PlanningRegister.ie
Observation pack · Leitrim County Council

Cloone , Co. Leitrim , Co. Leitrim

A) Demolition Of Existing Extension To The Rear Of Cottage Type Dwelling House, B) Removal Of Existing Roof Servicing Existing Cottage Type Dwelling House Together With Raising The Wall Plate And Constructing A New Roof Structure With Habitable Accommodation At First Floor Level, C) Construction Of Extension To The Rear Of Existing Cottage Type Dwelling House, D) Alterations To Various Facades. And All Ancillary Site Works At Cloone, Co. Leitrim (N41 K092) For Michael McHugh And Jennifer Scott

Observations close 18 Dec 2026 23 days left
5 weeks from receipt (received 13 Nov 2026) · s.34 Planning and Development Act 2000 · art. 29 Regulations 2001 · fee €20 · council decision due 16 Jan 2027

The application

Reference
2660276 · full record
Authority
Leitrim County Council
Type
PERMISSION
Status
NEW APPLICATION
Units
1
Floor area
102 m²
Site area
1,015 m²
Received
13 Nov 2026
Decision due
16 Jan 2027

How to submit an observation

  1. Read the file on the council register.Drawings, planning statement and site notices are at http://www.eplanning.ie/LeitrimCC/AppFileRefDetails/2660276/0.
  2. Write your observation.Quote 2660276 at the top, give your name and the address the authority should reply to, and confine it to planning matters — zoning objective, height, overlooking, traffic, drainage, heritage. What you say here is what you can later appeal on.
  3. Pay the €20 fee.Every submission needs it; without it the observation is invalid and is returned. Leitrim County Council takes it online with the submission or at the counter.
  4. Submit before 18 Dec 2026.Online through the register above, or in writing to the Planning Department, Leitrim County Council. The test is the date the authority receives it, not the date you post it.
  5. Keep the acknowledgement.The council's receipt is your proof of a valid observation — see below.

Statutory basis. Section 34(1) of the Planning and Development Act 2000 (as amended) requires a planning authority to consider any submission or observation made to it in accordance with the Regulations. Article 29 of the Planning and Development Regulations 2001 (as amended) sets the window: a submission or observation must be received by the authority within five weeks beginning on the date of receipt of the application, and must be accompanied by the prescribed fee of €20. A submission received after the window, or without the fee, is invalid and the authority must return it.

After you submit: keep the acknowledgement. Under the 2024 Act it secures your right to appeal — only the applicant and a person who made a valid observation may bring the council's decision to An Coimisiún Pleanála, within four weeks of the decision. Making a valid observation is also what buys a right of appeal: under s.37(1) of the 2000 Act, only the applicant and a person who made a valid submission or observation to the planning authority may appeal the decision to An Coimisiún Pleanála (within four weeks of the decision). Missing the five-week window closes both doors.

What the site is zoned

CodeObjectivePlanIn force
O2
Green belt
General: To protect and promote the character of the Rural Village and promote a vibrant community appropriate to available physical and community infrastructure.leitrim county development plan 2023 202921 Mar 2023 → 20 Mar 2029

An application that accords with the zoning objective is hard to resist on principle; one that does not may be a material contravention, which the council can only grant by the s.34(6) procedure with its own notice and window.

Source: Leitrim County Council development plan zoning · fetched 27 Sept 2026, 19:37
SourceLicenceFetchedLink
Leitrim County Council development plan zoning—27 Sept 2026, 19:37open

Nearby precedents within 500 m, last 5 years

Decisions

ReferenceDecisionDecidedUnitsDistanceDescription
2660234Conditional23 Nov 2026306 mProposed Construction Of A Domestic Garage To Service A Storey And A Half Type Dwelling Which Was Recently Granted Planning Permission Under Outline Planning Permission Reference No. P.25/60122 And Consequent On The Grant Of Outline Permission Reference No. P.26/60060 And All Ancillary Site Works
2660060Conditional30 Apr 20261306 mProposed construction of a storey-and-a-half dwelling house, detached garage, entrance, boundary fence/wall, proposed connection to the existing foul sewer network, and all ancillary site works.
2560171Conditional18 Aug 2025112 mfor the proposed construction of a storey and a half type dwelling house, connection to existing foul sewer network, entrance, boundary fence/wall and all ancillary site works
2560122Conditional1 Jul 20251306 mOutline planning permission is being sought from Leitrim County Council for the proposed construction of a storey and a half type dwelling house, connection to existing foul sewer network, entrance, boundary fence/wall and all ancillary site works
21194Conditional12 Jan 20221351 mconstruction of an extension to the rear and side of an existing two storey type dwelling house where the proposed extension has both a two storey and single storey element together with alterations to the side of the existing dwelling house to incorporate the modification of existing window ope into a door ope and all ancillary works

What has happened on this file

  • 13 Nov 2026 New application · observations close 18 Dec 2026
  • 13 Nov 2026 Decision

Generated from the Planning Register store; nothing was fetched live for this page. Source: national planning dataset, fetched 24 Nov 2026, 23:00. Not legal advice — confirm the deadline with Leitrim County Council before relying on it.