Tervoe , Clarina , Co Limerick
- the construction of an all-weather Astro turf pitch including associated perimeter fencing and ancillary facilities; -installation of floodlights to serve the playing pitch -provision of a walking track around the perimeter of the pitch -Construction of Running Track -upgrade of existing surface water drainage infrastructure including improvements to the stormwater soakaway system -all associated site development works
The five-week window has passed. Late observations are returned unread. If the council has decided, the next door is the appeal window — but under s.37 only the applicant and those who made a valid observation may appeal.
The application
- Reference
- 2661094 · full record
- Authority
- Limerick City and County Council
- Type
- PERMISSION
- Status
- NEW APPLICATION
- Applicant
- not published by the national dataset — see the council register
- Units
- 0
- Floor area
- —
- Site area
- 2.23 ha
- Received
- 18 Sept 2026
- We first saw it
- 29 Sept 2026, 23:03
- Decision due
- 12 Nov 2026
- Decision
- N/a
The national dataset truncates descriptions (80 characters for DLR, 70 for Fingal) and omits the applicant. The full description and the drawings are on the council register linked in step 1.
How to submit an observation
- Read the file on the council register.Drawings, planning statement and site notices are at https://eplanning.ie/LimerickCCC/AppFileRefDetails/2661094/0.
- Write your observation.Quote
2661094at the top, give your name and the address the authority should reply to, and confine it to planning matters — zoning objective, height, overlooking, traffic, drainage, heritage. What you say here is what you can later appeal on. - Pay the €20 fee.Every submission needs it; without it the observation is invalid and is returned. Limerick City and County Council takes it online with the submission or at the counter.
- Submit before 23 Oct 2026.Online through the register above, or in writing to the Planning Department, Limerick City and County Council. The test is the date the authority receives it, not the date you post it.
- Keep the acknowledgement.The council's receipt is your proof of a valid observation — see below.
Statutory basis. Section 34(1) of the Planning and Development Act 2000 (as amended) requires a planning authority to consider any submission or observation made to it in accordance with the Regulations. Article 29 of the Planning and Development Regulations 2001 (as amended) sets the window: a submission or observation must be received by the authority within five weeks beginning on the date of receipt of the application, and must be accompanied by the prescribed fee of €20. A submission received after the window, or without the fee, is invalid and the authority must return it.
What the site is zoned
No current zoning polygon covers this site in the store.
Designations on or near the site
Nothing designated within 100 m of the site.
Nearby precedents within 500 m, last 5 years
Decisions
| Reference | Decision | Decided | Units | Distance | Description |
|---|---|---|---|---|---|
| 2460965 | Conditional | 21 Nov 2024 | 4 | 343 m | a change of house design for plot no. 2, 3 & 4, change of garage design for plot no. 4, and revised site boundaries for plot no. 3 & 4 from that previously granted under Planning Reference 23/60277 |
| 2360277 | Conditional | 14 Dec 2023 | 4 | 343 m | the construction of a cluster of 4 no. single storey dwelling houses each with domestic garage, entrance, proprietary treatment system and soil polishing filter with connection to public water supply, one main entrance from local road and all associated site works |
| 22423 | Conditional | 23 Mar 2023 | 1 | 96 m | the construction of a dwelling house, entrance, installation of on-site treatment plant and percolation area together with all associated site works |
| 221110 | Conditional | 28 Feb 2023 | 0 | 242 m | demolition of existing substandard rear extension (36.4 sq.m) and replace it with a granny flat (110.57 sq.m) to include associated renovation works and site works |
| 22766 | Refused | 25 Aug 2022 | 1 | 499 m | the demolition of an existing garage and part of existing house and for the construction of a granny flat connecting to existing dwelling house, new garage and all ancillary site works |
| 2210 | Conditional | 20 Apr 2022 | 0 | 87 m | domestic store as constructed and all associated site works |
| 211144 | Conditional | 16 Dec 2021 | 1 | 486 m | construction of a dormer bungalow, detached garage, new entrance, wastewater treatment system and ancillary site works |
| 21744 | Conditional | 15 Nov 2021 | 2 | 257 m | the construction of a dwelling house, garage, entrance, wastewater treatment system and ancillary site works |
Appeals
| ACP case | Type | Outcome | Decided | Distance |
|---|---|---|---|---|
| 316255 | — | Granted with conditions | 20 Mar 2024 | 96 m |
| 314624 | — | Refused | 21 Aug 2023 | 499 m |
If neighbours here have appealed before and lost, the inspector's report on that case is the single most useful thing to read.
What has happened on this file
- 18 Sept 2026 New application · observations close 23 Oct 2026
- 18 Sept 2026 Decision
Generated from the Planning Register store; nothing was fetched live for this page. Source: national planning dataset, fetched 29 Sept 2026, 23:03. Not legal advice — confirm the deadline with Limerick City and County Council before relying on it.