PlanningRegister.ie
Observation pack · Limerick City and County Council

Kilmoylan Lower , Doon , Co. Limerick

the construction of a detached Gym / Weights building for training purposes adjacent to existing dressing rooms together with all associated site works at the existing sports grounds

Observations close 12 Oct 2026 18 days left
5 weeks from receipt (received 7 Sept 2026) · s.34 Planning and Development Act 2000 · art. 29 Regulations 2001 · fee 20 · council decision due 1 Nov 2026

The application

Reference
2661028 · full record
Authority
Limerick City and County Council
Type
PERMISSION
Status
NEW APPLICATION
Applicant
not published by the national dataset — see the council register
Units
0
Floor area
Site area
3.54 ha
Received
7 Sept 2026
We first saw it
18 Sept 2026, 15:44
Decision due
1 Nov 2026
Decision
N/a

The national dataset truncates descriptions (80 characters for DLR, 70 for Fingal) and omits the applicant. The full description and the drawings are on the council register linked in step 1.

How to submit an observation

  1. Read the file on the council register.Drawings, planning statement and site notices are at https://eplanning.ie/LimerickCCC/AppFileRefDetails/2661028/0.
  2. Write your observation.Quote 2661028 at the top, give your name and the address the authority should reply to, and confine it to planning matters — zoning objective, height, overlooking, traffic, drainage, heritage. What you say here is what you can later appeal on.
  3. Pay the €20 fee.Every submission needs it; without it the observation is invalid and is returned. Limerick City and County Council takes it online with the submission or at the counter.
  4. Submit before 12 Oct 2026.Online through the register above, or in writing to the Planning Department, Limerick City and County Council. The test is the date the authority receives it, not the date you post it.
  5. Keep the acknowledgement.The council's receipt is your proof of a valid observation — see below.

Statutory basis. Section 34(1) of the Planning and Development Act 2000 (as amended) requires a planning authority to consider any submission or observation made to it in accordance with the Regulations. Article 29 of the Planning and Development Regulations 2001 (as amended) sets the window: a submission or observation must be received by the authority within five weeks beginning on the date of receipt of the application, and must be accompanied by the prescribed fee of €20. A submission received after the window, or without the fee, is invalid and the authority must return it.

After you submit: keep the acknowledgement. Under the 2024 Act it secures your right to appeal — only the applicant and a person who made a valid observation may bring the council's decision to An Coimisiún Pleanála, within four weeks of the decision. Making a valid observation is also what buys a right of appeal: under s.37(1) of the 2000 Act, only the applicant and a person who made a valid submission or observation to the planning authority may appeal the decision to An Coimisiún Pleanála (within four weeks of the decision). Missing the five-week window closes both doors.

What the site is zoned

No current zoning polygon covers this site in the store.

Designations on or near the site

Nothing designated within 100 m of the site.

Nearby precedents within 500 m, last 5 years

Decisions

ReferenceDecisionDecidedUnitsDistanceDescription
2660193Conditional15 Jun 20260425 ma new single storey school building (100m2), soft play area (50 m2), and all associated site works
2660383Conditional27 May 20260297 mthe construction of an extension to existing dwelling house including all ancillary site works
2660354Conditional20 May 20261185 mthe merging of 2 No. dwelling units into a single dwelling unit & all associated site works
2660305Conditional12 May 202600 mthe construction of an all-weather playing pitch with an integrated hurling ball-wall and an adjoining pitch for sensory-use, together with perimeter fencing, lighting, and all associated site works at the existing sports grounds
267017Refused1 Apr 20260213 mchange of use of former farmyard (Buildings A and C) to micro artisan food production unit with ancillary offices, meeting room, storage and toilet facilities. Construction of a glazed link with social dining space to the Eastern courtyard elevation of farmyard building A. Change of use of former Laundry Buildings (Buildings B1 and B2) to an eHub space with computing, social space/conference room, office and toilet facilities. Construction of a single storey flat roofed corner link extension to connect buildings B1 and B2 together. Erection of retractable fabric canopies to the farmyard space varying in height between 3.8 to 4.5 metres. Change of use of farmyard courtyard to be used as a local farmers market space & all associated site works. Doon Social Farm is on the grounds of the Sisters of Mercy Convent Doon and this is on the NIAH(National Inventory of Architectural Heritage) Schedule, Ref No: 21809006. The Convent building complex and curtilage is a candidate Protected Structure. Original Planning Ref. No. 21/216
267018Refused1 Apr 20260158 mmaterial change of use of ground floor section in the North West corner of former St. Joseph's Secondary School to medical centre use, minor internal alterations, reroofing of lean-to roof section on North elevation with new velux type roof lights and all ancillary site works. Former St. Joseph's Secondary School is on the grounds of the Sisters of Mercy Convent Doon and this is on the NIAH(National Inventory of Architectural Heritage) Schedule, Ref No. 21809006. The Convent building complex and curtilage is a candidate Protected Structure. Original Planning Ref. No. 21/349
2461182Conditional20 Nov 202527353 mconstruction of 28 residential units consisting of 3 no. three bed detached dwellings, 6 no. two bed semi-detached dwellings, 8 no. two bed terraced dwellings, 8 no. three bed terraced dwellings, 1 no. apartment block containing 2 no. two bed apartments, together with entrance, estate road, cycle path, footpaths, car parking and bicycle stands and associated site works including attenuation tanks and surface water outfall. Outline planning permission sought for 10 no. serviced site together with estate road, footpaths and associated site works
2461219Conditional26 Aug 20250123 mconversion / change of use of three storey convent building to accommodate 23 No: independent community living use apartments. The proposed works consist of the following: 1. The provision of a new entrance roadway to the east side onto main street (R505). 2. Removal of sections of boundary walls to main street. 3. Construction of a new car park. 4. Removal of later 20th century extensions. 5. Addition of two three storey end block extensions. 6. Provision of a commercial kitchen on the ground floor of the proposed east block extension. 7. Provision of seating in the east ground floor wing of the convent. 8. Provision of new door ope to southern courtyard to restaurant terrace. 9. Provision of PV panels on the south facing roof slope of the central convent block. 10. Alterations to the internal layouts. 11. Repairs to the historical fabric of the building. 12. All associated site works. Sisters of Mercy Convent Doon is on the NIAH (National Inventory of Architectural Heritage) Schedule, Ref No: 21809006. The Convent building complex and curtilage is a candidate Protected Structure.

Appeals

ACP caseTypeOutcomeDecidedDistance
500492Granted with conditions30 Mar 2026353 m
324164pending27 Mar 2026160 m

If neighbours here have appealed before and lost, the inspector's report on that case is the single most useful thing to read.

What has happened on this file

  • 7 Sept 2026 New application · observations close 12 Oct 2026
  • 7 Sept 2026 Decision

Generated from the Planning Register store; nothing was fetched live for this page. Source: national planning dataset, fetched 18 Sept 2026, 15:44. Not legal advice — confirm the deadline with Limerick City and County Council before relying on it.