Stradbally North , Castleconnell , Co. Limerick
A porch to the front of our house, a kitchen/dining room and a conservatory to the rear of our house
The application
- Reference
- 26256 · full record
- Authority
- Limerick City and County Council
- Type
- RETENTION
- Status
- NEW APPLICATION
- Site area
- 4,561 m²
- Received
- 2 Nov 2026
- Decision due
- 6 Jan 2027
How to submit an observation
- Read the file on the council register.Drawings, planning statement and site notices are at https://eplanning.ie/LimerickCCC/AppFileRefDetails/26256/0.
- Write your observation.Quote
26256at the top, give your name and the address the authority should reply to, and confine it to planning matters — zoning objective, height, overlooking, traffic, drainage, heritage. What you say here is what you can later appeal on. - Pay the €20 fee.Every submission needs it; without it the observation is invalid and is returned. Limerick City and County Council takes it online with the submission or at the counter.
- Submit before 7 Dec 2026.Online through the register above, or in writing to the Planning Department, Limerick City and County Council. The test is the date the authority receives it, not the date you post it.
- Keep the acknowledgement.The council's receipt is your proof of a valid observation — see below.
Statutory basis. Section 34(1) of the Planning and Development Act 2000 (as amended) requires a planning authority to consider any submission or observation made to it in accordance with the Regulations. Article 29 of the Planning and Development Regulations 2001 (as amended) sets the window: a submission or observation must be received by the authority within five weeks beginning on the date of receipt of the application, and must be accompanied by the prescribed fee of €20. A submission received after the window, or without the fee, is invalid and the authority must return it.
Nearby precedents within 500 m, last 5 years
Decisions
| Reference | Decision | Decided | Units | Distance | Description |
|---|---|---|---|---|---|
| 26130 | Conditional | 29 Jul 2026 | 232 m | an existing single storey domestic garage/shed type structure located to rear garden currently used as a home gym/office | |
| 25337 | Refused | 3 Dec 2025 | 1 | 63 m | a single storey dwelling with attic development, entrance, connected to public services and all ancillary site works |
| 2460030 | Refused | 3 Oct 2024 | 16 | 436 m | the provision of 7 no. 2 bed 3 person dwellings, 7 no. 2 bed 4 person dwellings for senior living and 2 community dwellings each with 4 bedrooms plus 1 carer bedroom and communal areas for senior living, together with modifications to existing site levels and all associated landscaping and site works and connection to existing services |
| 2460334 | Conditional | 7 Jun 2024 | 442 m | (i) the provision of a new single storey office building of 242m²; (ii) a fabrication workshop of 1943m² with adjoining two storey mezzanine of 311.4m², with staff facilities at the ground floor & offices at the first floor; (iii) a paint shed of 200m²; (iv) a gas bottle storage cage of 12m²; (v) Signage Pylon to the entrance (vi) ESB sub-station and switch room of 24m² &; (vii) 30No. surface parking bay including 3No. EV charging bays, secure bicycle shelter, hard standing, hard & soft landscaping, boundary treatment to the perimeter of the site, entrance gates, site lighting & all associated site works; this application is accompanied by an EIA screening report, a Natura Impact Statement (NIS) & a screening statement for Appropriate Assessment | |
| 2360866 | Conditional | 10 May 2024 | 74 | 397 m | an extension to the existing Coolbawn Estate in the townlands of Coolbane and Coolreiry at Castleconnell, Co. Limerick. The development comprises (i) 74 no. residential units comprising (a) 20 no. 4 bed detached units; (b) 12 no. 4 bed semi-detached units; (c) 12 no. 2 bed terrace units; (d) 12 no. 3 bed terrace units; and (e) 18 no. 3 bed semi-detached units (ii) new estate link road with dedicated cycle lane as an extension to the existing access road serving Coolbawn Estate; (iii) off and on street car parking and bicycle stands; and (iv) all associated site works including pumping station and emergency storage; and 2 no. attenuation tanks. The existing temporary construction access from Station Road / Railway Road shall continue to be used to facilitate construction of the development. A Natura Impact Statement has been prepared in respect of the proposed development and accompanies the planning application |
| 2360208 | Conditional | 31 May 2023 | 443 m | the construction of a two-storey extension to the side of the existing house, a single storey extension to the rear of the existing house and all ancillary site works | |
| 22308 | Conditional | 5 May 2022 | 253 m | the construction of a single storey extension to the side and front of the existing dwelling, a single storey extension to the side and rear of the existing dwelling, construction of a detached single storey storage shed and ancillary site works | |
| 211735 | Conditional | 22 Mar 2022 | 1 | 388 m | a replacement percolation area consisting of a pump station and an ecoflo tertiary filter unit to the existing septic tank and a recessed site entrance as built |
Appeals
| ACP case | Type | Outcome | Decided | Distance |
|---|---|---|---|---|
| 321152 | Granted with conditions | 12 Mar 2025 | 436 m |
If neighbours here have appealed before and lost, the inspector's report on that case is the single most useful thing to read.
What has happened on this file
- 2 Nov 2026 New application · observations close 7 Dec 2026
- 2 Nov 2026 Decision
Generated from the Planning Register store; nothing was fetched live for this page. Source: national planning dataset, fetched 24 Nov 2026, 23:00. Not legal advice — confirm the deadline with Limerick City and County Council before relying on it.