacement storey and half bungalow type dwelling house on same footprint as the existing dwelling house, and (c)provide mechanical effluent treatment unit and percolation area, including all ancillary site works necessary to complete the development. |
| 2367 | Conditional | 3 Jul 2023 | 1 | 30 m | (a) removal of roof structure and the addition of a first floor . (b) Internal modifications to include stairs. (c) Extension to the west and north of site. (d) Removal of shed and (e) External modifications including changes to the elevation |
| 22245 | Conditional | 17 May 2023 | 1 | 296 m | new single storey domestic dwelling c/w 6PE PIA Approved WWTS to EPA CoP2021 EN12566-3 with associated percolation area, a New Entrance driveway to include gates and piers, (B) a detached domestic garage . Connection to existing water mains and all other associated site works as required |
| 21258 | Conditional | 6 Dec 2022 | 0 | 284 m | 1. (a) existing steel portal frame structure to the rear of existing commercial building. (b) excavation of existing grounds to cater for the said extension ancillary to No.1. (c) the construction of existing exit roadway from the extension ancillary to No. 1 to the existing exit point onto public road. (d) the hardcore surfacing of the existing roadside parking area |
Appeals
No appeals within 500 m in the last 5 years.
What has happened on this file
- 7 Oct 2026 New application · observations close 11 Nov 2026
- 7 Oct 2026 Decision
Generated from the Planning Register store; nothing was fetched live for this page. Source: national planning dataset, fetched 14 Oct 2026, 01:45. Not legal advice — confirm the deadline with Leitrim County Council before relying on it.