PlanningRegister.ie
Observation pack · Limerick City and County Council

Ballycarrane , Patrickwell , Co. Limerick

the relocation of the vehicular access serving existing dwelling house, together with all associated site works

Observations close 13 Oct 2026 20 days left
5 weeks from receipt (received 8 Sept 2026) · s.34 Planning and Development Act 2000 · art. 29 Regulations 2001 · fee 20 · council decision due 2 Nov 2026

The application

Reference
2661046 · full record
Authority
Limerick City and County Council
Type
PERMISSION
Status
NEW APPLICATION
Applicant
not published by the national dataset — see the council register
Units
0
Floor area
Site area
4,990 m²
Received
8 Sept 2026
We first saw it
22 Sept 2026, 16:10
Decision due
2 Nov 2026
Decision
N/a

The national dataset truncates descriptions (80 characters for DLR, 70 for Fingal) and omits the applicant. The full description and the drawings are on the council register linked in step 1.

How to submit an observation

  1. Read the file on the council register.Drawings, planning statement and site notices are at https://eplanning.ie/LimerickCCC/AppFileRefDetails/2661046/0.
  2. Write your observation.Quote 2661046 at the top, give your name and the address the authority should reply to, and confine it to planning matters — zoning objective, height, overlooking, traffic, drainage, heritage. What you say here is what you can later appeal on.
  3. Pay the €20 fee.Every submission needs it; without it the observation is invalid and is returned. Limerick City and County Council takes it online with the submission or at the counter.
  4. Submit before 13 Oct 2026.Online through the register above, or in writing to the Planning Department, Limerick City and County Council. The test is the date the authority receives it, not the date you post it.
  5. Keep the acknowledgement.The council's receipt is your proof of a valid observation — see below.

Statutory basis. Section 34(1) of the Planning and Development Act 2000 (as amended) requires a planning authority to consider any submission or observation made to it in accordance with the Regulations. Article 29 of the Planning and Development Regulations 2001 (as amended) sets the window: a submission or observation must be received by the authority within five weeks beginning on the date of receipt of the application, and must be accompanied by the prescribed fee of €20. A submission received after the window, or without the fee, is invalid and the authority must return it.

After you submit: keep the acknowledgement. Under the 2024 Act it secures your right to appeal — only the applicant and a person who made a valid observation may bring the council's decision to An Coimisiún Pleanála, within four weeks of the decision. Making a valid observation is also what buys a right of appeal: under s.37(1) of the 2000 Act, only the applicant and a person who made a valid submission or observation to the planning authority may appeal the decision to An Coimisiún Pleanála (within four weeks of the decision). Missing the five-week window closes both doors.

What the site is zoned

No current zoning polygon covers this site in the store.

Designations on or near the site

Nothing designated within 100 m of the site.

Nearby precedents within 500 m, last 5 years

Decisions

ReferenceDecisionDecidedUnitsDistanceDescription
26119Refused2 Jul 20260400 magricultural building comprising tack room and changing facility and all associated site works
2660092Conditional25 Mar 20260207 mthe installation of a 30-metre high lattice telecommunications support structure accommodating antennas, dishes, remote radio units (RRU’s), lightning finial and all associated equipment; ground based equipment cabinets within a compound enclosed by 2.4 metre high palisade fencing with a 1.0 metre wide access gate; fibre chamber; construction of a new access track connecting compound to the existing access track; concrete foundation and all associated site development works to provide for high-speed wireless data and broadband services
2461102Conditional9 Jan 2025092 ma detached single storey garage to the rear of the dwelling (currently under construction) along with all associated site works
2461094Conditional8 Jan 202510 mthe construction of a vehicular entrance, dwelling house, domestic garage, proprietary waste water treatment system with polishing filter together with all associated site works
2360270Conditional20 Jul 2023192 mto construct a replacement dwelling and demolition of existing semi-derelict dwelling. The replacement dwelling to be accessed via an new vehicular driveway and to be served by a new proprietary wastewater treatment system with polishing filter along with all utility connections and associated site works
221180Conditional8 Mar 20230145 mthe construction of a slatted underground slurry storage, a shed covering the slatted area and associated site works

Appeals

ACP caseTypeOutcomeDecidedDistance
501743open22 Jul 2026400 m
306146Granted with conditions30 Aug 2022280 m
306199Granted30 Aug 2022280 m

If neighbours here have appealed before and lost, the inspector's report on that case is the single most useful thing to read.

What has happened on this file

  • 8 Sept 2026 New application · observations close 13 Oct 2026
  • 8 Sept 2026 Decision

Generated from the Planning Register store; nothing was fetched live for this page. Source: national planning dataset, fetched 22 Sept 2026, 16:10. Not legal advice — confirm the deadline with Limerick City and County Council before relying on it.